QUALITY ASSURANCE AND SURVEILLANCE PLAN
For AFRIMS Project Management Entomology Support Services Contract Number: < upon award, enter contract number>
Contract Description: < enter contract description > Contractor’s name: < upon award, enter contractor name > (hereafter referred to as the contractor).
Contents
1. PURPOSE
2. GOVERNMENT ROLES AND RESPONSIBILITIES
3. CONTRACTOR REPRESENTATIVES
4. PERFORMANCE REQUIREMENTS SUMMARY MATRIX
5. METHODS OF SURVEILLANCE ...............................................…………………………………………...4
PERFORMANCE REPORT
CONTRACT DISCREPENCY REPORT (CDR)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored
• How monitoring will take place
• Who will conduct the monitoring; and
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type:
52.246-4 Inspection of Services – Fixed-Price
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned KO: Jennifer Jackson Organization or Agency: USAMRAA Telephone: (301) 619-2054 Email: jennifer.c.jackson18.civ@mail.mil
Contract Specialist (CS) - The CS acts as an acquisition consultant and serves as liaison between the contract office and Walter Reed Army Institute of Research (WRAIR).
Assigned CS: Jaclyn Svincek Organization or Agency: USAMRAA Telephone: 301-619-2189 Email: Jaclyn.p.svincek.civ@mail.mil
Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a “QASP and Performance” file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.
Assigned TBD mailto:jennifer.c.jackson18.civ@mail.mil mailto:Jaclyn.p.svincek.civ@mail.mil
Other Key Government Personnel - Title: Technical POC
TBD
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this
Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address> contract. <Communication should occur with them during QASP development. It will help if they review the draft QASP and accept the final version. You may delete the stated roles or change the naming convention if applicable. >
4. PERFORMANCE REQUIREMENTS SUMMARY MATRIX
# PWS
Ref.
Performance Objective
Performance Measurement
Acceptable Quality Level
Method of Surveillance Incentive
5.2
Holiday Calendar
Deliverable at the beginning of each task order, submitted complete and on-time
<Exceeds: >95%.
Meets: 94.5 – 90.0%.
Does Not Meet:
<89.9%>
Monitored via Remedy and After
Action Reports.
Frequency: within 30 days of task order or scientific project award
Past Performance
2, 6.2.A., 6.2.5a
Plans the beginning of each task order or scientific project award, submitted
Does Not Meet:
<89.9%>
Monitored via
Frequency:
Weekly
6.2.1a
Kickoff Meetings the beginning of each task order, agenda provided at least a week in advance and meeting notes within a week after the meeting
Exceeds - project starts one week early with budget, management, and control plans in place
Meets – Project starts project starts on-time with budget, management, and control plans in place Does not meet – meeting late or major questions unanswered
Past Performance
4 6.2.1b Routine calls
Deliverable monthly or
Exceeds- calls occur routine and facilitate
Monitored via Remedy and quarterly, agenda provided at least a week in advance and meeting notes within a week after the meeting discussion of science, and summary notes provided within 3-4 days of call
Meets- calls occur routinely, summary notes provided within one week of the call
After Action Reports.
Does not meet - calls not at specified frequency or scheduled so that entities are frequently unable attend, or summary notes not provided
5, 6, 7, 8
6.2.2c, 6.3 6.2.3a 6.2.4a, 6.2.4c
Reports, monthly
Deliverable monthly submitted complete and on-time
Exceeds – within first week of month, minimal Monitored via edits Remedy and
Meets – on time, with minimal edits
After Action Reports. Past
Performance Frequency:
Does not meet – past due Weekly OR major edits
6.2.4d
Reports, Quarterly
Deliverable quarterly submitted complete and on-time
Exceeds – within first week of month, understandable without edits
Meets – on time, with minimal edits
Does not meet – past due OR major edits
Remedy and
Past Performance
Final Exceeds – provided prior to Q6 if GEIS-funded or within last 30 days of project, minimal edits
Monitored via Past deliverable, Remedy and Performance
10 6.2.4e Final, data submitted After Action complete and Reports.
required, understandable without edits Meets – on time, with minimal edits for clarity and understanding
Does not meet – past due OR major edits OR data missing
6.2.5a
Specimen Managemen t and Sharing
Plan
Details that ensure that specimens are stored in the proper conditions;
ensure timely specimen shipments
Does Not Meet: <89.9%>
Monitored via Remedy and
Frequency: 45 Days after contract award
6.2.5.a.2
Complete Specimen Inventories
Details that ensure each collected specimen is assigned a unique identifier and that collection data is associated with the correct specimen.
Does Not Meet: <89.9%>
Monthly;
Complete inventory at project completion
6.2.9.a 6.2.10.a 6.2.11.a 6.2.12.a 6.2.13.a
Surveillance Plan
Deliverable at the beginning of each task order or scientific project award, submitted
Does Not Meet: <89.9%>
Monitored via Remedy and
Minimum 1 month before surveillance starts
6.2.9.h 6.2.10.i 6.2.11.j 6.2.12.i 6.2.13.j
Collected Biological Samples
Preservation and shipment of collected biological samples that are not processed in-country.
