W901UZ22R0001 0001.pdf
PDF 180 KB Posted
- Attached to
- AMENDMENT 0002 ND CONSTRUCTION MATOC FY22 Federal contract opportunity
- Solicitation number
- W901UZ22R0001
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W901UZ22R0001 0002.pdf | ||
| MATOC EXHIBITS D_AMENDMENT 01.pdf | ||
| MATOC EXHIBITS D_AMENDMENT 01.pdf | ||
| MATOC EXHIBITS C.docx | DOCX document | |
| MATOC EXHIBITS A-B.docx | DOCX document | |
| W901UZ22R0001.pdf | ||
| KKGA182013 Renovate Building 210 B-3 Specifications.pdf | ||
| SOW_KKGA182013 CC and FC.pdf | ||
| JA brand name B210 AH.pdf | ||
| MATOC EXHIBITS D.pdf | ||
| WD.pdf | ||
| KKGA182013 Renovate Building 210 B-3 Drawings.pdf | ||
| JA brand name B210 DDC.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KKGA182013
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to change the pre-proposal meeting date and time from 13 April 2022, 11:30AM CST to 19 April 2022, 10:00AM CST due to anticipated blizzard conditions in North Dakota.
See section 00 21 00 for location and date.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W901UZ22R0001
X 9B. DATED (SEE ITEM 11)
04-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Apr-2022
CODE
W901UZ USPFO FOR NORTH DAKOTA
W5ALXT NDARNG JFHQ
OUSPFO FOR NORTH DAKOTA
PO BOX 5511, FRAINE BARRACKS
BISMARCK ND 58506
W901UZ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W901UZ22R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SECTION 00 21 00
SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. INTRODUCTION
1.1. SCOPE: You are invited to submit a proposal in response to our Request for Proposal (RFP) entitled, “Construction MATOC Solicitation” for construction services for the 119th Wing, Air National Guard, Fargo, North Dakota. As a result of this solicitation, the Government intends that a minimum of two indefinite-delivery, indefinite-quantity, (IDIQ) Task Order Contracts will be awarded, provided sufficient qualified contractors present offers that propose reasonable prices. All awards will be to small business pursuant to a 100% small business set-aside. The contracting officer may set-aside task orders for SBA Certified 8(a) participants; Certified HUBZone Small Business Concerns, Small Business Service Disabled Veteran Owned Business and Women Owned Small Businesses Concerns provided 2 or more qualified contractors in each category present conforming offers and are awarded a MATOC.
1.1.1. Awards will be made to offerors whose proposals are in compliance and conforming to the RFP and are determined to be most advantageous to the Government in terms of Technical, Past Performance and Price.
1.1.2. Projects will be bid build type from already completed designs, and/or projects specified by a Statement of Work using the Master Specification. It should be noted that the majority of work under these contracts will be for sustainment, repair and maintenance (SRM) at or under the $1M dollar level.
1.1.3. The Government reserves the right to issue additional solicitations and award additional contracts within the activities covered by this contract. In this event, new MATOC contractors, in accordance with the terms of their contracts, may compete for Task Orders with the Contractors selected under this solicitation. This is not a solicitation for a Requirements Contract.
1.2. PROJECT CATEGORIES: Work performed under these Multi-Discipline Contracts will generally be of, but are not limited to, the following general project categories:
1.2.1. Construction, repair and alteration of various facilities
1.2.2. Construction, repairs and alteration of Electrical Systems (ES)
1.2.3. Construction, repair and alteration of Mechanical Systems (e.g. HVAC systems, and controls)
1.2.4. Concrete and/or Asphalt Paving
1.3. CONTRACT DURATION, LIMITS AND AMOUNTS: Each of the resulting contracts will have a five year ordering period. The contract program ceiling amount will not exceed $20 million for all task orders awarded over the life of the MATOC program amongst all contracts awarded. The Minimum and Maximum values for a single Task Order are $2,000 and $5 million, respectively. The minimum guaranteed order for each contract is one
(1) task order valued at $2,000. At time of award of the basic contract, a task order for $2,000 will be issued. This task order will be deobligated when a construction task order is awarded. See Division 01, SPECIAL CONTRACT REQUIREMENTS, for details.
1.4. TASK ORDERS
1.4.1. As requirements develop, Task Orders will be competed among the MATOC awardees, or negotiated on a sole source basis as described in Division 01, SPECIAL CONTRACT REQUIREMENTS. These Special Contract Requirements describe the Task Order process in detail. Offerors are highly encouraged to read the Special Contract Requirements before submitting a proposal.
1.4.2. The basic contract will be administered, (e.g. issuing modifications), by the Contracting Office, USPFO, Bismarck, ND.
