Consolidation of Att_5_MIOSS_Clarification_Form 23 Mar 23.xlsx

XLSX spreadsheet 52 KB Posted

Attached to
The Medical Simulation Training Center (MSTC), Instructor, Operator Support Services (MIOSS) acquisition
Solicitation number
W900KK-23-R-0016
Issued by

About this file

This is a solicitation for instructor and operator support services for Medical Simulation Training Centers. The contractor shall provide instructors to deliver standardized medical training at MSTCs, focusing on Tactical Combat Casualty Care. Services include supporting approximately 2,500 students annually per MSTC. The contract type is firm-fixed-price with a two-month phase-in period and four one-year options. The period of performance is four years and eight months total. This is a small business set-aside under NAICS code 541990 for all other professional services. The contractor must comply with limitations on subcontracting and pay prevailing wages in accordance with collective bargaining agreements. The Army Materiel Command is the contracting agency.

View the file

Other files

File Type Posted
Consolidation of Att_5_MIOSS_Clarification_Form 27 Mar 23.xlsx XLSX spreadsheet
Att_31_Fort McCoy CBA 2021 2024.pdf PDF
MIOSS_Exhibit_K_B011_CDRL_Training_Evaluation_Document.pdf PDF
Att_23_JBLM CBA 2022 2025.pdf PDF
MIOSS_Exhibit_J_B010_CDRL_Quality_Control_Plan_rev1.pdf PDF
Att_14_Schofield Barracks CBA 2022 2025.pdf PDF
Att_15_Fort Campbell CBA 2022 2025.pdf PDF
Att_33_MSTC CPD.pdf PDF
Att_9_MIOSS_Sample_Consent_Letter.docx DOCX document
Att_29_Camp Atterbury DOL WD 2015 4787.pdf PDF
MIOSS_Exhibit_A_B001_CDRL_Accident-Incident_Report.pdf PDF
Att_8_MIOSS_CDRLS_Gov_Rights.xlsx XLSX spreadsheet
Att_1_PWS_MIOSS_v7.5.docx DOCX document
Att_21_Fort Indiantown Gap CBA 2022 2025.pdf PDF
Att_18_Fort Bragg CBA 2022 2025.pdf PDF
Att_22_Fort Stewart CBA 2022 2025.pdf PDF
Att_3_MIOSS_MSTC_Appendix B.pdf PDF
MIOSS_Exhibit_C_B003_CDRL_Presentation_Material.pdf PDF
MIOSS_Exhibit_D_B004_CDRL_Report_Record_of_Meeting_Minutes.pdf PDF
Att_25_Fort Carson CBA 2022 2025.pdf PDF
Att_28_Camp Dodge DOL WD 2015 4979.pdf PDF
MIOSS_Exhibit_B_B002_CDRL_Conference_Agenda.pdf PDF
Att_34_MIOSS QASP.docx DOCX document
MIOSS_Exhibit_G_B007_CDRL_Maintenance_Service_Report.pdf PDF
MIOSS_Exhibit_H_B008_CDRL_Contractors_Progress_Status_And_Mgmt_Plan.pdf PDF
Att_4_C Army EMS SOP Jul2017.pdf PDF
Att_30_Fort Riley DOL WD 2015 5337.pdf PDF
Att_31_Fort McCoy CBA 2021 2024.pdf PDF
Att_6_MIOSS_Compliance_Matrix.xlsx XLSX spreadsheet
Att_16_Camp Ripley CBA 2020 2023.pdf PDF
Att_32_Incidental Spreadsheet.xlsx XLSX spreadsheet
Att_24_Fort Bliss CBA 2021 2024.pdf PDF
Att_19_Fort Hood CBA 2022 2025.pdf PDF
Att_10_MIOSS_Wage_Determinations_and_CBA_Locations.xlsx XLSX spreadsheet
Att_12_MIOSS_Sample_DOL_Wage_Determination_Price_Adjustment_Workbook.xlsx XLSX spreadsheet
Att_27_Fort Dix CBA 2022 2025.pdf PDF
Att_26_Fort Wainwright CBA 20.22 2025.pdf PDF
MIOSS_Exhibit_E_B005_CDRL_Interim_Training_Program.pdf PDF
Att_11_MIOSS_DOL_Wage_Determination_Price_Adjustment_Request_Information.docx DOCX document
MIOSS Amednment to Solicitation W900KK23R0016U0001_23 Mar 23.pdf PDF
MIOSS_Exhibit_L_B012_CDRL_Contractors_Corrective_Action_Plan.pdf PDF
Att_2_Appendix A Training Support SiteLocations for MSTC.pdf PDF
MIOSS_Exhibit_F_B006_CDRL_Post_Training_And_Operations_Report.pdf PDF
Att_13_Fort Benning CBA 2022 2025.pdf PDF
MIOSS_Exhibit_I_B009_CDRL_Contractor and Subcontractor Personnel Roster.pdf PDF
Att_17_Camp Shelby CBA 2022 2025.pdf PDF
Att_7_MIOSS_Price-Cost_Workbook.xlsx XLSX spreadsheet
Att_20_Fort Drum CBA 2022 2025.pdf PDF
Att_5_MIOSS_Clarification_Form.xlsx XLSX spreadsheet
Att_16_Camp Ripley CBA-2020-2023.pdf PDF
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIOSS RFP Clarification Form MIOSS Instructor Operator Support Services (MIOSS) Clarification Form

Solicitation Name:MIOSS Instructor Operator Support Services (MIOSS)
Solicitation Number:W900KK-22-R-0031
Offeror:Shoal Bay Services, LLC JV
POC:Johnny Molina
Title:President
When completing the form, please be sure to identify the page/section/paragraph numbers for which you are providing feedback.
Comment Types:

Critical: Comments of a very serious nature that will affect performance, schedule or quality. These are the “show-stoppers.”

Substantive: Comments of a less serious nature that have noticeable impact on the document’s quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.

Administrative: Comments that address minor items such as typographical, format, and/or grammatical errors.

