REVISED SF1442 BID SCHEDULE 21 Apr 10.pdf
PDF 48 KB Posted
- Solicitation number
- W90FYQ-10-R-0003
- Issued by
-
Department of the Army National Guard
About this file
Revised SF1442 Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 06 May 10 Q A 5PM.pdf | ||
| 06 May 10 Q A 2PM.pdf | ||
| 05 May 10 Q A 12PM.pdf | ||
| Q A 21 APR 2010 4PM.pdf | ||
| Amendment 06.pdf | ||
| Amendment 05.pdf | ||
| Q A 24 FEB 2010 2PM.pdf | ||
| Amendment 04.pdf | ||
| EXHIBIT C Admendment 04.doc | DOC document | |
| Q A 18 FEB 2010 1PM.pdf | ||
| Q A 17 FEB 2010 4PM.pdf | ||
| ADDENDUM NO 00001.pdf | ||
| DRAWINGS_Addendum 00001.pdf | ||
| EXHIBIT G.xls | XLS spreadsheet | |
| Amendment 03.pdf | ||
| GEOTECHNICAL INVESTIGATION REPORT 31 AUG 07.pdf | ||
| Q A 09 FEB 2010 2PM.pdf | ||
| Q A 05 FEB 2010 2PM.pdf | ||
| W90FYQ-10-R-0003 Pre-Proposal Slides Compatibility Mode .pdf | ||
| Sign In Sheet-PreProposal.pdf | ||
| PreProposal Meeting Minutes.pdf | ||
| Questions and Answers.pdf | ||
| Questions and Answers.pdf | ||
| Amendment 02-W90FYQ-10-R-0003.pdf | ||
| EXHIBIT C Admendment 01.doc | DOC document | |
| Admendment 01.pdf | ||
| EXHIBIT F-Admendment 01.doc | DOC document | |
| EXHIBIT C.doc | DOC document | |
| EXHIBIT A.doc | DOC document | |
| W90FYQ-10-R-0003.pdf |
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W90FYQ-10-R-0003-0005
Firm-Fixed Price Contract for new construction at ANGRC Operations Center, Andrews Air Force Base, Maryland. Work w ill be performed in accordance w ith the contract, plans, and technical specifications. This action is being solicited an UNRESTRICTED basis. The North American Industry Classification System (NAICS) code for this work is 238990. The small business size standard is $14.0 Million average annual revenue for the previous three years. Award w ill be unrestricted. Notice of Price Evaluation for HUBZone Small Business concerns in accordance w ith FAR 52.219-4 is applicable. Project magnitude is between $1M and $5M. Failure to submit an offer on all items shall result in rejection of the proposal. All information, amendments and questions w ill be electronically posted at http://www.fbo.gov Preproposal conference is scheduled for 02 Feb at 1000 hours.
JULIANNE JOSEPH 586-239-6582
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-Jan-2010
(RFP)
(IFB)
X
CALL:
RECOVERY--ANGRC OPERATIONS CENTER
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________3 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________02 Mar 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NGB-PARC-S
43200 MAPLE ST
BLDG 105, RM 36
SELFRIDGE ANGB MI 48045
W90FYQ
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
AJXF069112
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
11 May 10
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
BID SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum
POND CONSTRUCTION
FFP
Non-personal services to provide all labor,plant, tools and supervision necessary to construct RECOVERY--Project No.AJXF069112 ANGRC OPERATIONS CENTER (Pond Construction).
FOB: Destination
SIGNAL CODE: A
NET AMT
0002 1 Lump Sum
PORTIONS OF SOUTH PARKING LOT
FFP
Non-personal services to provide all labor,plant, tools and supervision necessary to construct RECOVERY--Project No.AJXF069112 ANGRC OPERATIONS CENTER (Portions of South Parking Lot). Entire project items 1 and 2 are subject to $1.5 Statuatory Limit.
0003 1 Lump Sum
OPTION ELECTRICAL TIE IN
FFP
Non-personal services to provide all labor, plant, tools, and supervision necessary to construct RECOVERY—PROJECT No. AJXF069112 ANGRC OPERATIONS CENTER (Portions of the South Parking Lot). Line Item necessity to be resolved during construction and applied in the event the GOVT requires the Electrical Tie Ins to be performed by another Contractor. This is a CREDIT LINE ITEM to be applied if required. There is no timeframe for this option
File details come from the government source that posted it. Updated .