CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*001

2. TITLE OF DATA ITEM

STATUS REPORT

3. SUBTITLE

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MGMT-80368/M

5. CONTRACT REFERENCE

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT MONTHLY SEE BLK 16 b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

N/A D SEE BLK 16 Draft

Reg Repro

16. REMARKS -EN-E 5

**-CM-CT

INITIAL REPORT IS TO COVER PERIOD TO END OF FIRST FULL

MONTH FOLLOWING CONTRACT AWARD. REPORT IS DUE 15 DAYS

AFTER COMPLETION OF EACH MONTH’S EFFORT. WHEN REPORT

IS PRESENTED ORALLY, PROVIDE COPIES OF VUGRAPHS AND

NARRATIVES TO ATTENDEES AT THE MEETING NTE 10 COPIES.

TAILOR DID AS FOLLOWS: DELETE 10.2.2.2.

SUBMIT EMAIL COPY AND MAIL HARD COPY

CONTRACTOR FORMAT ACCEPTABLE.

**LETTER OF TRANSMITTAL ONLY.

15. TOTAL ---> 5

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Page 1 of 15 Pages

DD Form 1423-1, JUN 90 (COMPUTER GENERATED) Previous editions are obsolete

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*002

2. TITLE OF DATA ITEM

PRESENTATION MATERIAL

3. SUBTITLE

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-ADMN-81373

5. CONTRACT REFERENCE

4.1, 4.2

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT ASREQ SEE BLK 16 b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

N/A D SEE BLK 16 Draft

Reg Repro

16. REMARKS -EN-E 10

PRESENT HARD COPIES, VUGRAPHS, AND NARRATIVES TO EACH **-CM-CT

MEETING ATTENDEE.

CONTRACTOR FORMAT ACCEPTABLE.

**LETTER OF TRANSMITTAL ONLY.

SUBMIT EMAIL COPY, MAIL HARD COPY AND CD.

15. TOTAL ---> 10

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Page 2 of 15 Pages

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*003

2. TITLE OF DATA ITEM

CONFERENCE MINUTES

3. SUBTITLE

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-ADMN-81250A

5. CONTRACT REFERENCE

4.1, 4.2

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT ASREQ SEE BLK 16 b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

A D SEE BLK 16 Draft

Reg Repro

16. REMARKS -EN-E 5

SUBMIT 15 DAYS AFTER MEETING. THE CONTRACTOR SHALL **-CM-CT

PREPARE AND DELIVER THE PROGRAMMATIC AND TECHNICAL

PLANS, REPORTS, AND OTHER DATA TO THE GOVERNMENT IN

ACCORDANCE WITH THE REQUIREMENTS SET FORTH IN THE

CONTRACT DATA REQUIREMENTS LIST (CDRL).

CONTRACTOR FORMAT ACCEPTABLE.

APPROVAL: G30/C30.

**LETTER OF TRANSMITTAL ONLY.

SUBMIT EMAIL COPY ONLY

15. TOTAL ---> 5

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Page 3 of 15 Pages

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*004

2. TITLE OF DATA ITEM

FUNDS AND MAN-HOUR EXPENDITURE REPORT

3. SUBTITLE

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-FNCL-80331/M

5. CONTRACT REFERENCE

4.2

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT MONTHLY SEE BLK 16 b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

N/A D

SEE BLK 16 Draft Reg Repro

16. REMARKS -EN-E 2

**-CM-CT

FIRST REPORT DUE 15 DAYS AFTER FIRST FULL ACCOUNTING

PERIOD FOLLOWING ISSUANCE OF FIRST TASK ASSIGNMENT. -RD-C 1

SUBSEQUENT REPORTS DUE 15 DAYS AFTER CLOSE OF ACCTG

PERIOD. SUBMISSIONS SHALL INCLUDE THE FORMATTED FUNDS

AND MAN-HOUR EXPENDITURE SUMMARY (SEE FIG. 1 OF DID) AND

A COLUMNED REPORT REFLECTING THE TIME-PHASED

EXPENDITURES AND MANHOURS FORECAST BY MONTH THROUGH

THE PERIOD OF PERFORMANCE. THE TIME-PHASED EXPENDITURES

AND FORECAST WILL BE CUMULATIVE. A FORMATTED REPORT AND

COLUMNED REPORT WILL BE SUBMITTED FOR EACH TASK ORDER

AND FOR THE TOTAL CONTRACT.

