320257_DWG_ARCH_INSTALLATION TENT_CP-HOVEY.pdf
PDF 3 MB Posted
- Solicitation number
- W90VN824R0072
About this file
This document appears to be an architectural drawing and related information for a federal contract opportunity to provide and install a tension fabric structure (TFS) DFAC (Dining Facility) at Camp Hovey.
The key details are:
- The scope of work includes providing and installing a 55m x 20m TFS tent on an existing concrete foundation, along with a movable toilet facility and associated mechanical/electrical connections.
- The drawing provides specifications for the tent construction, partitions, doors, and other architectural elements.
- The related federal contract opportunity is Solicitation Number W90VN824R0072, for existing MAIDIQ contractors under Contract Numbers W91QVN-24-D-0059 through 0078, 0084, 0085, 0098, 0102, and 0106.
- The contract is for the U.S. Army Materiel Command's Army Contracting Command.
- A site orientation is scheduled for September 6, 2024 at 13:30 at the DFAC Camp Hovey Building S-4158.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A-1
ARCHITECTURAL
GENRAL NOTES AND SCOPE OF WORK
1.
8.
2.
3.
4.
5.
6.
7.
9.
10.
11.
12.
13.
14.
15.
WALL : 2.29 SM. DEG K/W
ROOF : 5.30 SM. DEG K/W
R-VALUE :
GENERAL NOTES
16.
17.
1.1
1.2
1.3
1.4
SCOPE OF WORK (ARCHITECTURAL WORK)
NEW CONSTRUCTION (L) WORK
2.1
2.2
2. MOVABLE TOILET
CONNECT MECHANICAL AND ELECTRICAL UTILITY LINE TO NEW TOILET.
PLAN AND SCHEDULE.
INSTALL DOORS AND FRAMES INCLUDING HARDWARE SETS AS SHOWN ON FLOOR
INSTALL PARTITIONS AS SHOWN ON FLOOR PLAN AND SCHEDULE.
APPLY EPOXY COATING WITH NON SLIP GRITS ON EXISTING CONCRETE FLOOR.
TEMPORARY SPACES.
FURNITURE(TABLES & CHAIRS) AND EQUIPMENT WILL BE MOVED TO TENT OR 1.5
PROVIDE DISCONNECTION AND CONNECTION OF EQUIPMENTS.1.6
1.
TO PRODUCTS OF THE MANUFACTURES INDICATED.
IDENTIFICATION PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING
THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER.
IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT.
OR RENOVATION.
CONDITION AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING
OF THE STRUCTURE.
TO DEMOLITION OF THE LOAD BEARING WALLS TO PREVENT COLLAPSE
APPROPRIATE TEMPORARY SUPPORTS SHALL BE CONSTRUCTED PRIOR
THE DAMAGES TO MATCH UP TO ADJACENT AREAS AT HIS OWN EXPENSE.
EXISTING AREAS CAUSED BY THIS PROJECT AND SHALL REPAIR
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO
FIELD CONDITION AND SUBMITED TO COR FOR APPROVAL.
PREPARED AT THE SITE BY THE CONTRACTOR ACCORDING TO ACTUAL
WITH THE FIELD CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE
SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE
DRAWINGS TO COR FOR APPROVAL.
CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP
INSTALLATION.
DETAILS AND GET APPROVAL FROM COR BEFORE FABRICATION AND
CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR/WINDOW
ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM.
REPLACEMENT OF MECHANICAL (PLUMBING, HEATING, EQUIPMENT, ETC),
AND CEILING WHERE REQUIRED FOR THE INSTALLATION AND/OR
OF ANY OBSTRUCTED ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL/REINSTALLATION
OF THIS PROJECT.
OCTOBER 1, 2003 SHALL BE AS A PART OF THE CONTRACT DOCUMENT
STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED
NO. 595b, COLORS.
AND COLOR NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD
COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY
OR STORAGE OFFICE, DPW. PER DIRECTION FROM COR.
SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY
PRIOR TO COMMENCEMENT OF FLOOR TILE WORK.
ALL CONCRETE FLOOR SURFACES SHALL BE LEVELED AND SMOOTHED
3.1.14, OMA STD SPECIFICATION 15181.
AND OTHER ITEMS REQUIRING MAINTENANCE/OPERATION IAW THE SECTION
PROVIDE ACCESS DOORS FOR ALL CONCEALED VALVES, VENTS, CONTROLS
SHOWING THE PRODUCT IS LEAD FREE.
DATA SHEET (MSDS), WRITTEN IN ENGLISH, FROM THE MANUFACTURE
THE CONTRACTOR SHALL PROVIDE A CERTIFICATE OR MATERIAL SAFETY
THE NON-VOLATILE SOLIDS) DURING THE EXECUTION OF THIS PROJECT.