AREACOMMENT TYPEPAGE NUMBERSECTION NUMBERCOMMENTEVALUATION (Completed by the Government)Column1Column2
SolicitationSubstantive66L.6.1.2The Government is requesting DUNS number which has been superseded by Unique Entity ID (UEID). Our JV was registered with UEID only and no DUNS. Request the Government change DUNS to UEIDCorrected+F12:F29
AttachmentSubstantiveAttachment16Camp Ripley CBA expired 4/30/2019 in preamble; expired 12/30/2017. Which is correct? Does the government have a current CBA?Corrected and uploaded to Sam.gov notice
AttachmentSubstantiveAttachment 10Att_10_MIOSS_Wage_Determinations_and_CBA_Locations.xlsx is incorrect. For example, Ft. Wainwright, AK and Ft. Dix, NJ are listed as Wage Determinations however, they are CBA according to Attachments 26 and 27 respectively.Corrected and uploaded to Sam.gov notice
AttachmentSubstantiveAttachment 7Att_7_MIOSS_Price-Cst_Workbook.xlsx. Worksheet titled “TOTAL EVALUATED PRICE” does not include the government’s surrogate amounts from the worksheet titled “MSTC Price Cost Matrix”. Request the government include the surrogate amounts on the TOTAL EVALUATED PRICE to provide clarity and accurate prices to both government evaluators and offerors.

Many of the CBAs listed wages and health & welfare that go to 2024 and 2025. Should offerors use these amounts and then straightline (no escalation) in the out years. For example, contract award is anticipated as 3rd quarter of FY 2023 (1 June 2023). Should offerors price for CBA locations using the wage/H&W for periods of performance that are listed for August 2022, then use the August 2023 rates for Base Years 6 months and Option Year 1 then switch to August 2024 rates for the remaining portion of OY1? It appears the Option periods will cross over CBA effective dates. Added Surrogate amounts to Total Evaluated Price;

The Offeror shall identify on the Cost-Pricing Workbook (Attachment 7 for Unrestricted Offerors and Attachment X for Restricted Offerors) if each labor category is subject to the Service Contract Labor Standards. The labor rates proposed for each year can be adjusted except for instances where the labor categories are subject to the Service Contract Labor Standards and a revision is permitted under the provisions of FAR Clause 52.222-43. Therefore, offerors are cautioned not to escalate Service Contract Act (SCA) rates.

SolicitationSubstantivePage 71L.6.3.1. Table 3Please advise if Hood (FY22), Bragg (FY23), Bullis (FY24) and CP Williams (FY24) are to be included in our TOTAL EVALUATED PRICE?Important Update! Offerors should only propose for 22 Sites including the Ft Hood 2nd Site which is in operation. Fielding of the Camp Williams, Ft Bragg, and the 25th MSTC (previously Camp Bullis, change to Papago, AZ.) have slipped. USG will issue RFP for these sites at a later dates in FY24
SolicitationSubstantivePage 71L.6.3.1. Table 3If Hood (FY22), Bragg (FY23), Bullis (FY24) and CP Williams (FY24) are to be included in our TOTAL EVALUATED PRICE please provide the current CBA or WD for each location.The most current WDs and CBAs are already posted in SAM.gov Important Update! Offerors should only propose for 22 Sites including the Ft Hood 2nd Site which is in operation. Fielding of the Camp Williams, Ft Bragg, and the 25th MSTC (previously Camp Bullis, but wil likely change to Papago, AZ.) USG will issue RFP for these sites at a later date.
AttachmentSubstantivePage 21Paragraph 2.17What costs are offerors to include in Attachment 32, Incidental Spreadsheet?No cost, this is just a spreadsheet to keep track of any incidental property provided to contractors.
AttachmentSubstantivePage 21Paragraph 2.17Depending on the government’s response to the first question (What costs are offerors to include in Att 32, Incidental Spreadsheet?), where in the MIOSS Price-Cost Workbook should the offerors include the incidental spreadsheet along with costs? And are offerors allowed to add Profit to the identified incidental costs?The incidental Spreadsheet is only for the Government to keep track of what incidentals where provided to the contractor only.
AttachmentSubstantiveAttachment 2Are the Historical Full Time Employees listed contractor personnel or a combination of contractor and Government personnel? If it is a combination of contractor and Government personnel, please provide the number of each type by site.Yes Full Time contractor personnel only.
AttachmentSubstantiveAllAllAttachment 16, Camp Ripley CBA-2016-8667, seems to be an incorrect and outdated CBA. Please advise if this is the correct and current CBA, or alternatively, please provide the correct and current CBA.Effective May 24, 2020 - May 23, 2023
AttachmentCriticalAllAllPlease confirm that the Solicitation's posted CBAs for Fort Carson (Attachment 25) and for Indiantown Gap (Attachment 21) are to be used supersedingly to the WDs that are directed in Attachment 10 for those sites?Correcetd
AttachmentCriticalAllAllWhat is the appropriate WD, or CBA, to use for Camp Williams? Camp Williams is noted in Attachment 2 as being a Site, but there is no WD referenced in Attachment 10, and there is no WD or CBA posted as a Solicitation Attachment.No requirements for Williams and Bullis anymore
AttachmentCriticalAllAllWill the Government please fully clarify with a superseding itemized list by Site, as to which CBA or WD to use for each site; and if a CBA or WD is Not Applicable, please state "Not Applicable"? There are numerous discrepancies between the Attachments to the Solicitation and Attachment 10.CorrectedNew (v3)
SolicitationCritical71 - 73L.6.3.1Are the staff able to obtain Government-provided recertification training at their respective Sites, and if so, is there a cost to the Contractor?Staff is able to obtain recertification training, if available. The cost for recertificaiton is the responsibility of the contractor.New (v4)
SolicitationCritical71 - 73L.6.3.1Will the Government allow the staff to take the necessary time away from their Site duties, to accomplish their recertification training?Yes, however, there can be no impact to training at the staff's home site.New (v4)
SolicitationCritical71 - 73L.6.3.1If staff must travel to an alternate location to obtain recertification training, are those travel costs to be invoiced to the Travel CLIN?No. All cost of recertification is the responsibility of the contractor.New (v4)
SolicitationSubstantive87M.4.5.2Relevancy in this section mentions "with a contract portfolio of $7M or more annually". This clause is not included elsewhere in the instructions in Section L or other sections in the evaluation criteria. Is the word "portfolio" meant to encompass our entire collective set of contracts (min 2, max 5) we include to demonstrate past performance?The portfolio includes only the instant contract.
SolicitationSubstantive24
33Section C
PWS Section 4.2 Facilities ManagementSection C summary in the main solicitation states "The Offeror shall furnish the necessary supplies/services, facilities and materials required to perform the work described in this Solicitation Performance Work Statements (PWS) and all associated attachments/exhibits referenced in Section J of this solicitation." Other portions of the PWS corroborate this statement. However, other portions of the PWS imply that the work addressed by this solicitation (i.e., training) is to be performed on government owned facilities at each army location (i.e., the MSTC sites). Is the government furnishing the facilities or is the contractor is expected to furnish facilities? Please clarify so that we know what to include in our FFP pricing.There are no contractor provided facilities required. This work will take place in the MSTC's. PWS Paragraph 2.16 Government Furnished Materials states The Government will make available the office space, communications capability, and information standard equipment and supplies, e.g. Desks, computers, phone, at each training location. Some minor hand tools primarily. Tools on site will transfer from the incumbant to the winning contractor.