CONTRACTOR FORMAT ACCEPTABLE.

ELECTRONIC SUBMISSION REQUIRED IN MICROSOFT OFFICE

COMPATIBLE SOFTWARE.

FOR EACH TASK ASSIGNMENT: MONTHLY GRAPHICS SHOWING

PLANNED, OBLIGATED, EXPENDED (ACTUALS & COMMITTED).

PROJECTIONS FOR NEXT MONTHS EXPENDITURES ACCOMPANYING

SPREADSHEET.

**LETTER OF TRANSMITTAL ONLY.

TAILOR DID AS FOLLOWS: DELETE PARA 10.1.b & c, 10.3.2, AND 10.3.3.

15. TOTAL ---> 3

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Page 4 of 15 Pages

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*005

2. TITLE OF DATA ITEM

PROGRAM PROGRESS REPORT

3. SUBTITLE

TASK ASSIGNMENT PLAN

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MGMT-80555

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT ASREQ SEE BLK 16 b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

NA SEE BLK 16

Draft

Reg Repro

16. REMARKS -EN-E 2

**-CM-CT

PLAN DUE 7 DAYS AFTER RECEIPT OF EACH TO. APPROVAL IAW -RD-C 1

PROCEDURES DEFINED IN SECTION H OF THE CONTRACT. THE

CONTRACTOR SHALL PREPARE AND DELIVER THE PROGRAMMATIC

AND TECHNICAL PLANS, REPORTS, AND OTHER DATA TO THE

GOVERNMENT IN ACCORDANCE WITH THE REQUIREMENTS SET

FORTH IN THE CONTRACT DATA REQUIREMENTS LIST (CDRL).

CONTRACTOR FORMAT ACCEPTABLE.

APPROVAL: G7/C7

COST SCHEDULE SPEND PLAN BROKEN OUT BY COST ELEMENTS

(E.G. LABOR, MATERIALS, TRAVEL, ETC)

PROVIDE BRIEF EXECUTIVE SUMMARY OF WORK TO BE PERFORMED.

ALSO PROVIDE TEAM STRUCTURE.

**LETTER OF TRANSMITTAL ONLY.

15. TOTAL ---> 3

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

DD Form 1423-1, JUN 90 (COMPUTER GENERATED)

Pages Previous editions are obsolete

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*007

2. TITLE OF DATA ITEM

TECHNICAL REPORT-STUDY/SERVICES

3. SUBTITLE

ENV-IMPACT ANALYSIS PROCESS

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MISC-80508A

5. CONTRACT REFERENCE

4.2

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT ANNLY AS REQ b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

A D ANNUALLY

Draft

Reg Repro

16. REMARKS -EN-E 10

**-CM-CT

THE CONTRACT SHALL PREPARE AND DELIVER THE

PROGRAMMATIC AND TECHNICAL PLANS, REPORTS, AND OTHER

DATA TO THE GOVERNMENT IN ACCORDANCE WITH THE

REQUIREMENTS SET FORTH IN THE CONTRACT DATA

REQUIREMENTS LIST (CDRL).

CONTRACTOR FORMAT ACCEPTABLE.

APPROVAL: G30/C30.

**LETTER OF TRANSMITTAL ONLY

MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY

WEBSITE.

SUBMIT REPORT ON CD AND HARDCOPY.

15. TOTAL ---> 10

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

DD Form 1423-1, JUN 90 (COMPUTER GENERATED)

Page 6 of 14 Pages

Previous editions are obsolete

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*008

2. TITLE OF DATA ITEM

TECHNICAL REPORT-STUDY/SERVICES

3. SUBTITLE

DESCRIPTION OF PROPOSED ACTION

AND ALTERNATIVE

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MISC-80508A

5. CONTRACT REFERENCE

4.2

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT AS REQ AS REQ b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

A D AS REQ Draft

Reg Repro

16. REMARKS -EN-E 10

**-CM-CT

EACH DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVE

(DOPAA) SHALL AT A MINIMUM INCLUDE THE FOLLOWING

HEADING: A) BACKGROUND/PURPOSE; B) NEED TO IMPLEMENT

THE PROPOSED ACTION/EVALUATION CRITERIA THAT WOULD

OCCUR AS A RESULT OF THE PROPOSED ACTION; C) ALTERNATIVE

EVALUATED.

CONTRACTOR FORMAT ACCEPTABLE.

