EXHIBIT G.xls

XLS spreadsheet 38 KB Posted

Attached to
RECOVERY--PROJECT NUMBER AJXF069112, ANGRC OPERATIONS CENTER
Solicitation number
W90FYQ-10-R-0003
Issued by

About this file

EXHIBIT G

View the file

Other files

File Type Posted
06 May 10 Q A 5PM.pdf PDF
06 May 10 Q A 2PM.pdf PDF
05 May 10 Q A 12PM.pdf PDF
Q A 21 APR 2010 4PM.pdf PDF
Amendment 06.pdf PDF
REVISED SF1442 BID SCHEDULE 21 Apr 10.pdf PDF
Amendment 05.pdf PDF
Q A 24 FEB 2010 2PM.pdf PDF
Amendment 04.pdf PDF
EXHIBIT C Admendment 04.doc DOC document
Q A 18 FEB 2010 1PM.pdf PDF
Q A 17 FEB 2010 4PM.pdf PDF
ADDENDUM NO 00001.pdf PDF
DRAWINGS_Addendum 00001.pdf PDF
Amendment 03.pdf PDF
GEOTECHNICAL INVESTIGATION REPORT 31 AUG 07.pdf PDF
Q A 09 FEB 2010 2PM.pdf PDF
Q A 05 FEB 2010 2PM.pdf PDF
W90FYQ-10-R-0003 Pre-Proposal Slides Compatibility Mode .pdf PDF
Sign In Sheet-PreProposal.pdf PDF
PreProposal Meeting Minutes.pdf PDF
Questions and Answers.pdf PDF
Questions and Answers.pdf PDF
Amendment 02-W90FYQ-10-R-0003.pdf PDF
EXHIBIT C Admendment 01.doc DOC document
Admendment 01.pdf PDF
EXHIBIT F-Admendment 01.doc DOC document
EXHIBIT C.doc DOC document
EXHIBIT A.doc DOC document
W90FYQ-10-R-0003.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form 3052 - Pg 1

CONSTRUCTION COST ESTIMATE BREAKDOWNOMB NO 9704-0193
Expires 31 October 1989
CONTRACTOR:ADDRESS:
CONTRACT FOR (Work to be performed):PROPOSED TOTAL CONTRACT PRICE
$0.00
PURCHASE REQUEST NUMBER:PROJECT NUMBER:WORK LOCATION:
AJXF069112ANDREWS AFB, Maryland
LINE NO.ITEM [1]UNIT OF MEASURE
[2]QUANTITY
[3]MATERIAL COSTSLABOR COSTSOTHER DIRECT COSTS [9]LINE TOTAL [10]
UNIT
[4]TOTAL
[5]MANHOURS
[6]AVERAGE RATE
[7]TOTAL [8]
1$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0
29$ - 0$ - 0$ - 0$ - 0
30$ - 0$ - 0$ - 0$ - 0
31$ - 0$ - 0$ - 0$ - 0
32$ - 0$ - 0$ - 0$ - 0
33$ - 0$ - 0$ - 0$ - 0
34$ - 0$ - 0$ - 0$ - 0
35$ - 0$ - 0$ - 0$ - 0

&L&6AF Form 3052, JAN 88 (PREVIOUS EDITION IS OBSOLETE)&C&"Arial,Bold"&9FOR OFFICIAL USE ONLY

Form 3052 Pg 2

INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the units in wich each item is to be estimated (examples-square yards-SY, cubic yards-CY, square feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost..
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows.
TOTAL MATERIAL COSTS$ - 0
TOTAL LABOR COSTS$ - 0
TOTAL OTHER DIRECT COSTS$ - 0
TOTAL DIRECT COSTS$ - 0
OVERHEAD$ - 0
SUBTOTAL$ - 0
PROFIT$ - 0
SUBTOTAL$ - 0
BONDING$ - 0
TOTAL PRICE$ - 0
DATEFIRM NAME
TITLEBY
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a project resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3-807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of:
a. The existing, verifiable data.
b. The Judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computation and projections used therein. This right may be exercised in connection with any negotiations prior to the contract award.

&L&"Arial,Italic"&8(Reverse of AF Form 3052, Jan 88)&C&"Arial,Bold"&9FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .