Project Management Support for Armed Forces Research Institute of Medical Sciences (AFRIMS) Entomology
Solicitation number
W81XWH21R0057
Issued by

View the file

Other files

File Type Posted
B08-Attachment 12- Task Order 1 and 2 Pricing Table SAMPLE Revised 9 Mar 2022.xlsx XLSX spreadsheet
B08 Attachment 10 Example_TO_PM_4 Mar 2022 Final.pdf PDF
B08 Attachment 2 QASP 4 Mar 2022.pdf PDF
B08 Attachment 14 - Estimated Level of Effort Science Support Sample Task Order.pdf PDF
B08 Attachment 1-Revised PWS-PM Support for AFRIMS ENTO IDIQ Amendment 4 March 2022.pdf PDF
B08 Attachment 3 Pricing Amendment 0006 Mar_4_2022.xlsx XLSX spreadsheet
B08 Amendement 0006 to Solicitation W81XWH21R0057.pdf PDF
B08 Attachment 15 Responses to Questions round 2 Solicitation W81XWH21R0057 FINAL 7 Mar 2022.pdf PDF
B08 Attachment 13 - Estimated Level of Effort Program Management Sample Task Order.pdf PDF
B08 Attachment 11 Example_TO_Science_4 Mar 2022.pdf PDF
Attachment 10 Sample_TO_PM Amendment 0005.pdf PDF
Attachment 11 Sample_TO_Science Amendment 0005.pdf PDF
Attachment 1-Revised PWS-PM Support for AFRIMS ENTO IDIQ Amendment 0005.pdf PDF
W81XWH21R0057 Amendment 0005.pdf PDF
Attachment 2 QASP PM Support for AFRIMS ENTO IDIQ Revised Amendment 0005.pdf PDF
B08 Attachment 1-Revised PWS-PM Support for AFRIMS ENTO IDIQ.pdf PDF
B08-Attachment 6 Performance Assessment Questionnaire W81XWH21R0057.pdf PDF
B08 Attachment 3 Pricing Amendment 0004.xlsx XLSX spreadsheet
B08 W81XWH21R0057 Amendment 0004.pdf PDF
B08 Attachment 9 AFRIMS Entomology RFP QUESTIONS and Responses.pdf PDF
B08 Attachment 7 COVERED EMPLOYEE PARTICIPATION AGREEMENT.pdf PDF
Attachment 8 Labor Category Descriptions.pdf PDF
W81XWH21R0057 Amendment 0003.pdf PDF
W81XWH21R0057 Amendment 0002.pdf PDF
Attachment-6 Performance Assessment Questionnaire W81XWH21R0057.pdf PDF
W81XWH21R0057 Amendment 0001.pdf PDF
B08 W81XWH21R0057.pdf PDF
B08-1 PWS-PM Support for AFRIMS ENTO IDIQ FINAL.pdf PDF
B08-5 DD Form 1423 - CDRL.pdf PDF
B08-3 Attachment Pricing Sheet V2.xlsx XLSX spreadsheet
B08-4 DID DI-MISC-80508B Technical Report - Study - Services.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE AND SURVEILLANCE PLAN

For AFRIMS Project Management Entomology Support Services

Contract Number: < upon award, enter contract number>

Contract Description: < enter contract description >

Contractor’s name: < upon award, enter contractor name > (hereafter referred to as the contractor).

Contents

1. PURPOSE

2. GOVERNMENT ROLES AND RESPONSIBILITIES

3. CONTRACTOR REPRESENTATIVES

4. PERFORMANCE REQUIREMENTS SUMMARY MATRIX

5. METHODS OF SURVEILLANCE ................................................ Error! Bookmark not defined.

PERFORMANCE REPORT

CONTRACT DISCREPENCY REPORT (CDR)

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

What will be monitored

How monitoring will take place

Who will conduct the monitoring; and

How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the

QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the

Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

The following FAR clauses may apply depending on contract type:

52.246-4 Inspection of Services – Fixed-Price

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned KO: Jennifer Jackson

Organization or Agency: USAMRAA

Telephone: (301) 619-2054

Email: jennifer.c.jackson18.civ@mail.mil

Contract Specialist (CS) - The CS acts as an acquisition consultant and serves as liaison between the contract office and Walter Reed Army Institute of Research (WRAIR).

