DRAFT_EPCARTS_CDRLS-_Exhibit_A.pdf
PDF 137 KB Posted
- Solicitation number
- W9113M-17-R-0001
About this file
EPCARTS DRAFT CDRLS
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*001
2. TITLE OF DATA ITEM
STATUS REPORT
3. SUBTITLE
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MGMT-80368/M
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT MONTHLY SEE BLK 16 b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
N/A D SEE BLK 16 Draft
Reg Repro
16. REMARKS -EN-E 5
**-CM-CT
INITIAL REPORT IS TO COVER PERIOD TO END OF FIRST FULL
MONTH FOLLOWING CONTRACT AWARD. REPORT IS DUE 15 DAYS
AFTER COMPLETION OF EACH MONTH’S EFFORT. WHEN REPORT
IS PRESENTED ORALLY, PROVIDE COPIES OF VUGRAPHS AND
NARRATIVES TO ATTENDEES AT THE MEETING NTE 10 COPIES.
TAILOR DID AS FOLLOWS: DELETE 10.2.2.2.
SUBMIT EMAIL COPY AND MAIL HARD COPY
CONTRACTOR FORMAT ACCEPTABLE.
**LETTER OF TRANSMITTAL ONLY.
15. TOTAL ---> 5
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Page 1 of 15 Pages
DD Form 1423-1, JUN 90 (COMPUTER GENERATED) Previous editions are obsolete
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*002
2. TITLE OF DATA ITEM
PRESENTATION MATERIAL
3. SUBTITLE
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-ADMN-81373
5. CONTRACT REFERENCE
4.1, 4.2
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT ASREQ SEE BLK 16 b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
N/A D SEE BLK 16 Draft
Reg Repro
16. REMARKS -EN-E 10
PRESENT HARD COPIES, VUGRAPHS, AND NARRATIVES TO EACH **-CM-CT
MEETING ATTENDEE.
CONTRACTOR FORMAT ACCEPTABLE.
**LETTER OF TRANSMITTAL ONLY.
SUBMIT EMAIL COPY, MAIL HARD COPY AND CD.
15. TOTAL ---> 10
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Page 2 of 15 Pages
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*003
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-ADMN-81250A
5. CONTRACT REFERENCE
4.1, 4.2
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT ASREQ SEE BLK 16 b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
A D SEE BLK 16 Draft
Reg Repro
16. REMARKS -EN-E 5
SUBMIT 15 DAYS AFTER MEETING. THE CONTRACTOR SHALL **-CM-CT
PREPARE AND DELIVER THE PROGRAMMATIC AND TECHNICAL
PLANS, REPORTS, AND OTHER DATA TO THE GOVERNMENT IN
ACCORDANCE WITH THE REQUIREMENTS SET FORTH IN THE
CONTRACT DATA REQUIREMENTS LIST (CDRL).
CONTRACTOR FORMAT ACCEPTABLE.
APPROVAL: G30/C30.
**LETTER OF TRANSMITTAL ONLY.
SUBMIT EMAIL COPY ONLY
15. TOTAL ---> 5
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Page 3 of 15 Pages
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*004
2. TITLE OF DATA ITEM
FUNDS AND MAN-HOUR EXPENDITURE REPORT
3. SUBTITLE
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-FNCL-80331/M
5. CONTRACT REFERENCE
4.2
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT MONTHLY SEE BLK 16 b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
N/A D
SEE BLK 16 Draft Reg Repro
16. REMARKS -EN-E 2
**-CM-CT
FIRST REPORT DUE 15 DAYS AFTER FIRST FULL ACCOUNTING
PERIOD FOLLOWING ISSUANCE OF FIRST TASK ASSIGNMENT. -RD-C 1
SUBSEQUENT REPORTS DUE 15 DAYS AFTER CLOSE OF ACCTG
PERIOD. SUBMISSIONS SHALL INCLUDE THE FORMATTED FUNDS
AND MAN-HOUR EXPENDITURE SUMMARY (SEE FIG. 1 OF DID) AND
A COLUMNED REPORT REFLECTING THE TIME-PHASED
EXPENDITURES AND MANHOURS FORECAST BY MONTH THROUGH
THE PERIOD OF PERFORMANCE. THE TIME-PHASED EXPENDITURES
AND FORECAST WILL BE CUMULATIVE. A FORMATTED REPORT AND
COLUMNED REPORT WILL BE SUBMITTED FOR EACH TASK ORDER
AND FOR THE TOTAL CONTRACT.
CONTRACTOR FORMAT ACCEPTABLE.
ELECTRONIC SUBMISSION REQUIRED IN MICROSOFT OFFICE
COMPATIBLE SOFTWARE.
FOR EACH TASK ASSIGNMENT: MONTHLY GRAPHICS SHOWING
PLANNED, OBLIGATED, EXPENDED (ACTUALS & COMMITTED).
PROJECTIONS FOR NEXT MONTHS EXPENDITURES ACCOMPANYING
SPREADSHEET.
**LETTER OF TRANSMITTAL ONLY.
TAILOR DID AS FOLLOWS: DELETE PARA 10.1.b & c, 10.3.2, AND 10.3.3.
15. TOTAL ---> 3
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Page 4 of 15 Pages
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*005
2. TITLE OF DATA ITEM
PROGRAM PROGRESS REPORT
3. SUBTITLE
TASK ASSIGNMENT PLAN
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MGMT-80555
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT ASREQ SEE BLK 16 b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
NA SEE BLK 16
Draft
Reg Repro
16. REMARKS -EN-E 2
**-CM-CT
PLAN DUE 7 DAYS AFTER RECEIPT OF EACH TO. APPROVAL IAW -RD-C 1
PROCEDURES DEFINED IN SECTION H OF THE CONTRACT. THE
CONTRACTOR SHALL PREPARE AND DELIVER THE PROGRAMMATIC
AND TECHNICAL PLANS, REPORTS, AND OTHER DATA TO THE
GOVERNMENT IN ACCORDANCE WITH THE REQUIREMENTS SET
FORTH IN THE CONTRACT DATA REQUIREMENTS LIST (CDRL).
CONTRACTOR FORMAT ACCEPTABLE.
APPROVAL: G7/C7
COST SCHEDULE SPEND PLAN BROKEN OUT BY COST ELEMENTS
(E.G. LABOR, MATERIALS, TRAVEL, ETC)
PROVIDE BRIEF EXECUTIVE SUMMARY OF WORK TO BE PERFORMED.
ALSO PROVIDE TEAM STRUCTURE.
**LETTER OF TRANSMITTAL ONLY.
15. TOTAL ---> 3
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 (COMPUTER GENERATED)
Pages Previous editions are obsolete
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*007
2. TITLE OF DATA ITEM
TECHNICAL REPORT-STUDY/SERVICES
3. SUBTITLE
ENV-IMPACT ANALYSIS PROCESS
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MISC-80508A
5. CONTRACT REFERENCE
4.2
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT ANNLY AS REQ b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
A D ANNUALLY
Draft
Reg Repro
16. REMARKS -EN-E 10
**-CM-CT
THE CONTRACT SHALL PREPARE AND DELIVER THE
PROGRAMMATIC AND TECHNICAL PLANS, REPORTS, AND OTHER
DATA TO THE GOVERNMENT IN ACCORDANCE WITH THE
REQUIREMENTS SET FORTH IN THE CONTRACT DATA
REQUIREMENTS LIST (CDRL).
CONTRACTOR FORMAT ACCEPTABLE.
APPROVAL: G30/C30.
**LETTER OF TRANSMITTAL ONLY
MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY
WEBSITE.
SUBMIT REPORT ON CD AND HARDCOPY.
15. TOTAL ---> 10
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 (COMPUTER GENERATED)
Page 6 of 14 Pages
Previous editions are obsolete
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*008
2. TITLE OF DATA ITEM
TECHNICAL REPORT-STUDY/SERVICES
3. SUBTITLE
DESCRIPTION OF PROPOSED ACTION
AND ALTERNATIVE
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MISC-80508A
5. CONTRACT REFERENCE
4.2
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT AS REQ AS REQ b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
A D AS REQ Draft
Reg Repro
16. REMARKS -EN-E 10
**-CM-CT
EACH DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVE
(DOPAA) SHALL AT A MINIMUM INCLUDE THE FOLLOWING
HEADING: A) BACKGROUND/PURPOSE; B) NEED TO IMPLEMENT
THE PROPOSED ACTION/EVALUATION CRITERIA THAT WOULD
OCCUR AS A RESULT OF THE PROPOSED ACTION; C) ALTERNATIVE
EVALUATED.
CONTRACTOR FORMAT ACCEPTABLE.
**LETTER OF TRANSMITTAL ONLY.
APPROVAL: G30/C30.
MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY
WEBSITE.
