This document is an amendment to a solicitation for repairs to an air traffic control tower at Al Asad Air Base in Iraq. The Army Corps of Engineers issued Amendment 0003 to answer bidder inquiries, close out questions in the system, and clarify that the scope of work includes replacing the roof top central air conditioning unit and all restroom exhaust systems on the third and fifth floors with ductless split systems. Photographs depict existing conditions and the incumbent unit makes and models listed are for reference only. Bidders must acknowledge all three amendments when submitting proposals through the PIEE system by the specified date.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reson for Amendment 0003 is to:
1. Answ er bidder inquiries.
2. Close out Bidder Inquiries in ProjNet.
3. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W5J9JE23R0010
X 9B. DATED (SEE ITEM 11)
13-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Aug-2023
CODE
USACE TRANSATLANTIC AFGHANISTAN DISTRICT
CETAA-CT, USACE TAA HQ BAF, BAGRAM
APO AE 09354
W5J9JE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W5J9JE23R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
BIDDER INQUIRIES
Bidder Inquiries:
10389155:
Question - Please send us more specific instructions on how the proposal will be submitted on piee.eb. mil.
Government Response - Please see documents “Solicitation Manager Role in PIEE” and “Posting Offeror in PIEE” included in AM03.
10393602:
Question - Please confirm, per section 01 10 00 SOW part 3 Tower 3rd and 5th floor, only ductless split system for rooms and exhaust system restroom will be replaced/ provided Government Response - Yes, the contractor shall install ductless split units to provide adequate cooling/heating for the 3rd and 5th floors in addition to the replacement of the roof top central unit. The Contractor shall replace all exhaust systems in the restrooms.
10393603:
Question - Please confirm, refer to section 01 10 00 SOW part 3.2.3 it is assumed the intent is to run new plumbing risers within the interior building stairway to 3rd floor.
Government Response - Yes install all necessary piping to provide adequate water pressure to the upper floors.
10394371:
Question - 1. you have asked to submit the proposal via PIEE.
I suggest either, make the submissio n via email or give training , step by step how to make registra tion in PIEE, we have tried but we couldn't select the Role and LOCATION CODE/CAG E.
2. The HVAC to be replaced in the photo that attached in Appendix B refers to CARRIER brand while you mentione d in the ammendme nt 0002 it is YORK brand, may you confirm the brand please.< br /> Government Response – 1. Please see documents “Solicitation Manager Role in PIEE” and “Posting Offeror in PIEE” included in AM03. If any other questions arise, please email Eugenia Corder at eugeina.j.corder@usace.army.mil or Richard Bonnell at richard.w.bonnell@usace.army.mil.
2. Photos in Appendix B are to show exisiting conditons. The CARRIER Brand Unit shall be demolished and not replaced. The photos of the YORK Brand HVAC Unit submitted in Amendment 0002 shall be replaced with a new unit which doesn't necessarily have to be YORK brand.
Please Acknowledge the three (3) Amendments when sending proposals to PIEE by signing and attaching them to your proposal.
All other sections of this solicitation remain unchanged.
(End of Summary of Changes)