Assigned CS: Jaclyn Svincek

Organization or Agency: USAMRAA

Telephone: 301-619-2189

Email: Jaclyn.p.svincek.civ@mail.mil

Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a “QASP and

Performance” file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.

Assigned TBD mailto:jennifer.c.jackson18.civ@mail.mil

Other Key Government Personnel -

Title: Technical POC

TBD

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. <Communication should occur with them during QASP development. It will help if they review the draft

QASP and accept the final version. You may delete the stated roles or change the naming convention if applicable. >

Program Manager - <upon award, enter name>

Telephone: <enter number>

Email: <enter address>

Task Manager - <upon award, enter name>

Other Contractor Personnel - <upon award, enter name or delete these lines if not applicable>

Title: <enter title>

4. PERFORMANCE REQUIREMENTS SUMMARY MATRIX

PWS

Ref.

Performance

Objective Performance Measurement Acceptable Quality Level

Method of

Surveillance Incentive

1 5.2 Holiday Calendar

Deliverable at the beginning of each task order, submitted complete and on-time

<Exceeds: >95%.

Meets: 94.5 – 90.0%.

Does Not Meet: <89.9%>

Monitored via Remedy and After Action

Reports.

Frequency: within 30 days of task order or scientific project award

Past Performance

2, 6.2.A., 6.2.5a Plans

Deliverable at the beginning of each task order or scientific project award, submitted complete and on-time

<Exceeds: >95%.

Meets: 94.5 – 90.0%.

Does Not Meet: <89.9%>

Monitored via Remedy

Frequency: Weekly

Past Performance

3 6.2.1a Kickoff Meetings

Deliverable at the beginning of each task order, agenda provided at least a week in advance and meeting notes within a week after the meeting

Exceeds - project starts one week early with budget, management, and control plans in place

Meets – Project starts project starts on-time with budget, management, and control plans in place

Does not meet – meeting late or major questions unanswered

Monitored via Remedy

4 6.2.1b Routine calls

Deliverable monthly or quarterly, agenda provided at least a week in advance and meeting notes within a week after the meeting

Exceeds- calls occur routine and facilitate discussion of science, and summary notes provided within 3-4 days of call

Meets- calls occur routinely, summary notes provided within one week of the call

Does not meet - calls not at specified frequency or scheduled so that partners are frequently unable attend, or summary notes not provided

5, 6, 7, 8

6.2.2c, 6.3, 6.2.3a

6.2.4a, 6.2.4c

Reports, monthly Deliverable monthly submitted complete and on-time

Exceeds – within first week of month, minimal edits

Meets – on time, with minimal edits

Does not meet – past due OR major edits

Monitored via Remedy

9 6.2.4d Reports, Quarterly Deliverable quarterly submitted complete and on-time

Exceeds – within first week of month, understandable without

Meets – on time, with minimal

Does not meet – past due OR

Monitored via Remedy

10 6.2.4e Final, data Final deliverable, submitted complete and on-time

Exceeds – provided prior to Q6 if GEIS-funded or within last

30 days of project, minimal edits required, understandable without edits

Meets – on time, with minimal edits for clarity and understanding

Does not meet – past due OR major edits OR data missing

Monitored via Remedy

12 6.3 Quality Control

Plan

Final deliverable, submitted complete and on-time

At a minimum, the QCP must include a self-inspection plan, an internal staffing plan, and an outline of the procedures that the Contractor will use to maintain quality, timeliness, responsiveness, and customer satisfaction.

Monitored via Remedy

13 6.3

Service Contract

Reporting

Application

Final deliverable, submitted complete and on-time

The contractor shall complete and deliver the SCRA

Monitored via Remedy

14 6.3

CPAR

Concurrence/Non-concurrence

The contractor shall provide concurrence or non-concurrence with the CPARS assessment

The contractor shall provide concurrence or non-concurrence with the CPARS assessment

Monitored via Remedy

15, 9.1

9.2

Transition in and out plans

As required for transitions, submitted complete and on-time

Exceeds- Provided at 60 days

(30 day prior to initiation of 30 day transition, covers all major topics and provides best practices

Meets- Provided at 45 days

(30 day prior to initiation of 30 day transition, covers all major topics

Does not meet- Provided at start of 30 days transition, incoming contractor has many questions after transition

Frequency: Weekly.>

17 9.2 Final report to be submitted with Transition-Out

Plan submitted complete and on-time

Exceeds – within first week of month, minimal edits

Meets – on time, with minimal edits

Does not meet – past due OR major edits OR data missing

< Monitored via

Remedy and After

Action Reports.