Does Not Meet: <89.9%>
Monitored via Remedy and
Weekly, Bi-weekly, Monthly, or Quarterly as specified in TO
6.3
Quality Control Plan
Final deliverable, submitted complete and on-time
At a minimum, the QCP must include a self-inspection plan, an internal staffing plan, and an outline of the procedures that the Contractor will use to maintain quality, timeliness, responsiveness, and customer satisfaction by meeting funder requirements and timelines specified in task orders.
FAR
52.204 -14
Service Contract Reporting Application
Final deliverable, submitted
The contractor shall complete and deliver the
SCRA
Monitored via Remedy and
6.3
CPAR
Concurrence /Non-concurrence
The contractor shall provide concurrence or non-concurrence with the
CPARS
The contractor shall provide concurrence or non-concurrence with the
CPARS assessment
Monitored via Remedy and assessment
18,
9.1 9.2
Transition in and out plans
As required for transitions, submitted complete and on-time
Exceeds- Provided at 60 days (30 day prior to initiation of 30 day transition, covers all major topics and provides best practices Meets- Provided at 45 days (30 day prior to initiation of 30 day transition, covers all major topics Does not meet- Provided at start of 30 days transition, incoming contractor has many questions after transition
Weekly.>
9.2n
Final report to be submitted with Transition-Out
Plan submitted complete and on-time
Exceeds – within first week of month, minimal edits Meets – on time, with minimal edits Does not meet – past due OR major edits OR data missing
< Monitored via Remedy and
11.2
Trip Reports
Submitted within 7 days of travel, submitted complete and on-time
Exceeds- early and no edits
Meets- on-time and minor edits
Does not meet- past due OR major edits
Monitored via Remedy and
14.1.2
OSHA
by February 1 of each year
Exceeds – 7 days early Meets-on time
Does not meet -late
Monitored via Remedy and
16.11.13
TARP
This training shall be completed within 60 calendar days after the contract award or after new employees commence performance, and annually thereafter.
Exceeds – 14 days early
Does not meet -late
16.12
InfoSec
Training shall be complete not later than 30 calendar days after contractor personnel begin performance under this contract and annually thereafter
Exceeds – 7 days
Does not meet -late
16.15
HIPAA
Within 30 days after contract award, and then annually thereafter for the remainder of the contract.
Exceeds – 7 days
Meets-on time Does not meet -late
Monitored via Remedy and
16.16.1
Cybersecurity/
Risk Management
Provides all security management deliverables on time [applicable for vendors
Meets: >99.9
<99.9%
Monitored via review of reports by Government-appointed third party specialist providing systems or devices]
Close discovered cybersecurity vulnerabilities
Close all discovered vulnerabilities or submit detailed explanations for inability to do so; provide vulnerability scan and SCAP scan results
[applicable for vendors providing
<99.9% review of reports and scan results by Government-appointed third party specialist
Monthly
Maintain Governmen t-approved cybersecuri ty policies, plans, and procedures documentati on
Obtain approval from
Government on all changes of cybersecurity policies, plans, and procedures [applicable for vendors providing
<99.9% review of reports by Government-appointed third party specialist
Annual
16.11.2
Installation Access -
Contractor shall follow installation access procedures.
Sum of all incidents in which contractor personnel did not follow installation
< 1 incident per month
Direct observation by COR and installation security.
access procedures
16.11.4 iWATCH Training - Contractor shall provide iWATCH training to all personnel within 30 calendar days of contract award.
(Sum of all contractor personnel who have completed iWATCH training within 30 calendar days of contract award) / (total number of contractor personnel supporting the contract)
>90%
Review of Training report from the contractor.
16.11.6
OPSEC
SOP –
Contractor shall submit
OPSEC SOP
that meets minimum quality standards.
Number of calendar days after contract award that the contractor submits the
OPSEC SOP
to the COR
< 90 calendar days after contract award
COR receipt of
OPSEC SOP
16.11.9
Informatio n
Assurance – Contractor information assurance workforce personnel are trained in accordance with DoD and Army
Number of calendar days after contract award in which the contractor submits training certifications for all personnel requirement information
< 30 calendar days
COR receipt of all certifications policy assurance training
PERFORMANCE REPORT
Contract Number: <insert number>
Prepared by: (Name of COR) <insert name>
Date and time of observation: <insert date>
Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results (Exceeds, Meets, Does Not Meet).
- Number of observations.>
Prepared by: <Enter COR’s name>
COR’s Signature Date
CONTRACT DEFICIENCY REPORT (CDR)
< The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.>
Contract Number: <insert number>
Contractor Project Manager: <insert name>
From: <insert name of COR>
Date and time observed discrepancy:
Contract Discrepancy:
<Describe in detail. Identify any attachments.>
Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The contractor shall provide the COR with the Corrective Action Plan not later than < # days after receipt of this CDR. >
Prepared by: <Enter COR’s name>
COR’s Signature Date
Received by: <Enter contractor project manager’s name>
Contractor Project Manager’s Signature Date
| 1. PURPOSE 1 |
| PERFORMANCE REPORT 12 |
| 1. PURPOSE |
| 2. GOVERNMENT ROLES AND RESPONSIBILITIES |
| 3. CONTRACTOR REPRESENTATIVES |
| 4. PERFORMANCE REQUIREMENTS SUMMARY MATRIX |
| Observation: |
| CONTRACT DEFICIENCY REPORT (CDR) |
| Date and time observed discrepancy: Contract Discrepancy: |
| Corrective action plan: |