320257_INSTALLATION TENT_CP-HOVEY_DWG_ARCH_A-01_AMD.pdf

PDF 9 MB Posted

Attached to
Installation Tent DFAC (Tension Fabric Structure), Camp Hovey
Solicitation number
W90VN824R0072
Issued by

About this file

This document is a solicitation for an Installation Tent Dining Facility (DFAC) using a Tension Fabric Structure (TFS) at Camp Hovey. The solicitation is issued to existing Area I & II General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) contractors under Contract Number W91QVN-24-D-0059 through W91QVN-24-D-0106. The scope of work includes providing and installing a 55m x 20m TFS tent with an insulated interior layer, a new movable toilet facility, and related electrical, mechanical, and flooring work. A site orientation is scheduled for September 6, 2024. The contractor shall provide shop drawings for the TFS tent and a 3-year warranty for maintenance. The solicitation is issued by the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A-1

ARCHITECTURAL

GENRAL NOTES AND SCOPE OF WORK

1.

8.

2.

3.

4.

5.

6.

7.

9.

10.

11.

12.

13.

14.

15.

WALL : 2.29 SM. DEG K/W

ROOF : 5.30 SM. DEG K/W

R-VALUE :

GENERAL NOTES

16.

17.

1.1

1.2

1.3

1.4

SCOPE OF WORK (ARCHITECTURAL WORK)

NEW CONSTRUCTION (L) WORK

2.1

2.2

2. MOVABLE TOILET

CONNECT MECHANICAL AND ELECTRICAL UTILITY LINE TO NEW TOILET.

PLAN AND SCHEDULE.

INSTALL DOORS AND FRAMES INCLUDING HARDWARE SETS AS SHOWN ON FLOOR

INSTALL PARTITIONS AS SHOWN ON FLOOR PLAN AND SCHEDULE.

APPLY EPOXY COATING WITH NON SLIP GRITS ON EXISTING CONCRETE FLOOR.

TEMPORARY SPACES.

FURNITURE(TABLES & CHAIRS) AND EQUIPMENT WILL BE MOVED TO TENT OR 1.5

PROVIDE DISCONNECTION AND CONNECTION OF EQUIPMENTS.1.6

1.

TO PRODUCTS OF THE MANUFACTURES INDICATED.

IDENTIFICATION PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING

THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER.

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT.

OR RENOVATION.

CONDITION AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING

OF THE STRUCTURE.

TO DEMOLITION OF THE LOAD BEARING WALLS TO PREVENT COLLAPSE

APPROPRIATE TEMPORARY SUPPORTS SHALL BE CONSTRUCTED PRIOR

THE DAMAGES TO MATCH UP TO ADJACENT AREAS AT HIS OWN EXPENSE.

EXISTING AREAS CAUSED BY THIS PROJECT AND SHALL REPAIR

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO

FIELD CONDITION AND SUBMITED TO COR FOR APPROVAL.

PREPARED AT THE SITE BY THE CONTRACTOR ACCORDING TO ACTUAL

WITH THE FIELD CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE

SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE

DRAWINGS TO COR FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP

INSTALLATION.

DETAILS AND GET APPROVAL FROM COR BEFORE FABRICATION AND

CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR/WINDOW

ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM.

REPLACEMENT OF MECHANICAL (PLUMBING, HEATING, EQUIPMENT, ETC),

AND CEILING WHERE REQUIRED FOR THE INSTALLATION AND/OR

OF ANY OBSTRUCTED ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS

THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL/REINSTALLATION

OF THIS PROJECT.

OCTOBER 1, 2003 SHALL BE AS A PART OF THE CONTRACT DOCUMENT

STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED

NO. 595b, COLORS.

AND COLOR NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD

COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY

OR STORAGE OFFICE, DPW. PER DIRECTION FROM COR.

SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY

PRIOR TO COMMENCEMENT OF FLOOR TILE WORK.

ALL CONCRETE FLOOR SURFACES SHALL BE LEVELED AND SMOOTHED

3.1.14, OMA STD SPECIFICATION 15181.

AND OTHER ITEMS REQUIRING MAINTENANCE/OPERATION IAW THE SECTION

PROVIDE ACCESS DOORS FOR ALL CONCEALED VALVES, VENTS, CONTROLS

SHOWING THE PRODUCT IS LEAD FREE.

DATA SHEET (MSDS), WRITTEN IN ENGLISH, FROM THE MANUFACTURE

THE CONTRACTOR SHALL PROVIDE A CERTIFICATE OR MATERIAL SAFETY

THE NON-VOLATILE SOLIDS) DURING THE EXECUTION OF THIS PROJECT.

OR COATINGS WITH LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF

THE CONTRACTOR SHALL USE "LEAD FREE" COATINGS (LIQUID PAINTS

DOCUMENTATION TO 8 CES/CEAN.

PROVIDE THE NEW SURVEY REPORT AND ASBESTOS REMOVAL

ENVIRONMENTAL GOVERNING STANDARD (KEGS). THE CONTRACTOR SHALL

APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH THE KOREA

MATERIALS SHALL BE REMOVED PRIOR TO ANY WORK TO ASSURE THAT

OFFICER. THE WORK AREA SHALL BE RESURVEYED AND ASBESTOS

SHALL CEASE WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING

ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR

PRESENT IN THE AREAS AFFECTED BY THIS WORK: IF SUSPECTED

ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS IS NOT

IN ENGLISH, FROM THE MANUFACTURER VERIFYING THE PRODUCT IS

THE CONTRACTOR SHALL PROVIDE A CERTIFICATE OR MSDS, WRITTEN

0.1 PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT.

THE CONTRACTOR SHALL USE "ASBESTOS FREE" MATERIALS (LESS THAN

TFS TENT SAMPLE PICTURES

TFS TENT ELEVATION SAMPLE

INSTALLATION TENT

CAMP HOVEYKIM, YK

320257

(TFS TENT NEED A 3-YEAR WARRANTY FOR MAINTENANCE)

EXISTING CONCRETE FOUNDATION. AND REMOVE TENT AFTER COMPLETION.

PROVIDE A TFS(TENSION FABRIC STRUCTURE) TENT(55M x 20M) AND INSTALL ON

AS SHOWN ON DWG. AND REMOVE MOVABLE TOILET AFTER COMPLETION.

PROVIDE NEW MOVABLE TOILET FACILITY INCLUDING ALL TOILET ACCESSORIES

NOTES

1. TENT DFAC

SKIRT DETAILS FOR APPROVAL BY COR.

CONTRACTOR SHALL PROVIDE SHOP DRAWINGS OF TFS TENT INCLUDING TENT END 2.

TFS TENT NEED INSIDE TENT LAYER FOR INSULATING AND PROTECTING CONDENSATION.

KYKR 1 06SEP24

R 1

REVISED SCOPE OF WORK

WORK

REMOVAL

DELETE

File details come from the government source that posted it. Updated .