**LETTER OF TRANSMITTAL ONLY.

APPROVAL: G30/C30.

MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY

WEBSITE.

SUBMIT REPORT ON CD AND HARDCOPY.

15. TOTAL ---> 10

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE 14 Pages

DD Form 1423-1, JUN 90 (COMPUTER GENERATED) of Previous editions are obsolete

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*009

2. TITLE OF DATA ITEM

TECHNICAL REPORT-STUDY/SERVICES

3. SUBTITLE

ENVIRONMENTAL ASSESSMENT (EA)

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MISC-80508A

5. CONTRACT REFERENCE

4.2

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

D Draft

Reg Repro

16. REMARKS -EN-E 10

**-CM-CT

THE HEADING SHALL FOLLOW APPENDIX B, AR 200-02. SUBMIT

EACH EA IAW APPROVED SCHEDULE. THE EAs PREPARED FOR PUBLIC

REVIEW SHALL BE PREPARED ON RECYCLED PAPER AND PROVIDED

IN CD ROM FORMAT ACCESSIBLE ON EXISTING USASMDC HARDWARE

AND SOFTWARE.

APPROVAL: G30/C30.

**LETTER OF TRANSMITTAL ONLY.

MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY

WEBSITE.

SUBMIT REPORT ON CD AND HARDCOPY.

15. TOTAL ---> 10

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE 14 Pages

DD Form 1423-1, JUN 90 (COMPUTER GENERATED)

Page 8 of

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*00A

2. TITLE OF DATA ITEM

TECHNICAL REPORT-STUDY/SERVICES

3. SUBTITLE

SPECIAL REPORTS OR LETTER

REPORTS

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MISC-80508A

5. CONTRACT REFERENCE

4.1, 4.2

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT AS REQ SEE BLK 16 b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final N/A

D SEE BLK 16

Draft

Reg Repro

16. REMARKS -EN-E 4

**-CM-CT

SUBMIT REPORTS WHEN THE NEED IS RECOGNIZED BY THE ***-SO 1

GOVERNMENT OR CONTRACTOR WITHIN 30 DAYS OF COMPLETION

OF REVIEW OR EVENT BEING REPORTED. THE CONTRACTOR

SHALL PREPARE AND DELIVER THE PROGRAMMATIC AND

TECHNICAL PLANS, REPORTS, AND OTHER DATA TO THE

GOVERNMENT IN ACCORDANCE WITH THE REQUIREMENTS SET

FORTH IN THE CDRL. CONTRACTOR FORMAT ACCEPTABLE.

**LETTER OF TRANSMITTAL ONLY.

SUBMIT REPORT ( EMAIL, CD OR PAPER) AS SPECIFIED BY TASK

ORDER.

SMDC-SO WILL RECEIVE A REPORT FOR PARA. 3.1.1 AND 3.1.7 ONLY.

15. TOTAL ---> 5

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

DD Form 1423-1, JUN 90 (COMPUTER GENERATED)

Page 9 of 14 Pages

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*00B

2. TITLE OF DATA ITEM

TECHNICAL REPORT-STUDY/SERVICES

3. SUBTITLE

REMEDIAL INVESTIGATION

FEASIBILITY STUDY WORK PLAN

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MISC-80508A

5. CONTRACT REFERENCE

3.1.2

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT AS REQ AS REQ b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

A D AS REQ

Draft

Reg Repro

16. REMARKS -EN-E 8 8

WORK PLAN REPORTS SHALL BE PREPARED IAW **-CM-CT

EPA/540/G-80/004 AND OSWER DIRECTIVE 9355.3-01 AND

SUBMITTED IN DRAFT AND FINAL VERSIONS. REMEDIAL

INVESTIGATION/FEASIBILITY STUDY WORK PLAN SHALL BE

PREPARED FOR PUBLIC REVIEW ON RECYCLED PAPER AND

PROVIDED ON CD ROM FORMAT ACCESSIBLE ON EXISTING

USASMDC HARDWARE AND SOFTWARE.

**LETTER OF TRANSMITTAL ONLY.

APPROVAL: G30/C30.

MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY

WEBSITE.

SUBMIT REPORT ON CD AND HARDCOPY.

