Tab A (KTR Site)
| To be completed by the Prime Offeror |
| COMPOSITE IDIQ RATE DEVELOPMENT - Contractor Site |
| Development of Contract Rates Weighted For Prime Offeror and Subcontractor Participation Mix |
| This form is utilized to develop blended Contractor Site Labor rates if the offerors teaming arrangement consists of multiple companies (e.g. prime and subcontractors labor) to perform the duties of a labor category. Indicate the percentage of participation proposed for each labor rate. If the offeror proposes to have one company work 100% for a particular labor category then indicate 100% in the form. The Prime should fill out this form using fully burdened Contractor Site IDIQ rates from each company (proposed in sections 11 & 12 of the cost volume of the solicitation). The formulas in colored cells will automatically calculate the blended rate. This form will automatically fill the "Summary of Proposed Composite IDIQ Rates by Contract Year - Contractor Site" form in Tab B of this worksheet |
| Labor Mix | EPCARTS Labor Category Position Descriptions (LCPDs) | Usage | Base Yr 1 | Base Yr 2 | Base Yr 3 | Option 1 | Option 2 | 6-Month Ext. | |
| Prime | 50% | $10.00 | $11.00 | $11.30 | $11.60 | $11.60 | $11.92 | ||
| Major Subcontractor ABC | 10% | $8.00 | $9.00 | $9.24 | $9.49 | $9.49 | $9.75 | NOTE: This section is just a sample. Please populate all the white cells starting in cell A14, and the totals will automatically populate in the colored cells. | |
| Major Subcontractor XYZ | 20% | $9.50 | $10.00 | $10.27 | $10.55 | $10.55 | $10.83 | ||
| Minor Sub PDQ | 20% | $9.00 | $9.75 | $10.01 | $10.28 | $10.28 | $10.56 | ||
| Labor Category | 100% | $9.50 | $10.35 | $10.63 | $10.92 | $10.92 | $11.21 | ||
| 25% | |||||||||
| 25% | |||||||||
| 25% | |||||||||
| 25% | |||||||||
| Program Manager | 100% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Task Order Manager | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Engineer/Scientist I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Engineer/Scientist II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Engineer/Scientist III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Engineer/Scientist IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Analyst I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Analyst II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Analyst III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Analyst IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Programmer/Systems Analyst I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Programmer/Systems Analyst II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Programmer/Systems Analyst III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Programmer/Systems Analyst IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Principal Investigator I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Principal Investigator II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Principal Investigator III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Management/Technical Staff I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Management/Technical Staff II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Management/Technical Staff III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Management/Techncial Staff IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Technician I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Technician II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Technician III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Technician IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Illustrator/Graphics/Tech Writer I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Illustrator/Graphics/Tech Writer II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Illustrator/Graphics/Tech Writer III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Illustrator/Graphics/Tech Writer IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Subject Matter Expert I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Subject Matter Expert II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Subject Matter Expert III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Notes: |
| Areas within the table that are white require Offeror input. Color areas contain formulas that may be adjusted by the Offeror as necessary, but the end result is that the spreadsheet must be self-calculating in the same areas as was provided by the Government. |
Tab B (KTR Site)
Summary of Proposed Composite IDIQ Rates by Contract Year - Contractor Site
EPCARTS Standard Labor Category (SLC) Base Yr 1 Base Yr 2 Base Yr 3 Option 1 Option 2 6-Month Ext.