Examples of common tools and test equipment:

Cable, Ties Set, Drill 19 Volt, Drill Bit Set, 50 Foot Extension Cord, 16 Oz. Hammer, 24 Inch Level, Multimeter, 20 Piece Plier Set, Hand Saw, Screwdriver Set Micro, Screwdriver Set Standard, Socket Set Pro, Soldering Gun Kit, Solder Term Assc., 12" Combo Square, 30 Ft. Tape Measure, Bucket Tool Organizer, General Purpose Tool Set, 2.0 am Tool, Kit, 10 Gallon Vacuum, Wire Stripper, Wrench Set

Basic Contract PWSSubstantive17PWS Section 2.10Section 2.10.1 states that the Army Maintenance Contractor is to furnish hand tools and PPE. In Section 2.10.2 it simply states "the Contractor" is responsible for these items and associated costs. Are both mentions referring to the Offeror or another contractor outside of this solicitation. We are requesting clarification so that we know what to include in our FFP pricing.These paragraphs corrected in PWS update. Army Maintenance Contractor is incorrect. MIOSS Contractor is responsible for these costs.
Basic Contract PWSSubstantive17Section C
PWS Section 2.10Section C summary in the main solicitation states "The Offeror shall furnish the necessary supplies/services, facilities and materials required to perform the work described in this Solicitation Performance Work Statements (PWS) and all associated attachments/exhibits referenced in Section J of this solicitation." We are requesting clarification that the materials referenced in this paragraph are just materials to be able to execute as an instructor, not the materials needed to deliver the training.Correct, not the materials needed to deliver training. No contractor provided facilities are required.
SolicitationCritical72L.6.3.1, Table 3Text above Table 3 states "Table 3 below lists the MSTC Sites (CONUS and OCONUS) current staffing by site and the current makeup of that staffing." Is is the government expecting Offerors to bid these exact positions with these exact quantities, or are we to staff according to our ability to meet the performance standards of PWS 3.4.4 (2500 students annually per MSTC) and 3.4.8 (instructor/student ratios)?Exact staffing as stated in Table 3
SolicitationCritical72L.6.3.1, Table 3Table 3 lists some sites at the bottom of the table with a future FY date and infers that they are future sites. When will the future sites be ready for staffing (month/year) so that we can include level of effort for these sites in our firm fixed price bid?Important Update! Offerors should only propose for 22 Sites including the Ft Hood 2nd Site which is in operation. Fielding of the Camp Williams, Ft Bragg, and the 25th MSTC (previously Camp Bullis, change to Papago, AZ.) have slipped. USG will issue RFP for these sites at a later dates in FY24
AttachmentSubstantiveAllAttachment 10
Attachments 13-31The WD/CBA individual attachments listed and summarized in Attachment 10 (12 WD and 7 CBA) do not match the Attachments 13 through 31 (15 CBA and 5 WD) furnished with the final solicitation. Can the Government please resolve this discrepancy.Corrected
SolicitationSubstantive68-71L.6.2Volume II instructions do not contain references to Attachments 10 and 13-31. Is the government instructing us to use these attachments to prepare our pricing for individuals at each of the individual MSTC sites?yes
SolicitationSubstantive68-71L.6.2Volume II instructions do not contain references to Attachments 10 and 13-31. How do we price future sites? Are we to use these attachments to prepare pricing at these future sites?Important Update! Offerors should only propose for 22 Sites including the Ft Hood 2nd Site which is in operation. Fielding of the Camp Williams, Ft Bragg, and the 25th MSTC (previously Camp Bullis, change to Papago, AZ.) have slipped. USG will issue RFP for these sites at a later dates in FY24
Basic Contract PWSCritical293.4.1 (h)STD: The contractor shall be responsible for the cost associated with NREMT recertification and instructor cards. Recommend government replace this language with:

1. The contractor shall be capable of self re-certifying through NREMT and responsible for paying all related costs for their contract staff only.

2. The contractor should maintain the internal capability of certifying and recertifying instructors for BLS, ALS, PAL, PHTLS provider, instructor and instructor trainer certifications for contract staff and associated costs.Language is sufficient, no change.
Basic Contract PWSSubstantive212.18Does the Government intend to furnish the referenced QASP after award?Yes.
Basic Contract PWSCriticalPWS 293.4.1Have the Medical Certification Standards been recently mapped to the simulation scenarios currently being used? If yes, what year?No
Basic Contract PWSCriticalPWS 313.4.1Is each site using the same curriculum and scenarios?Sites use a standard curriculum and scenarios with additional site specific training.
Basic Contract PWSCriticalPWS 303.4.7Has the content of the scenarios been mapped back to the course objective?Training scenarios developed and provided by proponant.
Basic Contract PWSCriticalPWS 303.4.2Are Leads currrently trained or certified in healthcare simulation or healthcare simulation operations?This training/certificaiton is not a requirement.
AttachmentSubstantiveAttachment 311The Ft. McCoy CBA appears to only be a two-page cover of continuation document. Can the government please provide the Ft. McCoy CBA in its entirety?The most current FT McCoy WD is loaded to the Solicitation notice
SolicitationSubstantive3652.217-9Text states "the total duration of this contract, including the exercise of any options under this clause, shall not exceed _____." Request the Government please insert to the "Not to Exceed" date.Not to exceed 5 years. Added.
SolicitationAdministrative3452.244-6Subcontracts for Commercial Products and Commercial Services is dated DEC 22. Request Government please revise RFP Clause date from Jan 2022 to read as Dec 2022. Refer to FAC 2023-1 dated 01DEC 22 changed the clause date.Updated with most current of Mar 2023
SolicitationCritical72Table 3Can the Government please confirm the status of the four expansion locations? Did Fort Hood come online in 2022, and is Fort Bragg, Fort Bullis and CP Williams still on schedule for 2023 (Bragg) and 2024 (Bullis and Williams)?Important Update! Offerors should only propose for 22 Sites including the Ft Hood 2nd Site which is in operation. Fielding of the Camp Williams, Ft Bragg, and the 25th MSTC (previously Camp Bullis, change to Papago, AZ.) have slipped. USG will issue RFP for these sites at a later dates in FY24
Basic Contract PWSCritical61.3.1Can the Government please supply a list of any materials, equipment and supplies will be available for contractor use at the sites? Will there be any supplies, equipment, materials, or furniture provided?Office facilities for I/Os are provided. Supplies services and materials will be office supplies, minor hand tools primarily. Tools will transfer from the incumbant to the winning contractor.