18 11.2 Trip Reports Submitted within 7 days of travel, submitted complete and on-time

Exceeds- early and no edits

Meets- on-time and minor edits

Does not meet- past due OR

19 14.1.2 OSHA by February 1 of each year

Exceeds – 7 days early

Meets-on time

Does not meet -late

Monitored via Remedy

16.11.1

TARP

This training shall be completed within 60 calendar days after the contract award or after new employees commence performance, and annually thereafter.

Exceeds – 14 days early

Meets-on time

Does not meet -late

Monitored via Remedy

21 16.12 InfoSec

Training shall be complete not later than 30 calendar days after contractor personnel begin performance under this contract and annually thereafter

Exceeds – 7 days early

Meets-on time

Does not meet -late

Monitored via Remedy

22 16.15 HIPAA

Within 30 days after contract award, and then annually thereafter for the remainder of the contract.

Exceeds – 7 days early

Meets-on time

Does not meet -late

< Monitored via

Remedy and After

Action Reports.

23 16.18

Continuous

Cybersecurity

Risk

Management

Provides all security management deliverables on time [applicable for vendors providing systems or devices]

Meets: >99.9

Does Not Meet: <99.9%

Monitored via review of reports by

Government-appointed third party specialist

Frequency: Weekly

Past Performance

24 16.18 Close discovered cybersecurity vulnerabilities

Close all discovered vulnerabilities or submit detailed explanations for inability to do so; provide vulnerability scan and SCAP scan results [applicable for vendors providing systems or devices]

Meets: >99.9

Does Not Meet: <99.9%

Monitored via review of reports and scan results by Government-appointed third party specialist

Frequency: Monthly

25 16.18

Maintain

Government-approved cybersecurity policies, plans, and procedures documentation

Obtain approval from Government on all changes of cybersecurity policies, plans, and procedures [applicable for vendors providing systems or devices]

Meets: >99.9

Does Not Meet: <99.9%

Monitored via review of reports by

Government-appointed third party specialist

Frequency: Annual

26 16.11.2

Installation

Access -

Contractor shall follow installation access procedures.

Sum of all incidents in which contractor personnel did not follow installation access procedures

< 1 incident per month

Direct observation by

COR and installation security.

27 16.11.4 iWATCH

Training -

Contractor shall provide iWATCH training to all personnel within

30 calendar days of contract award.

(Sum of all contractor personnel who have completed iWATCH training within 30 calendar days of contract award) / (total number of contractor personnel supporting the contract)

>90%

Review of Training report from the contractor.

Past Performance

16.11.1

OPSEC SOP –

Contractor shall submit OPSEC

SOP that meets minimum quality standards.

Number of calendar days after contract award that the contractor submits the OPSEC SOP to the COR

< 90 calendar days after contract award

COR receipt of OPSEC

SOP

Past Performance

29 16.11.9

Information

Assurance –

Contractor information assurance workforce personnel are trained in accordance with

DoD and Army policy

Number of calendar days after contract award in which the contractor submits training certifications for all personnel requirement information assurance training

< 30 calendar days COR receipt of all certifications

PERFORMANCE REPORT

Contract Number: <insert number>

Prepared by: (Name of COR) <insert name>

Date and time of observation: <insert date>

Observation:

<Examples of items to include in a report are:

- Method of surveillance.

- How frequently you conducted surveillance.

- Surveillance results (Exceeds, Meets, Does Not Meet).

- Number of observations.>

Prepared by: <Enter COR’s name>

COR’s Signature Date

CONTRACT DEFICIENCY REPORT (CDR)

< The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.>

Contract Number: <insert number>

Contractor Project Manager: <insert name>

From: <insert name of COR>

Date and time observed discrepancy:

Contract Discrepancy:

<Describe in detail. Identify any attachments.>

Corrective action plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The contractor shall provide the COR with the Corrective Action Plan not later than < # days after receipt of this CDR. >

Prepared by: <Enter COR’s name>

COR’s Signature Date

Received by: <Enter contractor project manager’s name>

Contractor Project Manager’s Signature Date