320257_INSTALLATION TENT_CP-HOVEY_DWG_ARCH_A-01_AMD.pdf
PDF 9 MB Posted
- Solicitation number
- W90VN824R0072
About this file
This document is a solicitation for an Installation Tent Dining Facility (DFAC) using a Tension Fabric Structure (TFS) at Camp Hovey. The solicitation is issued to existing Area I & II General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) contractors under Contract Number W91QVN-24-D-0059 through W91QVN-24-D-0106. The scope of work includes providing and installing a 55m x 20m TFS tent with an insulated interior layer, a new movable toilet facility, and related electrical, mechanical, and flooring work. A site orientation is scheduled for September 6, 2024. The contractor shall provide shop drawings for the TFS tent and a 3-year warranty for maintenance. The solicitation is issued by the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A-1
ARCHITECTURAL
GENRAL NOTES AND SCOPE OF WORK
1.
8.
2.
3.
4.
5.
6.
7.
9.
10.
11.
12.
13.
14.
15.
WALL : 2.29 SM. DEG K/W
ROOF : 5.30 SM. DEG K/W
R-VALUE :
GENERAL NOTES
16.
17.
1.1
1.2
1.3
1.4
SCOPE OF WORK (ARCHITECTURAL WORK)
NEW CONSTRUCTION (L) WORK
2.1
2.2
2. MOVABLE TOILET
CONNECT MECHANICAL AND ELECTRICAL UTILITY LINE TO NEW TOILET.
PLAN AND SCHEDULE.
INSTALL DOORS AND FRAMES INCLUDING HARDWARE SETS AS SHOWN ON FLOOR
INSTALL PARTITIONS AS SHOWN ON FLOOR PLAN AND SCHEDULE.
APPLY EPOXY COATING WITH NON SLIP GRITS ON EXISTING CONCRETE FLOOR.
TEMPORARY SPACES.
FURNITURE(TABLES & CHAIRS) AND EQUIPMENT WILL BE MOVED TO TENT OR 1.5
PROVIDE DISCONNECTION AND CONNECTION OF EQUIPMENTS.1.6
1.
TO PRODUCTS OF THE MANUFACTURES INDICATED.
IDENTIFICATION PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING
THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER.
IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT.
OR RENOVATION.
CONDITION AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING
OF THE STRUCTURE.
TO DEMOLITION OF THE LOAD BEARING WALLS TO PREVENT COLLAPSE
APPROPRIATE TEMPORARY SUPPORTS SHALL BE CONSTRUCTED PRIOR
THE DAMAGES TO MATCH UP TO ADJACENT AREAS AT HIS OWN EXPENSE.
EXISTING AREAS CAUSED BY THIS PROJECT AND SHALL REPAIR
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO
FIELD CONDITION AND SUBMITED TO COR FOR APPROVAL.
PREPARED AT THE SITE BY THE CONTRACTOR ACCORDING TO ACTUAL
WITH THE FIELD CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE
SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE
DRAWINGS TO COR FOR APPROVAL.
CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP
INSTALLATION.
DETAILS AND GET APPROVAL FROM COR BEFORE FABRICATION AND
CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR/WINDOW
ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM.
REPLACEMENT OF MECHANICAL (PLUMBING, HEATING, EQUIPMENT, ETC),
AND CEILING WHERE REQUIRED FOR THE INSTALLATION AND/OR
OF ANY OBSTRUCTED ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL/REINSTALLATION
OF THIS PROJECT.
OCTOBER 1, 2003 SHALL BE AS A PART OF THE CONTRACT DOCUMENT
STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED
NO. 595b, COLORS.
AND COLOR NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD
COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY
OR STORAGE OFFICE, DPW. PER DIRECTION FROM COR.
SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY
PRIOR TO COMMENCEMENT OF FLOOR TILE WORK.
ALL CONCRETE FLOOR SURFACES SHALL BE LEVELED AND SMOOTHED
3.1.14, OMA STD SPECIFICATION 15181.
AND OTHER ITEMS REQUIRING MAINTENANCE/OPERATION IAW THE SECTION
PROVIDE ACCESS DOORS FOR ALL CONCEALED VALVES, VENTS, CONTROLS
SHOWING THE PRODUCT IS LEAD FREE.
DATA SHEET (MSDS), WRITTEN IN ENGLISH, FROM THE MANUFACTURE
THE CONTRACTOR SHALL PROVIDE A CERTIFICATE OR MATERIAL SAFETY
THE NON-VOLATILE SOLIDS) DURING THE EXECUTION OF THIS PROJECT.
OR COATINGS WITH LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF
THE CONTRACTOR SHALL USE "LEAD FREE" COATINGS (LIQUID PAINTS
DOCUMENTATION TO 8 CES/CEAN.
PROVIDE THE NEW SURVEY REPORT AND ASBESTOS REMOVAL
ENVIRONMENTAL GOVERNING STANDARD (KEGS). THE CONTRACTOR SHALL
APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH THE KOREA
MATERIALS SHALL BE REMOVED PRIOR TO ANY WORK TO ASSURE THAT
OFFICER. THE WORK AREA SHALL BE RESURVEYED AND ASBESTOS
SHALL CEASE WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING
ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR
PRESENT IN THE AREAS AFFECTED BY THIS WORK: IF SUSPECTED
ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS IS NOT
IN ENGLISH, FROM THE MANUFACTURER VERIFYING THE PRODUCT IS
THE CONTRACTOR SHALL PROVIDE A CERTIFICATE OR MSDS, WRITTEN
0.1 PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT.
THE CONTRACTOR SHALL USE "ASBESTOS FREE" MATERIALS (LESS THAN
TFS TENT SAMPLE PICTURES
TFS TENT ELEVATION SAMPLE
INSTALLATION TENT
CAMP HOVEYKIM, YK
320257
(TFS TENT NEED A 3-YEAR WARRANTY FOR MAINTENANCE)
EXISTING CONCRETE FOUNDATION. AND REMOVE TENT AFTER COMPLETION.
PROVIDE A TFS(TENSION FABRIC STRUCTURE) TENT(55M x 20M) AND INSTALL ON
AS SHOWN ON DWG. AND REMOVE MOVABLE TOILET AFTER COMPLETION.
PROVIDE NEW MOVABLE TOILET FACILITY INCLUDING ALL TOILET ACCESSORIES
NOTES
1. TENT DFAC
SKIRT DETAILS FOR APPROVAL BY COR.
CONTRACTOR SHALL PROVIDE SHOP DRAWINGS OF TFS TENT INCLUDING TENT END 2.
TFS TENT NEED INSIDE TENT LAYER FOR INSULATING AND PROTECTING CONDENSATION.
KYKR 1 06SEP24
R 1
REVISED SCOPE OF WORK
WORK
REMOVAL
DELETE
File details come from the government source that posted it. Updated .