Examples of common tools and test equipment:

Cable, Ties Set, Drill 19 Volt, Drill Bit Set, 50 Foot Extension Cord, 16 Oz. Hammer, 24 Inch Level, Multimeter, 20 Piece Plier Set, Hand Saw, Screwdriver Set Micro, Screwdriver Set Standard, Socket Set Pro, Soldering Gun Kit, Solder Term Assc., 12" Combo Square, 30 Ft. Tape Measure, Bucket Tool Organizer, General Purpose Tool Set, 2.0 am Tool, Kit, 10 Gallon Vacuum, Wire Stripper, Wrench Set

Basic Contract PWSSubstantive142.6Can the Government please provide an estimate of the amount of time needed to process a new employee so they are cleared to access the sites?On average, new employee processing by the Government takes less than 5 business days, though OCONUS sites do take longer.
Basic Contract PWSCritical293.4.1Do the sites have office space for employees (outside of the training areas) for administrative work, or for planning, evaluating or writing reports?Yes.
Basic Contract PWSSubstantive182.1.4Are there any locations where employees are required to have security clearances?No
Basic Contract PWSSubstantive293.4.1Does the Government anticipate situations where employees at one site may need to be deployed to a different site to assist with surge training or other emergent training situations?Yes…If an surge is required because the contractor site is short an I/O(s) the contractor covers the surge cost. If the surge need is based on Government identified requirement and the site has full compliment of I/O's, the Government will cover the travel cost.
SolicitationSubstantiveSection J and Clarification formP. 47 of 88 and Tab 2 of the clarification formSection J of the solicitation lists only one PWS, yet in column A of the MIOSS Clarification form, the dropdown menu offers 7 options from which to select. Three options listed refer to the Basic Contract PWS, MMSAT Task order 1 PWS and the MSTC Task Order 2 PWS. The only PWS included as part of the solicitation was titled PWS MIOSS V7.3 dated 14 July 2022. Should additional PWS documents have been provided with the solicitation?The MIOSS Base and TO PWS's were combined. The MIOSS PWS version 7.4 is the last update. Disregard all others.
N/ASubstantiveCUI Classification Cover SheetsAllSince most documents included CUI coversheets but did not have CUI banner markings at the top and bottom of each of the pages, what is the government's expectation for CUI markings for the proposal submission?Just Cover Sheets
Basic Contract PWSSubstantive6 of 341.31 and 1.3.3PSW States "Unless otherwise specified herein, the Contractor shall provide all
personnel, equipment, supplies, facilities, transportation, tools, materials, supervision and other items necessary to satisfy the performance-based requirements contained herein." Would the government provide the list of equipment, supplies, transportation, tools, materials and "all other items" necessary to satisfy the performance-based requirements?Should be part of the bidders method of operation. No vehicles are provided or required. Office facilities for I/Os are provided. Supplies services and materials will be office supplies, minor hand tools primarily. Tools will transfer from the incumbant to the winning contractor.

Examples of common tools and test equipment:

Cable, Ties Set, Drill 19 Volt, Drill Bit Set, 50 Foot Extension Cord, 16 Oz. Hammer, 24 Inch Level, Multimeter, 20 Piece Plier Set, Hand Saw, Screwdriver Set Micro, Screwdriver Set Standard, Socket Set Pro, Soldering Gun Kit, Solder Term Assc., 12" Combo Square, 30 Ft. Tape Measure, Bucket Tool Organizer, General Purpose Tool Set, 2.0 am Tool, Kit, 10 Gallon Vacuum, Wire Stripper, Wrench Set

Basic Contract PWSSubstantive5 of 341.2There are three references to Cadavers in the PWS. The PWS States "in addition to POR training aids, Cadavers may also be utilized for 68W Training", in section 1.31, government states "the contractor shall provide…all other items necessary to satisfy the requirements". Are contractors expected to provide cadavers for training? If so, will the government provide the historical number of cadavers required for use during the execution of this contract over a one year period by location?The Government will provide cadavers.
Basic Contract PWSSubstantive17 of 342.9Will the government provide a list of types of vehicles, Material Handling Equipment and Transportation capabilities the contractor shall provide for each MSTC location?PWS paragraph 2.9 removed. There are no vehicles, transportation requirements or Material Handling Equipment required.
Basic Contract PWSSubstantive17 of 342.10.1Will the contractor awarded the MIOSS contract serve as the Army Maintenance contractor for the MSTCs?No. Maintenance is the responsibility of the ATMP and follow-on Warfighter TRS contractor.
Basic Contract PWSSubstantive33 of 344.2Will the government provide the list of installations that require occupants to maintain the facilities they occupy?All PWS section 4 Special Requirements are "only if directed by the PCO". If facilities management is required, PCO will notify the contractor, and the contractor will have opportunity to propose to the requirement.
Basic Contract PWSSubstantive17 of 342.10.1, 2.10.2Section 2.10.1 the PWS states the Maintenance Contractor shall provide all common tools, PPE and other common equipment. Section 2.10.2 States the CONTRACTOR shall provide all common tools, PPE and other common equipment. Request clarification on who provides all common tools, PPE and other common equipment.No vehicles are provided or required. Office facilities for I/Os are provided. Supplies services and materials will be office supplies, minor hand tools primarily. Tools will transfer from the incumbant to the winning contractor.

