This document is an appendix providing existing conditions of an air traffic control tower at Al Asad Air Base in Iraq. It details the current state of various areas and equipment within the tower building including exterior structures, floors, walls, hvac systems, electrical components, plumbing, restrooms, and the control tower. Deficiencies are noted such as damaged ceiling tiles, water leaks, and non-functioning equipment.
The related federal contract opportunity is a solicitation from the Department of the Army Corps of Engineers seeking repairs to the air traffic control tower at Al Asad Air Base. Offerors are invited to submit proposals to address the deficiencies identified in the appendix through repairs and replacement of damaged structures, hvac systems, electrical systems, plumbing fixtures, and other areas within the tower building and surrounding facilities. The opportunity aims to restore the tower and its systems to proper working order to support air traffic control operations at the base.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX
AAAB Air Traffic Control Tower – Existing Conditions
Exterior of Building
Central Air Conditioning Unit
Air Conditioning Unit Ductwork
Main Building (Floor 1)
Steel Door Glass Doors
Split-Pack Unit Drop Ceiling
Covered Windows Temporary Wall
Drop Ceiling Window A/C Unit
Electrical Outlets Wooden Door
Damaged Ceiling Tiles Window A/C Unit
Covered Door Louvers Covered Window + A/C Unit
Floors and Walls Steel Exterior Doors
A/C Unit Corridor Windows
Electrical/Server Room Equipment
Electrical Panels Living Area
Exercise Room Damaged Lighting Fixture
Water Heater Conference Room
Corridor Men’s Restroom Entrance
Water Heater Lavatories
Urinals Washer + Dryer
Restroom Stalls Toilet
Shower Curtain Shower
Restroom Entrance Exposed Ductwork/Piping
Lavatories Toilet
Shower Stall Unit Heater
Damaged Ceiling Tiles
Tower (Floor 3)
Plumbing Piping in Stairway Covered Equipment in Stairway
Covered Ceiling Tile Covered Windows
Water Heater Toilet
Urinal Covered Exhaust Fan
Lavatory Water Pump Switch
Carpet A/C Unit
Covered/Damaged Ceiling Tiles
Covered/Leaking Windows Leaking Pipe Above Ceiling
Water Leaking from Ceiling Carpet Tiles
A/C Unit Covered Windows
Ductwork in Server Room Electrical Panels
Living Area A/C Unit + Covered Window
Tower (Floor 5)
HVAC Equipment on Catwalk
A/C Condensing Unit
Stairway Electrical Outlets
Damaged Drop Ceiling Work Area
A/C Unit Electrical Panel
Damaged Flooring
File details come from the government source that posted it. Updated .