OR COATINGS WITH LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF
THE CONTRACTOR SHALL USE "LEAD FREE" COATINGS (LIQUID PAINTS
DOCUMENTATION TO 8 CES/CEAN.
PROVIDE THE NEW SURVEY REPORT AND ASBESTOS REMOVAL
ENVIRONMENTAL GOVERNING STANDARD (KEGS). THE CONTRACTOR SHALL
APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH THE KOREA
MATERIALS SHALL BE REMOVED PRIOR TO ANY WORK TO ASSURE THAT
OFFICER. THE WORK AREA SHALL BE RESURVEYED AND ASBESTOS
SHALL CEASE WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING
ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR
PRESENT IN THE AREAS AFFECTED BY THIS WORK: IF SUSPECTED
ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS IS NOT
IN ENGLISH, FROM THE MANUFACTURER VERIFYING THE PRODUCT IS
THE CONTRACTOR SHALL PROVIDE A CERTIFICATE OR MSDS, WRITTEN
0.1 PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT.
THE CONTRACTOR SHALL USE "ASBESTOS FREE" MATERIALS (LESS THAN
TFS TENT SAMPLE PICTURES
TFS TENT ELEVATION SAMPLE
INSTALLATION TENT
CAMP HOVEYKIM, YK
320257
(TFS TENT NEED A 3-YEAR WARRANTY FOR MAINTENANCE)
EXISTING CONCRETE FOUNDATION. AND REMOVE TENT AFTER COMPLETION.
PROVIDE A TFS(TENSION FABRIC STRUCTURE) TENT(55M x 20M) AND INSTALL ON
AS SHOWN ON DWG. AND REMOVE MOVABLE TOILET AFTER COMPLETION.
PROVIDE NEW MOVABLE TOILET FACILITY INCLUDING ALL TOILET ACCESSORIES
NOTES
1. TENT DFAC
SKIRT DETAILS FOR APPROVAL BY COR.
CONTRACTOR SHALL PROVIDE SHOP DRAWINGS OF TFS TENT INCLUDING TENT END 2.
TFS TENT NEED INSIDE TENT LAYER FOR INSULATING AND PROTECTING CONDENSATION.
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SCALE:
1/100
FLOT DFAC TENT LAYOUT PLAN
A-2
ARCHITECTURAL
FLOT DFAC TENT LAYOUT PLAN
KITCHEN AREA FOOD SERVING AREA
QUEUING AREA
DINING AREA (300 SEATS)
AREA
ENTRANCE
EXIT AREA
DISH WASHING AREA
LEGEND
FULL PARTITION (VARIOUS HEIGHT)
HIGH PARTITION (H: 2,000)
LOW PARTITION (H: 800)
CASHIER COUNTER
FULL PARTITION
LOW PARTITION
(H: 800)
FULL PARTITION
LOW PARTITION
(H: 800)
HIGH PARTITION
(H: 2,000)
INSTALLATION TENT
CAMP HOVEYKIM, YK
320257
1600 7400
D4
D3
D1
D1
D1
D1
D1
D1
D2 D2
D2 D2
(H:3000+VARIOUS)
(H:3000+VARIOUS)
FEC
FEC
FEC
FEC PROVIDE NEW FIRE EXTINGUISHERS CABINETS(FEC)
A3
1D
A3
1C
A3
1B
A3
1A
S'STL COUNTER TOP
W/THK1.4 x 600(D)
3,900 x 600 x 1,000(H)
RETURN TABLE OPENING
WALL
WALL SUPPORT
WALL
WALL SUPPORT
A3
1C
INSTALLATION TENT
CAMP HOVEYKIM, YK
320257
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A-3
ARCHITECTURAL
WALL SECTIONS AND DOOR DESCRIPTIONS
STRIPPING
SAFETY RUBBER
2 - SAFETY RUBBER STRIPPING FOR GLASS DOOR
2 - DOOR HANDLE
2 - DUST PROOF STRIKE, L04011
4 - DOOR STOP, L02161
2 - DEAD LOCK (TOP & BOTTOM)
2 - FLUSH BOLT (TOP & BOTTOM)
1 - THRESHOLD, J32180
2 - THRESHOLD FOR FLOOR CLOSER, C08011
2 - TOP PIVOT HINGE, C07021
2 - FLOOR CONECEALED CLOSER, C06012
HDW - ENTRANCE GLASS DOOR
ENTRANCE GLASS DOOR
DOUBLE DOOR
TEMPERED GLASS
THK.12mm
D1 EXIT DOOR (EXTERIOR)D2 D3 D4
FRAMES
STEEL
STAINLESS
SINGLE DOOR WITH STEEL DOOR FRAME