Examples of common tools and test equipment:

Cable, Ties Set, Drill 19 Volt, Drill Bit Set, 50 Foot Extension Cord, 16 Oz. Hammer, 24 Inch Level, Multimeter, 20 Piece Plier Set, Hand Saw, Screwdriver Set Micro, Screwdriver Set Standard, Socket Set Pro, Soldering Gun Kit, Solder Term Assc., 12" Combo Square, 30 Ft. Tape Measure, Bucket Tool Organizer, General Purpose Tool Set, 2.0 am Tool, Kit, 10 Gallon Vacuum, Wire Stripper, Wrench Set

SolicitationAdministrative69L.6.2Can the newer version of Excel (MS Excel 365) be used for the Cost and Price Volume instead of MS Excel 2013?Yes, MS 365 Applications may be used
SolicitationAdministrative72 and Attachment 2Table 3 MSTC SitesHas "Hood (FY22) been pushed back to FY 23 or later since FY22 is finished?Important Update! Offerors should only propose for 22 Sites including the Ft Hood 2nd Site which is in operation. Fielding of the Camp Williams, Ft Bragg, and the 25th MSTC (previously Camp Bullis, change to Papago, AZ.) have slipped. USG will issue RFP for these sites at a later dates in FY24
SolicitationSubstantive86 of 88M.4.3This section requires us to address quality, communication, logistics, personnel actions, etc. Is the Government only concerned with our initial 60-day approach to these tasks or are you looking for specific procedures used during phase-in and our processes to maintain similar actions throughout the period of performance?Both phase-in and continuous processes
SolicitationSubstantive73 of 88L.6.3.2(1)This section requires us to address our Management Structure for Hiring, Manning, Staffing, and Training Personnel during phase-in Is the Government only concerned with our initial 60-day approach to management or are you also looking for our management structure focused on executing this contract throughout the period of performance?Both phase-in and continuous processes
SolicitationSubstantive86 of 88M.4.4This section states No additional credit will be given for experience in more than two of the areas in items (5)-(8). This section seems to be a prime opportunity for the Government to evaluate and distinguish between which companies are technically capable of executing all aspects of this contract. For example a competitor may have experience providing training certificates and modifying training scenarios but has zero experience in actually providing medical-skills training and managing at least 2,500 students per year. Will the Government please reconsider this evaluation standard to a demonstration of technical capability in all areas?The Government has determined that LPTA is the Acquisition Strategy to be used.
Basic Contract PWSSubstantive6, 6, 17,1.3.1, 1.3.3, 2.9, 2.10These sections of the PWS Specify that unless otherwise specified, the contractor shall provide equipment, supplies, facilities, transportation, tools, materials, cadavers, personal protective equipment, consumables and material handling equipment. Will the government add a reimbursable other direct cost plug # similar to travel to cover these costs?No vehicles are provided or required. Office facilities for I/Os are provided. Supplies services and materials will be office supplies, minor hand tools primarily. Tools will transfer from the incumbant to the winning contractor.

Examples of common tools and test equipment:

Cable, Ties Set, Drill 19 Volt, Drill Bit Set, 50 Foot Extension Cord, 16 Oz. Hammer, 24 Inch Level, Multimeter, 20 Piece Plier Set, Hand Saw, Screwdriver Set Micro, Screwdriver Set Standard, Socket Set Pro, Soldering Gun Kit, Solder Term Assc., 12" Combo Square, 30 Ft. Tape Measure, Bucket Tool Organizer, General Purpose Tool Set, 2.0 am Tool, Kit, 10 Gallon Vacuum, Wire Stripper, Wrench Set

Basic Contract PWSSubstantive72.2Will the government please provide information on the number and scope for the referenced Associated Contractor Agreements (ACAs) by location?There will be the MIOSS contractor and the Army MSTC TADSS support contractor.
AttachmentCriticalAtt 2 Appendix A
Page 2In the list of training support site locations, there is an entry for Ft Hood (FY22), Ft Bragg (FY23), Camp Bullis (FY24) and Camp Williams (FY24). Is the Ft Hood site already established since FY22 is complete - should it be included in the pricing of the solicitation. Same question for Ft Bragg (FY23), Camp Bullis and Camp Williams.Important Update! Offerors should only propose for 22 Sites including the Ft Hood 2nd Site which is in operation. Fielding of the Camp Williams, Ft Bragg, and the 25th MSTC (previously Camp Bullis, change to Papago, AZ.) have slipped. USG will issue RFP for these sites at a later dates in FY24
Basic Contract PWSCritical17PWS 2.9"Contractor shall provide all vehicles, MHE and transportation capabilities to perform the requirements of this PWS" What is the inventory of vehicles, MHE and other transportation items necessary historically?PWS paragraph 2.9 removed. There are no vehicles, transportation requirements or Material Handling Equipment required.
Basic Contract PWSSubstantive17PWS 2.10Is there a listing of common tools that will help contractors prepare for execution? Can you confirm that there are no diagnostic or other advanced instruments included in the common tools and equipment that the contractor is expected to provide?No vehicles are provided or required. Office facilities for I/Os are provided. Supplies services and materials will be office supplies, minor hand tools primarily. Tools will transfer from the incumbant to the winning contractor.

Examples of common tools and test equipment:

Cable, Ties Set, Drill 19 Volt, Drill Bit Set, 50 Foot Extension Cord, 16 Oz. Hammer, 24 Inch Level, Multimeter, 20 Piece Plier Set, Hand Saw, Screwdriver Set Micro, Screwdriver Set Standard, Socket Set Pro, Soldering Gun Kit, Solder Term Assc., 12" Combo Square, 30 Ft. Tape Measure, Bucket Tool Organizer, General Purpose Tool Set, 2.0 am Tool, Kit, 10 Gallon Vacuum, Wire Stripper, Wrench Set

SolicitationSubstantive2ADoes the removal of the language in the draft "Additional task orders may be contemplated during contract performance" mean that additional TOs are not anticipated? References to subsequent task orders have been removed for this final solicitation.Yes. No other TO's being considered at this time.
SolicitationSubstantive24CIs there a historical listing of supplies/service, facilities and materials required to perform the work described in the solicitation PWS and all associated attachments/exhibits references in Section J of this solicitation?No vehicles are provided or required. Office facilities for I/Os are provided. Supplies services and materials will be office supplies, minor hand tools primarily. Tools will transfer from the incumbant to the winning contractor.