| Program Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Task Order Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Scientist I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Scientist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Scientist III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Scientist IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Analyst I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Analyst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Analyst III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Analyst IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Programmer/Systems Analyst I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Programmer/Systems Analyst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Programmer/Systems Analyst III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Programmer/Systems Analyst IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Principal Investigator I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Principal Investigator II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Principal Investigator III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Management/Technical Staff I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Management/Technical Staff II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Management/Technical Staff III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Management/Technical Staff IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Illustrator/Graphics/Tech Writer I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Illustrator/Graphics/Tech Writer II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Illustrator/Graphics/Tech Writer III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Illustrator/Graphics/Tech Writer IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Tab C (GOVT Site)
| To be completed by the Prime Offeror |
| COMPOSITE IDIQ RATE DEVELOPMENT - Government Site |
| Development of Contract Rates Weighted For Prime Offeror and Subcontractor Participation Mix |
| This form is utilized to develop blended Government Site Labor rates if the offerors teaming arrangement consists of multiple companies (e.g. prime and subcontractors labor) to perform the duties of a labor category. Indicate the percentage of participation proposed for each labor rate. If the offeror proposes to have one company work 100% for a particular labor category then indicate 100% in the form. The Prime should fill out this form using fully burdened Government Site IDIQ rates from each company (proposed in sections 11 & 12 of the cost volume of the solicitation). The formulas in colored cells will automatically calculate the blended rate. This form will automatically fill the "Summary of Proposed Composite IDIQ Rates by Contract Year - Government Site" form in Tab D of this worksheet |
| Labor Mix | EPCARTS Labor Category Position Descriptions (LCPDs) | Usage | Base Yr 1 | Base Yr 2 | Base Yr 3 | Option 1 | Option 2 | 6-Month Ext. | |
| Prime | 50% | $10.00 | $11.00 | $11.30 | $11.60 | $11.60 | $11.92 | ||
| Major Subcontractor ABC | 10% | $8.00 | $9.00 | $9.24 | $9.49 | $9.49 | $9.75 | NOTE: This section is just a sample. Please populate all the white cells starting in cell A14, and the totals will automatically populate in the colored cells. | |
| Major Subcontractor XYZ | 20% | $9.50 | $10.00 | $10.27 | $10.55 | $10.55 | $10.83 | ||
| Minor Sub PDQ | 20% | $9.00 | $9.75 | $10.01 | $10.28 | $10.28 | $10.56 | ||
| Labor Category | 100% | $9.50 | $10.35 | $10.63 | $10.92 | $10.92 | $11.21 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Program Manager | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Task Order Manager | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Engineer/Scientist I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Engineer/Scientist II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Engineer/Scientist III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Engineer/Scientist IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Analyst I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Analyst II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Analyst III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Analyst IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Programmer/Systems Analyst I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Programmer/Systems Analyst II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Programmer/Systems Analyst III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Programmer/Systems Analyst IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Principal Investigator I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Principal Investigator II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Principal Investigator III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Management/Technical Staff I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Management/Technical Staff II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Management/Technical Staff III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Sr. Management/Techncial Staff IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Technician I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Technician II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Technician III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Technician IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Illustrator/Graphics/Tech Writer I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Illustrator/Graphics/Tech Writer II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Illustrator/Graphics/Tech Writer III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Illustrator/Graphics/Tech Writer IV | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Subject Matter Expert I | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Subject Matter Expert II | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| Subject Matter Expert III | 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | |||||||||
| 0% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Notes: |
| Areas within the table that are white require Offeror input. Color areas contain formulas that may be adjusted by the Offeror as necessary, but the end result is that the spreadsheet must be self-calculating in the same areas as was provided by the Government. |
Tab D (GOVT Site)
Summary of Proposed Composite IDIQ Rates by Contract Year - Government Site
EPCARTS Standard Labor Category (SLC) Base Yr 1 Base Yr 2 Base Yr 3 Option 1 Option 2 6-Month Ext.
| Program Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Task Order Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Scientist I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Scientist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Scientist III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Scientist IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Analyst I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Analyst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Analyst III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Analyst IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Programmer/Systems Analyst I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Programmer/Systems Analyst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Programmer/Systems Analyst III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Programmer/Systems Analyst IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Principal Investigator I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Principal Investigator II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Principal Investigator III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Management/Technical Staff I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Management/Technical Staff II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Management/Technical Staff III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Management/Technical Staff IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Illustrator/Graphics/Tech Writer I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Illustrator/Graphics/Tech Writer II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Illustrator/Graphics/Tech Writer III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Illustrator/Graphics/Tech Writer IV | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
File details come from the government source that posted it. Updated .