* STEEL FLUSH, INSULATED
1 - WEATHER STRIPPING
1 - THRESH HOLD, J12190
1 - DOOR HOLDER, L01381
1 - KICK PLATE, J102
1 - DOOR CLOSER, C02021
(TYPE"1" AND FUNCTION "8")
1 - EXIT DEVICE (PUSH PAD TYPE)
3 - BUTT, HINGES TYPE A5112 (NRP)
HDW - EXIT DOOR (EXTERIOR)
WITH STEEL DOOR FRAME
* WOOD FLUSH, SOLID CORE DOUBLE DOOR
DISH WASHING AREA DOOR
1 - ALUMINUM THRESHOLD, J12190
2 - DOOR HOLDER, L01381
2 - DOOR CLOSER, C02021
2 - FLUSH BOLTS
1 - LOCK SET, F04 (LEVER TYPE)
6 - BUTT, HINGES TYPE A5112 (NRP)
HDW - DISH WASHING AREA DOOR
WOODEN LOUVER
350 x 300
* 2EA x 350 x 300 WOODEN LOUVER
WITH STAINLESS STEEL FRAMES
* TEMPERED GLASS DOUBLE DOOR (THK.12mm)
* DOOR SIZE : 1,800 x 2,150 * DOOR SIZE : 900 x 2,150 * DOOR SIZE : 1,800 x 2,150
WITH STEEL DOOR FRAME (HALF SIZE)
* WOOD FLUSH, SOLID CORE SINGLE DOOR
1 - DOOR HOLDER, L01381
1 - DOOR STOP, L02141
1 - KICK PLATE, J102
1 - LOCK SET, F75 (LEVER TYPE)
2 - BUTT, HINGES TYPE A5112
HDW - PASSAGE DOOR
PASSAGE DOOR
,0
,0
,2
VCB VCB
@400 O.C.
METAL STUD
ON 150THK
ON 12THK PLYWOOD
PAINT
INSULATION
SCALE:
WALL SECTIONS & ELEVATIONS
1/20
SCREEN
TENT FABRIC
ON PLYWOOD
PAINT
PASSAGE OPENING
VCB
GRIT
W/NON-SLIP
EPOXY GRIT
W/NON-SLIP
EPOXY
WALL
WALL-SUPPORT
@400 O.C.
METAL STUD
ON 150THK
ON 12THK PLYWOOD
PAINT
GRIT
W/NON-SLIP
EPOXY
VCB VCB
GRIT
W/NON-SLIP
EPOXY
FRAMES
STEEL STRUCTURE
FIX TO MAIN
INSULATION
EXST CONC FLOOREXST CONC FLOOR
EXST CONC FLOOR
VCB
GRIT
W/NON-SLIP
EPOXY
VCB
GRIT
W/NON-SLIP
EPOXY
@400 O.C.
METAL STUD
ON 150THK
ON 12THK PLYWOOD
PAINT
1A 1B 1C 1D
SCALE:
N/A
DOOR DESCRIPTIONS
HAIR-LINE FINISH
STAINLESS STEEL CAP
THK1.4 x 200W(CONT.)
* DOOR SIZE : 900 x 800
HAIR-LINE FINISH
STAINLESS STEEL CAP
THK1.4 x 200W(CONT.)
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A-4
ARCHITECTURAL
W.TOILET
M.TOILET
SCALE: 1/100
SCALE:
IMAGE CUT
N/A
S.S.
PTDWR
PTDWR
VANITY CABINETMOP RACK
GENERAL NOTES
MANUFACTURES INDICATED.
PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.
FOR APPROVAL.
CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITTED TO COR
CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE
SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD
FOR APPROVAL.
CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR
2.
3.
4.
5.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL
AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION
1.
TOILET BUILDING NOTES
TOREA.CO.KR
10,000MM X 3,200MM X 3,700MM
MODEL : TR-CR, TOREA
MOVABLE TOILET PLAN
REPAIR / MAINTENANCE (K) WORK
SCOPE OF WORK (ARCHITECTURAL WORK)
PROVIDE NEW MOVABLE TOILET FACILITY INCLUDING ALL TOILET ACCESSORIES AS SHOWN ON DWG.
CONNECT MECHANICAL AND ELECTRICAL UTILITY LINE TO NEW TOILET.
INSTALLATION TENT
CAMP HOVEYKIM, YK
320257
MOVABLE TOILET PLAN AND NOTES
MOVABLE TOILET
1.
2.
,2
10,000
4,600 5,400
TTD
2-ROLL TYPE
VANITY CABINET
GLASS
MIRROR
MIRROR GLASS
PARTITION
URINAL
AND REMOVE MOVABLE TOILET AFTER COMPLETION.
| A-02 |
| A-04 |
File details come from the government source that posted it. Updated .