SUBMIT REPORT ON CD AND HARDCOPY.
15. TOTAL ---> 10
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE 14 Pages
DD Form 1423-1, JUN 90 (COMPUTER GENERATED) of Previous editions are obsolete
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*009
2. TITLE OF DATA ITEM
TECHNICAL REPORT-STUDY/SERVICES
3. SUBTITLE
ENVIRONMENTAL ASSESSMENT (EA)
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MISC-80508A
5. CONTRACT REFERENCE
4.2
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
D Draft
Reg Repro
16. REMARKS -EN-E 10
**-CM-CT
THE HEADING SHALL FOLLOW APPENDIX B, AR 200-02. SUBMIT
EACH EA IAW APPROVED SCHEDULE. THE EAs PREPARED FOR PUBLIC
REVIEW SHALL BE PREPARED ON RECYCLED PAPER AND PROVIDED
IN CD ROM FORMAT ACCESSIBLE ON EXISTING USASMDC HARDWARE
AND SOFTWARE.
APPROVAL: G30/C30.
**LETTER OF TRANSMITTAL ONLY.
MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY
WEBSITE.
SUBMIT REPORT ON CD AND HARDCOPY.
15. TOTAL ---> 10
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE 14 Pages
DD Form 1423-1, JUN 90 (COMPUTER GENERATED)
Page 8 of
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*00A
2. TITLE OF DATA ITEM
TECHNICAL REPORT-STUDY/SERVICES
3. SUBTITLE
SPECIAL REPORTS OR LETTER
REPORTS
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MISC-80508A
5. CONTRACT REFERENCE
4.1, 4.2
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT AS REQ SEE BLK 16 b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final N/A
D SEE BLK 16
Draft
Reg Repro
16. REMARKS -EN-E 4
**-CM-CT
SUBMIT REPORTS WHEN THE NEED IS RECOGNIZED BY THE ***-SO 1
GOVERNMENT OR CONTRACTOR WITHIN 30 DAYS OF COMPLETION
OF REVIEW OR EVENT BEING REPORTED. THE CONTRACTOR
SHALL PREPARE AND DELIVER THE PROGRAMMATIC AND
TECHNICAL PLANS, REPORTS, AND OTHER DATA TO THE
GOVERNMENT IN ACCORDANCE WITH THE REQUIREMENTS SET
FORTH IN THE CDRL. CONTRACTOR FORMAT ACCEPTABLE.
**LETTER OF TRANSMITTAL ONLY.
SUBMIT REPORT ( EMAIL, CD OR PAPER) AS SPECIFIED BY TASK
ORDER.
SMDC-SO WILL RECEIVE A REPORT FOR PARA. 3.1.1 AND 3.1.7 ONLY.
15. TOTAL ---> 5
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 (COMPUTER GENERATED)
Page 9 of 14 Pages
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*00B
2. TITLE OF DATA ITEM
TECHNICAL REPORT-STUDY/SERVICES
3. SUBTITLE
REMEDIAL INVESTIGATION
FEASIBILITY STUDY WORK PLAN
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MISC-80508A
5. CONTRACT REFERENCE
3.1.2
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT AS REQ AS REQ b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
A D AS REQ
Draft
Reg Repro
16. REMARKS -EN-E 8 8
WORK PLAN REPORTS SHALL BE PREPARED IAW **-CM-CT
EPA/540/G-80/004 AND OSWER DIRECTIVE 9355.3-01 AND
SUBMITTED IN DRAFT AND FINAL VERSIONS. REMEDIAL
INVESTIGATION/FEASIBILITY STUDY WORK PLAN SHALL BE
PREPARED FOR PUBLIC REVIEW ON RECYCLED PAPER AND
PROVIDED ON CD ROM FORMAT ACCESSIBLE ON EXISTING
USASMDC HARDWARE AND SOFTWARE.
**LETTER OF TRANSMITTAL ONLY.
APPROVAL: G30/C30.
MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY
WEBSITE.
SUBMIT REPORT ON CD AND HARDCOPY.
15. TOTAL ---> 8
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 (COMPUTER GENERATED)
Page 10 of 14 Pages
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*00C
2. TITLE OF DATA ITEM
TECHNICAL REPORT-STUDY/SERVICES
3. SUBTITLE
ENVIRONMENTAL IMPACT
STATEMENT
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MISC-80508A
5. CONTRACT REFERENCE
4.2
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT AS REQ AS REQ b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
NA D
AS REQ Draft
Reg Repro
16. REMARKS -EN-E 10
SUBMIT IN ACCORDANCE WITH APPROVED SCHEDULE. REPORT **-CM-CT
SHALL FOLLOW FORMAT AR 200-2 AND AS MUTUALLY AGREED
UPON BY THE GOVERNMENT AND THE CONTRACTOR.
ENVIRONMENTAL IMPACT STATEMENTS PREPARED FOR PUBLIC
REVIEW SHALL BE PREPARED ON RECYCLED PAPER AND
PROVIDED IN CD ROM FORMAT ACCESSIBLE ON EXISTING
USASMDC HARDWARE AND SOFTWARE.
**LETTER OF TRANSMITTAL ONLY.
MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY
WEBSITE.
SUBMIT REPORT ON CD AND HARDCOPY.
15. TOTAL ---> 10
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 (COMPUTER GENERATED)
Page 11 of 14 Pages
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*00D
2. TITLE OF DATA ITEM
TECHNICAL REPORT-STUDY/SERVICES
3. SUBTITLE
TASK REPORT
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MISC-80508A
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT AS REQ SEE BLK 16 b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
NA D AS REQ
Draft
Reg Repro
16. REMARKS -EN-E 1
**-CM-CT
SUBMIT REPORT 30 DAYS AFTER END OF EACH TASK OR MAJOR -IM-PL 1
PORTION OF TASK. -DRC 1
-DTIC 1
CONTRACTOR FORMAT ACCEPTABLE.
**LETTER OF TRANSMITTAL ONLY.
SUBMIT EMAIL COPY ONLY
AS REQUIRED SUBMIT FINAL REPORT OF THE TASK ASSIGNMENT
TO DRC OR DTIC PER TECHNICAL MONITOR DIRECTION.
15. TOTAL ---> 4
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 (COMPUTER GENERATED)
Page 12 of 14 Pages
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*00E
2. TITLE OF DATA ITEM
TECHNICAL REPORT-STUDY/SERVICES
3. SUBTITLE
SAFETY AND HEALTH PROGRAM
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MISC-80508A
5. CONTRACT REFERENCE
4.1
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT AS REQ SEE BLK 16 b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
NA D SEE 16 AS REQ
Draft
Reg Repro
16. REMARKS -EN-E 1
**-CM-CT
SUBMIT WITHIN 14 DAYS OF COMPANY APPROVAL. THE
CONTRACTOR SHALL PREPARE AND DELIVER THE PROGRAMMATIC
AND TECHNICAL PLANS, REPORTS, AND OTHER DATA TO THE
GOVERNMENT IN ACCORDANCE WITH THE REQUIREMENTS SET
FORTH IN THE CDRL.
CONTRACTOR FORMAT ACCEPTABLE.
**LETTER OF TRANSMITTAL ONLY.
MAY REQUEST WEB POSTING ON GOVERNMENT OR COMPANY
WEBSITE.
SUBMIT REPORT ON CD AND HARDCOPY.
15. TOTAL ---> 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Pages
DD Form 1423-1, JUN 90 (COMPUTER GENERATED)
Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington, Headquarters Services Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
ENVIRONMENTAL DOCUMENTATION
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
*00F
2. TITLE OF DATA ITEM
Technical Report-Study/Services
3. SUBTITLE
Operational Security (OPSEC) Plan
4. AUTHORITY
(DATA ACQUISITION DOC NO.)
DI-MISC-80898
5. CONTRACT REFERENCE
7.0
6. REQUIRING OFFICE
SMDC-EN-E
7. DD 250 REQ 9. DIST 10. FREQ 12. DATE OF FIRST SUB 14. DISTRIBUTION
LT STATEMENT 1 TIME SEE 16 b. COPIES
8. APP CODE REQUIRED 11. AOD 13. DATE OF SUBSEQ SUB a. ADDRESSEE Final
A E AS REQ
Draft
Reg Repro
16. REMARKS -EN-E 1
**-CM-CT
THIS PLAN SHALL BE FURNISHED TO THE ENVIRONMENTAL OFFICE
NLT 10 DAYS AFTER CONTRACT AWARD.
APPROVAL G30/C30.
**LETTER OF TRANSMITTAL ONLY.
SUBMIT EMAIL COPY AND MAIL HARD COPY
15. TOTAL ---> 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE Pages
DD Form 1423-1, JUN 90 (COMPUTER GENERATED)
File details come from the government source that posted it. Updated .