Examples of common tools and test equipment:

Cable, Ties Set, Drill 19 Volt, Drill Bit Set, 50 Foot Extension Cord, 16 Oz. Hammer, 24 Inch Level, Multimeter, 20 Piece Plier Set, Hand Saw, Screwdriver Set Micro, Screwdriver Set Standard, Socket Set Pro, Soldering Gun Kit, Solder Term Assc., 12" Combo Square, 30 Ft. Tape Measure, Bucket Tool Organizer, General Purpose Tool Set, 2.0 am Tool, Kit, 10 Gallon Vacuum, Wire Stripper, Wrench Set

SolicitationAdministrative67L.6.1.2This paragraph requires the Offeror to provide their Taxpayer Identification Number (TIN), Data Universal Numbering System (DUNS), and offeror and Government Entity (CAGE) code for the prime offeror, all major Subcontractors, and joint ventures. Should DUNS number be replaced by Unique Entity Identifier (UEI) number?Corrected
SolicitationAdministrative75L.6.4.1.(4)This paragraph requires the Contractor/JV Partner/Major Subcontractor place of performance, CAGE Code and DUNS Number. Should DUNS number be replaced by Unique Entity Identifier (UEI) number?With a corresponding Commercial And Government Entity Code (CAGE Code) and Unique Entity

Identification Number (UEI Number) in SAM.GOV (http://sam.gov) that matches the Offeror name on the SF 33, Block 15A.

SolicitationAdministrative67L.6.1.3Can the Master Cross Reference Matrix included in each volume be excluded from page limits?Added to the page count exclusion list in L.4.3
SolicitationAdministrative62L.4.3For Volume I, is the Volume Summary (limited to one page) in addition to Section 1: Executive Narrative Summary?Yes, allowed a Volume Summary of one page (Volumn Summary is on the zero page count list in addition to Section 1: Executive Narrative Summary
SolicitationAdministrative63L.4.3Please clarify that Proprietary Information markings can be in the header or the footer, and are not required in both?FAR 52.215-1 says Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall-

(1) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed-in whole or in part-for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of-or in connection with-the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

AttachmentSubstantive1Exhibit J, CDRL B010 and
PWS 3.3.3(g)Can the Government please update the CDRL B010 document to clarify first submissions are due 45 days after contract award per PWS 3.3.3(g)? Block 12 is blank and also not referenced in the remarks section (block 16).”CDRL B010 updated as requested.
AttachmentSubstantiveVariousAtt_10_MIOSS_Wage_Determinations_and_CBA_Locations

Att_23_JBLM CBA 2022-2025 Att_24_Fort Bliss CBA .2021-2024 Att_26_Ft._Wainwright CBA 20.22-2025 MSTC Instructor Operator Support Services (MIOSS) Wage Determinations (WD) and Collective Bargaining Agreement (CBA) Locations identifies the following WDs:

- WD 2015-5229 for the Site/State Ft. Bliss, TX

- WD 2015-5683 for the Site/State Ft. Wainwright, AK

- WD 2015-4945 for the Site/State Ft. Lewis, WA

However, the Solicitation also provides a CBA for each of these locations as attachments. Please clarify if Att_10_MIOSS_Wage_Determinations_and_CBA_Locations should have the corresponding CBAs in the “WD or CBA Number” (Column A) or are the CBAs not applicable (N/A).The most current CBA/WD are loaded to SAM.gov. will update Att 10 to match Attms
SolicitationCriticalPages 3, 4, and 69Section B and Section L, Paragraph L.6.2.1.2States that the offeror must provide information as follows: Prices for the Phase-In period shall be included within the base year prices and proposed under CLIN 0001. CLIN 0001 is for the Phase-In period and CLIN 0002 is for the CONUS Base Year and CLIN 0003 is for the OCONUS Base Year.
Is it the Governments intention for the offerors to include their Phase-In period FFP amounts in CLINs 0002 and 0003 and leave CLIN 0001 blank? The Attachment 7 worksheet also has a blue shaded cell for CLIN 0001 - Phase-In. Please clarify.Yes, Phase in price to be included in the base year CLINs. Do not fill out CLIN 0001.
SolicitationSubstantivePages 3-23Section BSection L, Paragraph L.6.2.1.2 states the Contractor Service Requirement (CSR) and Contract Deliverables Requirements List (CDRL) CLINs are Not Separately Priced (NSP).
Will the Government complete these CLINs under the AMOUNT Column with the notation "NSP" or should the offeror complete the CLINs inputting "NSP"?CDRL CLIN alredy spellout "CDRLs are not separately price"
SolicitationSubstantivePages 3-23Section BSection L, Paragraph L.6.2.1.2 states the Mission Essential Travel CLINs for the base year through option year four are Government provided surrogate amounts that may not be changed.
Should the contractor input these corresponding amounts in the Section B CLINs under the AMOUNT Column in order to match the amounts included in the Price Cost Matrix?Yes
SolicitationCritical22Section BIn Section L, Paragraph L.6.2.1.2 it states that MIOSS OCONUS CLINs 0003, 1003, 2003, 3003, 4003, and 5003 are FFP and are to be priced as such. CLIN 5003 is missing from Section B and should be included.
Recommend the Government label CLIN 5002 as CONUS and CLIN 5003 as OCONUS in Section B to be consistent with the rest of Section B labeling.There is no CLIN 5003. CLIN 5002 is the Option to Extend Services for 6 month and the only Labor CLIN for that 6 month period. Ther is further guidance on that CLIN under pricing in sectio L.
SolicitationSubstantivePage 24Section C - Descriptions and SpecificationsParagraph states offeror shall furnish the necessary supplies/services, facilities, and materials required to perform the work described in the PWS.

Request the government provide a list of supplies/services, facilities and materials. Office facilities for I/Os are provided. Supplies services and materials will be office supplies, minor hand tools primarily. Tools will transfer from the incumbant to the winning contractor.

Examples of common tools and test equipment:

Cable, Ties Set, Drill 19 Volt, Drill Bit Set, 50 Foot Extension Cord, 16 Oz. Hammer, 24 Inch Level, Multimeter, 20 Piece Plier Set, Hand Saw, Screwdriver Set Micro, Screwdriver Set Standard, Socket Set Pro, Soldering Gun Kit, Solder Term Assc., 12" Combo Square, 30 Ft. Tape Measure, Bucket Tool Organizer, General Purpose Tool Set, 2.0 am Tool, Kit, 10 Gallon Vacuum, Wire Stripper, Wrench Set Solicitation Substantive Pages 26 - 28 Section F - Deliveries or Performance, F.1 DELIVERY INFORMATION All CLIN POPs and Delivery Dates (pages 26-28) are scheduled for delivery during the period 30 May 2023 - 29 Jul 2023.