15. TOTAL ---> 8

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

DD Form 1423-1, JUN 90 (COMPUTER GENERATED)

Page 10 of 14 Pages

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*00C

2. TITLE OF DATA ITEM

TECHNICAL REPORT-STUDY/SERVICES

3. SUBTITLE

ENVIRONMENTAL IMPACT

STATEMENT

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MISC-80508A

5. CONTRACT REFERENCE

4.2

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT AS REQ AS REQ b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

NA D

AS REQ Draft

Reg Repro

16. REMARKS -EN-E 10

SUBMIT IN ACCORDANCE WITH APPROVED SCHEDULE. REPORT **-CM-CT

SHALL FOLLOW FORMAT AR 200-2 AND AS MUTUALLY AGREED

UPON BY THE GOVERNMENT AND THE CONTRACTOR.

ENVIRONMENTAL IMPACT STATEMENTS PREPARED FOR PUBLIC

REVIEW SHALL BE PREPARED ON RECYCLED PAPER AND

PROVIDED IN CD ROM FORMAT ACCESSIBLE ON EXISTING

USASMDC HARDWARE AND SOFTWARE.

**LETTER OF TRANSMITTAL ONLY.

MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY

WEBSITE.

SUBMIT REPORT ON CD AND HARDCOPY.

15. TOTAL ---> 10

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

DD Form 1423-1, JUN 90 (COMPUTER GENERATED)

Page 11 of 14 Pages

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*00D

2. TITLE OF DATA ITEM

TECHNICAL REPORT-STUDY/SERVICES

3. SUBTITLE

TASK REPORT

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MISC-80508A

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT AS REQ SEE BLK 16 b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

NA D AS REQ

Draft

Reg Repro

16. REMARKS -EN-E 1

**-CM-CT

SUBMIT REPORT 30 DAYS AFTER END OF EACH TASK OR MAJOR -IM-PL 1

PORTION OF TASK. -DRC 1

-DTIC 1

CONTRACTOR FORMAT ACCEPTABLE.

**LETTER OF TRANSMITTAL ONLY.

SUBMIT EMAIL COPY ONLY

AS REQUIRED SUBMIT FINAL REPORT OF THE TASK ASSIGNMENT

TO DRC OR DTIC PER TECHNICAL MONITOR DIRECTION.

15. TOTAL ---> 4

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

DD Form 1423-1, JUN 90 (COMPUTER GENERATED)

Page 12 of 14 Pages

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*00E

2. TITLE OF DATA ITEM

TECHNICAL REPORT-STUDY/SERVICES

3. SUBTITLE

SAFETY AND HEALTH PROGRAM

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MISC-80508A

5. CONTRACT REFERENCE

4.1

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT AS REQ SEE BLK 16 b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

NA D SEE 16 AS REQ

Draft

Reg Repro

16. REMARKS -EN-E 1

**-CM-CT

SUBMIT WITHIN 14 DAYS OF COMPANY APPROVAL. THE

CONTRACTOR SHALL PREPARE AND DELIVER THE PROGRAMMATIC

AND TECHNICAL PLANS, REPORTS, AND OTHER DATA TO THE

GOVERNMENT IN ACCORDANCE WITH THE REQUIREMENTS SET

FORTH IN THE CDRL.

CONTRACTOR FORMAT ACCEPTABLE.

**LETTER OF TRANSMITTAL ONLY.

MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY

WEBSITE.

SUBMIT REPORT ON CD AND HARDCOPY.

15. TOTAL ---> 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Pages

DD Form 1423-1, JUN 90 (COMPUTER GENERATED)

Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ENVIRONMENTAL DOCUMENTATION

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

*00F

2. TITLE OF DATA ITEM

Technical Report-Study/Services

3. SUBTITLE

Operational Security (OPSEC) Plan

4. AUTHORITY

(DATA ACQUISITION DOC NO.)

DI-MISC-80898

5. CONTRACT REFERENCE

7.0

6. REQUIRING OFFICE

SMDC-EN-E

7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION

LT STATEMENT 1 TIME SEE 16 b. COPIES

8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final

A E AS REQ

Draft

Reg Repro

16. REMARKS -EN-E 1

**-CM-CT

THIS PLAN SHALL BE FURNISHED TO THE ENVIRONMENTAL OFFICE

NLT 10 DAYS AFTER CONTRACT AWARD.

APPROVAL G30/C30.

**LETTER OF TRANSMITTAL ONLY.

SUBMIT EMAIL COPY AND MAIL HARD COPY

15. TOTAL ---> 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Pages

DD Form 1423-1, JUN 90 (COMPUTER GENERATED)