1.4.3. Individual Task Orders will be awarded and administered by federally appointed contracting officers, and may be issued by any Army or Air National Guard location in the State of North Dakota.
1.4.4. Construction performance requirements will be specified for each project in the Task Order Request for Proposal. MATOC Awardees will compete for Task Orders among themselves. The majority of all Task Orders shall be awarded based on competitive proposals received in response to the agency request for quotation.
1.5. NOTICE OF PRE-PROPOSAL CONFERENCE:
1.5.1. A pre-proposal conference will be conducted on 19 April 2022 at 10:00AM CST for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at BCE Classroom, Bldg 100, 119th Wing, Air National Guard, Fargo, ND. Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit for the Seed Project will be conducted after the pre-proposal conference.
1.5.2. Due to security conditions, all offerors must register to attend this conference. Email the following information for all attendees to 2d Lt Jeffrey Arel and Lt Col Jason Olheiser at the following addresses:
jeffrey.arel.1@us.af.mil and jason.olheiser.1@us.af.mil.
Firm Name and Telephone Number Visitor’s Name and last 4 digits of Social Security No.
Drivers License Citizenship
1.5.3. This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
1.5.4. You will be required to present the following information upon arrival: (1) Vehicle Registration,
(2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
1.5.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
1.5.6. A record of the conference shall be made and furnished to all prospective offerors via posting to the Contract Opportunities website at https://sam.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
1.6. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
1.6.1. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, for proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
1.6.2. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed responsive and/or in the competitive range after closing. All questions and requests for information (RFI) must be received to the Contracting Office NO LATER THAN COB 21 April 2022. Answers will be posted not later than two working days prior to closing. OFFERORS ARE
STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
1.6.3. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to beta.SAM.gov.
1.6.3.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
1.6.4. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities website (SAM.gov). Interested bidders/offerors must register with SAM before accessing the system. SAM registration requires the following information:
1.6.4.1. To register for SAM go to: https://sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page. Bidders/Offerors cannot log into the SAM home page and search for data unless you have an active account.
1.6.5. Submit request for information, by email to the contracting office at the address shown below.
REQUEST FOR INFORMATION- INQUIRY FORMAT
Subject Line: Reference No. W901UZ-22-R-0001 Email: heidi.l.sigl.civ@army.mil and scott.j.boespflug.civ@army.mil Date of Inquiry: _______________ From:
Company Name:
Address:
Phone Number: Email address:
Question: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document)
1.7. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS: The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted on SAM.gov.
1.7.1. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the latest information.
1.8. HAND CARRIED PROPOSALS/INVITATIONS:
1.8.1. A bid repository is provided for hand carried proposals and is located at 119th Wing, NDANG Base Contracting Office, 1Lt Brian Erdmann, 1400 32nd Ave. Room 117, Fargo, ND 58102. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.
1.8.2. Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined in the instructions in the paragraph above titled “Notice of Pre Proposal Conference” for entry. Delays are probable at the entry point and should be accommodated for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
1.9. WAGE DETERMINATION:
1.9.1. The Construction Wage Rate requirements is applicable to the seed project. In the event the current prevailing Wage Determination is changed by the Department of Labor prior to closing date of this solicitation it is the offeror’s responsibility to ensure the most recent determination is used in preparing the proposal. An Amendment may not be issued prior to closing to change Wage Determination dates and/or numbers. Applicable wage rates can be found at: https://sam.gov. The Wage Determination applicable to the seed project is WD ND20220013 dated 25 February 2022.
1.10. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS: This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
1.11. REMOVAL OF SECTIONS AT TIME OF AWARD. Sections 00 21 00, 00 21 16, 00 22 16, 00 45 00 will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
1.12. DISPOSITION OF UNSUCCESSFUL PROPOSALS AND EXTRA SUCCESSFUL PROPOSALS: In compliance with FAR Subpart 4.8, the Government will retain one copy of all proposals. The Government will destroy extra copies of proposals. No destruction certificate will be provided.
1.13. PROPOSAL ACCEPTABILITY: Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award. The offeror is hereby advised that its proposal is presumed to represent its best and final offer in response to this solicitation.
1.14. CLARIFICATIONS: Offeror may, at the discretion of the Government, be asked to provide information for clarification purposes regarding their proposals. Requests for such clarification information do not constitute discussions.
1.15. EXCEPTIONS: If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00 01 10 through 00 22 16) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation.
(The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
1.16. CLAUSES
1.16.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
1.16.2. Clauses and provisions in this document may not appear in consecutive order.
(End of Summary of Changes)