Request Government correct to reflect actual scheduled POPs and Delivery Dates.Corrected PoP
SolicitationSubstantivePage 47Section J List of Documents, Exhibits and Other Attachments, Attachment 10 MIOSS Wage Determinations and CBA LocationsAttachment 10_MIOSS Wage Determinations and CBA Locations does not match the RFP attachments for CBA's and WD's provided under this RFP. Attachment #10 identifies which of the MTSC MIOSS sites are covered by CBAs, and those covered by Wage Determinations. However, seven (7) of the sites identified as being covered by WD's actually have affliated RFP attachments with a CBA: 1) Ft. Wainwright, AK (Attachment #26); 2) Ft. Carson, CO (Attachment #25); 3) Ft. Stewart, GA (Attachment #22); 4) Ft. Dix, NJ (Attachment #27); 5) Ft. Drum, NY (Attachment #20); 6) Fort Indiantown Gap (Attachment #21); and 7) Ft. Lewis/JBLM, WA (Attachment #23).
Request the government amend Attachment #10 to correctly identify the sites that have an active Collective Bargaining Agreement associated with each of the sites identified.Corrected
SolicitationSubstantivePage 60Section L.3.1L.3.1 states "In accordance with FAR 15.306(c)(2), if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may make a competitive range determination for purposes of efficiency, consisting of only those proposals that have a reasonable chance of award without a major rewrite." However, this appears to be incongruent with the LPTA Evaluation Approach that will be used to evaluate the Offerors described in Section M.3 (page 83).

Question: Under which subparagraph of Section M.3 does the competitive range in Section L.3.1 apply to the Government evaluation of this RFP? Is it paragraph M.3.2.3.2, which only applies if ALL proposals have been evaluated and rated unacceptable?

Question: It is very unusual to use a competitive range for an LPTA evaluation approach, so could the Government please explain why they included this language in the MIOSS RFP?Corrected the Language in Solicitation L.3.1 to properly state: In accordance with FAR 15.306(c)(2), After evaluating all proposals in accordance with 15.305(a) and paragraph (c)(1) of this section, the contracting officer may determine that the number of most highly rated proposals that might otherwise be included in the competitive range exceeds the number at which an efficient competition can be conducted. Provided the solicitation notifies offerors that the competitive range can be limited for purposes of efficiency (see 52.215-1(f)(4)), the contracting officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals ( 10 U.S.C. 3303 and 41 U.S.C.3703).
SolicitationSubstantivePage 62

Page 69 Section L.4 Proposal Delivery, Paragraph L.4.2, Section L.6.2. Volume II Factor 1: Cost/Price The Request for Proposal specifies that "any MS Excel spreadsheets included as exhibits supporting the Cost and Price Volume should be in MS Excel 2013 format. This format must be editable and executable by the Government evaluator(s), clearly showing the calculations and formulas used in each cell".

IAW Microsoft's Lifecycle Policy, as of April 11, 2023, Microsoft Excel 2013 (or any other MS Office 2013 products) will no longer receive security updates or support.

This could potentially increase an organization's exposure to security risks or affect compliance obligations. To mitigate this risk and achieve initial CMMC Level 1 certification, we have migrated from MS Office 2013 products to MS Office 365.

https://support.microsoft.com/en-gb/office/end-of-support-for-office-2013-90e4b0d1-098f-4656-b6e7-8b13b67ed62f

As the MS Office 2013 software is set to expire soon, it is no longer available for download on the Microsoft website, and is challenging to obtain through third party providers. This could pose difficulties for both the government and the offeror.

This issue affects not only MS Excel but also MS Word which are both required in the development of proposals..

Request that the government resolve the software issue and permit the use of MS Excel 365 and MS Word 365 format.Corrected in Section L
SolicitationSubstantivePage 62

Page 69 Section L.4 Proposal Delivery, Paragraph L.4.1.

Section L.6.2. Volume II Factor 1: Cost/Price Section L.4, Paragraph L.4.1. Indicates the use of MS Word in developing your proposals, however in Section L.6.2, Volume II Factor 1: Cost/Price it indicates "Narratives regarding the Cost/Price Volume shall be submitted in PDF format".

Recommend that the government permit the cost/price narrative be submitted in MS Word 365.Corrected in Section L
SolicitationSubstantivePage 65Section L.6.1.1. , Volume I, Section 1: Executive SummaryThis section for the Executive Summary contains the statement, "A letter formally transmitting the proposal shall include"". This statement appears to be in the wrong section and raises questions as to what it shall include.
Recommend this transmittal letter requirement be moved to Section L.4. and include the specific requirements from the current Sections L.6.1.1.1. through L.6.1.1.6 that shall be submitted in the letter.The Government believes the this is fine as stated. L.4 is just for general delivery instructions. The Gov believes the statement in question, "A letter formally transmitting the proposal shall include:" supports L.6.1.1 Section "Executive Narrative Summary" and the following paragraphs outline the letter contents.
SolicitationSubstantivePage 66Section L.6.1.2. Section 2: Table of Contents and GlossaryThe last sentence of this section requires that the Offeror shall provide the TIN, DUNS, and CAGE codes for the prime and all major subcontractors. This requirement appears to be out of place in the Table of Contents.
Recommend this requirement be moved to Section L.6.1.5. Section 5: Representations, Certifications, and Other Statements of Offerors on Page 68.The Government believes the this is fine as stated.
SolicitationSubstantivePage 67Section L.6.1.3. Section 3: Master Cross Reference and Compliance MatrixThis section requires that the subject matrix shall be included in each Volume of the proposal (Volumes I, II, III, and IV). If this is the Government's intent, request that the Cross Reference and Compliance Matrix requirement be added to the listing of items not included in page counts as contained in Section L.4.3. on page 62.Added Master Cross Reference Matrix to Section L.4.3
SolicitationCriticalPage 68

Page 85 Section L.6.2 Volume II Factor 1: Cost/Price and

Section L.6.3.1 Factor 2: Technical - Qualified Personnel, Table 3 Current MSTC Staffing by Location, Labor Category, and Quantity

Section M Evaluation Factors for Award, M.4.2, Factor 2: Technical - Qualified Personnel, pagagraph (12) Table 3 indicates there are a total of 125 FTE on the MIOSS effort which includes 20 FTE located at new sites Fort Hood (FY22), Fort Bragg (FY23), Camp Bullis (FY24), and Camp Williams (FY24).

