Paragraph_L.10.0_Track_Changes.pdf
PDF 138 KB Posted
- Attached to
- Amendment 0004 to Request for Proposal for the Life Cycle Product-line Management (LCPM) Procurement
- Solicitation number
- W900KK-17-R-0023
About this file
Track Changes of Para L.10.0
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L.10.0 FACTOR 5 – PAST PERFORMANCE (VOLUME III)
Offerors shall submit a list of eight (8)* Government and/or commercial contracts for the prime and each major subcontractors, in performance or awarded, during the past 3 years, from the issue date of this solicitation, which are relevant to the efforts required by this solicitation. Areas of relevancy include past performance (within the past 3 years) that is similar to cost, schedule, and performance requirements on programs in the context of LCPM efforts which includes tasks such as CTR, Hardware Obsolescence, Product-line Development, Product-line Management, Configuration Management, LT2 Participation, Model Based System Engineering, IA System Certification (
DIACAP/RMF), Army Live Collective/Individual Training and Training Systems (design, development, integration, fielding, testing, training, etc.). *Offerors are limited to a total of 8 contracts combined.
Contract data concerning the prime offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. At least one (1) relevant contract shall be submitted for each major subcontractor. Major subcontractor is defined as one who will be providing critical hardware/services or whose subcontracts are estimated to be cumulatively more than 10% of the total contract value over the life of the LCPM contract. The Government is not limited to Past Performance information submitted by offerors in conducting Past Performance evaluations.
The Government may consider a wide array of information from a variety of sources, but is not compelled to rely on all of the information available.
File details come from the government source that posted it. Updated .