06 May 10 Q A 2PM.pdf

PDF 11 KB Posted

Attached to
RECOVERY--PROJECT NUMBER AJXF069112, ANGRC OPERATIONS CENTER
Solicitation number
W90FYQ-10-R-0003
Issued by

View the file

Other files

File Type Posted
06 May 10 Q A 5PM.pdf PDF
05 May 10 Q A 12PM.pdf PDF
Q A 21 APR 2010 4PM.pdf PDF
Amendment 06.pdf PDF
REVISED SF1442 BID SCHEDULE 21 Apr 10.pdf PDF
Amendment 05.pdf PDF
Q A 24 FEB 2010 2PM.pdf PDF
Amendment 04.pdf PDF
EXHIBIT C Admendment 04.doc DOC document
Q A 18 FEB 2010 1PM.pdf PDF
Q A 17 FEB 2010 4PM.pdf PDF
ADDENDUM NO 00001.pdf PDF
DRAWINGS_Addendum 00001.pdf PDF
EXHIBIT G.xls XLS spreadsheet
Amendment 03.pdf PDF
GEOTECHNICAL INVESTIGATION REPORT 31 AUG 07.pdf PDF
Q A 09 FEB 2010 2PM.pdf PDF
Q A 05 FEB 2010 2PM.pdf PDF
W90FYQ-10-R-0003 Pre-Proposal Slides Compatibility Mode .pdf PDF
Sign In Sheet-PreProposal.pdf PDF
PreProposal Meeting Minutes.pdf PDF
Questions and Answers.pdf PDF
Questions and Answers.pdf PDF
Amendment 02-W90FYQ-10-R-0003.pdf PDF
EXHIBIT C Admendment 01.doc DOC document
Admendment 01.pdf PDF
EXHIBIT F-Admendment 01.doc DOC document
EXHIBIT C.doc DOC document
EXHIBIT A.doc DOC document
W90FYQ-10-R-0003.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W90FYQ-10-R-0003

Questions and Answers

Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload” Now

05 May 2010

Q1. This project is located within the LEED boundaries outlined under the existing projects.

However no reference is made to any LEED requirements. Is this project subject to LEED requirements? If so, what LEED requirements apply to this project?

A. There are no LEED requirements that apply to this project; however the offerors should note that the retainage pond has been designed to meet LEED criteria. The selected offeror shall construct the pond according to the approved design and may be required to submit a letter documenting that they have indeed constructed the project according to the approved design upon completion of construction.

Q2. Can you please advise how the rebid for the Parking Lot and South Pond RFP is to be formatted? Is it possible to fill out the CLIN costs and sign the addendum or does an entire new proposal (qualifications, past performance, etc) need to be formally resubmitted?

A. As stated in Amendment 06 issued on 21 Apr 2010, Summary of Changes Item #9 “Revised Pricing Proposals are due to the NGB-PARC-S Office located at 43200 Maple Street, Building 105, Room 36, Attention Julianne Cooper, Selfridge ANG Base, 48045- 5213 by no later than 2 p.m. EST on Tuesday 11 May 2010.

Offerors should submit complete revised pricing proposals on the posted revised SF1442 and Bid Schedule. Offerors shall submit one (1) original and three (3) copies of their proposals by the dated specified above.” Please submit only the revised SF 1442 and Bid Schedule in the above specified quantities.

Q3. Per site walk dated 05/05/10, please confirm Sanitary Sewer and Water utilities are sole sourced scope of work for Terrapin Utilities and that all contractors bidding the project are to include and provide the Terrapin Utilities quote for services within the RFP response.

A. All work on the sanitary sewer and water line will be performed, tested, and accepted by

Terrapin. Contact Terrapin at 301.735.4101 to obtain a construction cost estimate for these services. Addendum 01 included the additional information, Item 07 stated “Add specification section 01012 “Special Conditions for Work on Site Sanitary Sewers and Water Systems at Andrews Air Force Base” to the specifications. Under the description of the Addendum 01 it stated the following, “All work to the water and sanitary sewer must be constructed, inspected, tested and approved by Terrapin. Contractors shall contact Terrapin Utility Services to obtain a construction cost estimate to construct water and sanitary sewer at 301.735-4101.”