Request the government provide a list of those sites that have currently become active, or intended date to become active, and staffing levels for each.

Does the government want offerors to propose pricing for the four new sites? If that is the case, request government provide guidance, and updated CBAs/WDs as necessary.Important Update! Offerors should only propose for 22 Sites including the Ft Hood 2nd Site which is in operation. Fielding of the Camp Williams, Ft Bragg, and the 25th MSTC (previously Camp Bullis, change to Papago, AZ.) have slipped. USG will issue RFP for these sites at a later dates in FY24
Basic Contract PWSSubstantivePage 17Paragraph 2.9States that contractor shall provide all vehicles, material handling equipment, and transportation capabilities required to perform the requirements of this PWS.

Request the government provide a list of equipment/vehicles/tranportation required and locations? Contractor provided vehicles are not required nor authorized under the MIOSS contract.

No special material handling equipment or transportation capabilities are required. Recommend removing paragraph 2.9 from PWS.

Basic Contract PWS Substantive Page 17 Paragraph 2.10 Tools and Equipment Requires contractor to provide all common tools (e.g., hand tools, glue guns, toolboxes etc.), personal protective equipment (e.g., protective goggles, gloves, etc.) and other common equipment required to perform the requirements of this PWS.

Request the government provide list of all common tools and equipment required by site. Office facilities for I/Os are provided. Supplies services and materials will be office supplies, minor hand tools primarily. Tools will transfer from the incumbant to the winning contractor.

Examples of common tools and test equipment:

Cable, Ties Set, Drill 19 Volt, Drill Bit Set, 50 Foot Extension Cord, 16 Oz. Hammer, 24 Inch Level, Multimeter, 20 Piece Plier Set, Hand Saw, Screwdriver Set Micro, Screwdriver Set Standard, Socket Set Pro, Soldering Gun Kit, Solder Term Assc., 12" Combo Square, 30 Ft. Tape Measure, Bucket Tool Organizer, General Purpose Tool Set, 2.0 am Tool, Kit, 10 Gallon Vacuum, Wire Stripper, Wrench Set Basic Contract PWS Critical Page 30 Paragraph 3.4.6 This paragraph references the "MSTC Capabilities Production Document (CPD)", but the CPD is not included as part of the RFP.

Request the Government provide the CPD document to the Offerors.CPD Provided as Att 33
Basic Contract PWSSubstantivePage 33Paragraph 4.2 Facilities ManagementRequires offeror to provide housekeeping, custodial services, rodent control and grounds maintenance.
Request the government provide a list of facilities where this is required.Section 4 are not contract requirements unless specifically requested by Government Contracting Officer in writing.
Basic Contract PWSSubstantivePages 33 - 34Paragraph 5.0 DeliverablesThere are some updates located at https://quicksearch.dla.mil/ to the Data Item Descriptions (DID) for four of the CDRLS as listed on the referenced page of the PWS as follows:
•B002: DI-ADMN-81249B, Conference Agenda. Has been updated to a "C" version, dated 20210730.
•B005: DI ILSS-81070, Training Program Development and Management Plan (TPDMP). Has been cancelled by Notice 2, dated 20211026.
•B007: DI-MGMT-80995, Maintenance Service Report. Has been updated to an "A" version, dated 20061108.
•B011: DI-PSSS-81524C, Training Evaluation Document. Has been updated to a "D" version, dated 20191218.
Request the Government provide clarification that offerors either use the outdated and cancelled DIDs during contract performance or the use the updated versions and disregard the CDRL B005 requirement.Yes use updated versions, these updates applied to relevant documents. CDRLB005 was updated to DI-MGMT-81955 Interim Training Development Package. Updated in PWS and QASP.
AttachmentSubstantiveAttachment 2_Appendix A Training Support Site Locations for MSTC lists NEW sites. Appendix A shows all MSTC sites to include the four new locations at Fort Hood (FY22), Fort Bragg (FY23), Camp Williams (FY24) and Camp Bullis (FY24).

Questions:

1). Is the Fort Hood site operational as of the date of release of this RFP?

2). Is the Fort Bragg site operational as of the date of release of this RFP?Important Update! Offerors should only propose for 22 Sites including the Ft Hood 2nd Site which is in operation. Fielding of the Camp Williams, Ft Bragg, and the 25th MSTC (previously Camp Bullis, change to Papago, AZ.) have slipped. USG will issue RFP for these sites at a later dates in FY24
AttachmentSubstantiveAttachment 19 Fort Hood CBA 2022-2025.
With the assumed addition of the new Fort Hood MSTC (FY22) and personnel, will Attachment 19 Fort Hood CBA apply to all personnel across the two Fort Hood MSTCs?YES
AttachmentSubstantiveAttachment 7 - MSTC Price Cost Matrix TabAttachment 7 - MSTC Price Cost Matrix TabIn Note 2 at the bottom of the Matrix it states: "THE GOVERNMENT WILL CALCULATE THE PRICE OF THE SIX-MONTH OPTION TO EXTEND SERVICES BY DIVIDING THE TOTAL VALUE FOR OPTION YEAR 2 SECTION B (FIXED PRICE AND COST CLINS) BY TWO." The Cost Price Matrix 6 month extension period computation for the cells in the worksheet tab take 50% of each option year 4 CLIN prices and that is the same process stated in Section M, Paragraph M.4.1.4.
Recommend Note 2 be changed to reflect it being option year 4 divided by two.Fine as stated.
SolicitationCritical66 of 88L.6.1.1.4This section requires an Offeror to establish and maintain acceptable business systems in accordance with DFARS 252.242-7005. The business systems required by this clause includes multiple systems; Cost Estimating, Earned Value Management, Material Management and Accounting, Accounting, Contractor Purchasing and Contractor Property Management. However, the remaining portions of this section only references the Offerors Accounting System. Please clarify what the government is requiring. Suggest the use of DFARS 252.242-7006 Accounting System Administration versus DFARS 252.242-7005No DFAR 252.242-7005 is the approved requirement for this Solicitation.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .