This document is an amendment to a solicitation for repairs to an air traffic control tower at Al Asad Air Base in Iraq. The amendment extends the proposal due date from August 13th to August 20th, 2023 at 4:00 PM and provides responses to bidder inquiries. Key details include: the Department of the Army Corps of Engineers as the contracting agency; a requirement for a 200kW backup generator, ductless split air conditioning units, and ductwork for the tower; clarification that a project manager can also serve as superintendent and that separate safety staff are needed; and confirmation that performance and payment bonds are required but that a defense base act is not.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to:
1. Answ er Bidder Inquiries.
2. Extend Proposal due date from 13 August 2023 to 20 August 2023.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W5J9JE23R0010
X 9B. DATED (SEE ITEM 11)
13-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2023
CODE
USACE TRANSATLANTIC AFGHANISTAN DISTRICT
CETAA-CT, USACE TAA HQ BAF, BAGRAM
APO AE 09354
W5J9JE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W5J9JE23R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
BIDDER INQUIRIES
The reason for Amendment 0002 is to answer the following bidder inquiries:
Inquiry ID: 10367954
Question: Regarding the bid guarantee: (c) The bid guarantee amount must be 20% percent of the bid price or $1,000,000, whichever is less: Does this imply that we must have the bid guarantee amount (20% of the bid price or $1,000,000, whichever is less) available before being awarded the contract?
Also, is this requirement limited to documentation, or must the bid guarantee amount be readily available in our bank account beforehand? The specified amount seems substantial, and I also noticed that the value of the contract (order of magnitude) is not mentioned anywhere in the entire solicitation.
Government Response: Construction Magnitude was updated in Amendment 0001 with Bidder Inquiry ID 10350246. Bid guarantee amount must be 20% percent of the bid price or $1,000,000.00, whichever is less within 10 days after time of award.
Inquiry ID: 10378864
Question: Will the KO issue a conformed copy of the solicitation to reflect the changes in Amendment 0001?
Government Response: No. All amendments are sent out with just the changes in the solicitation, not a conformed copy.
Inquiry ID: 10380098
Question: In the section 01 10 00 page 7, the following is mentioned:
1 - (a. Provide new central package air conditioning and air handling unit of equal capacity and function to the existing unit.)- What is the existing capacity for the central package air conditioning and air handling unit?
2 – (b. Provide new rigid insulated ductwork and balancing from the package central air conditioning unit into the building interior. Interior ductwork shall remain in place.)- What is the quantities of the required rigid insulated ductwork?
Government Response:
1 - There is currently a Clima Rock York Packaged A/C Unit with 31 kW (Cooling); 32.3 kW (Heating), 400V/3 Phase/50 Hz on the rooftop of the tower. This can be replaced with a 15 Ton (Cooling); 15 Ton (Heating), 400V/3 Phase/50 Hz Packaged A/C Unit. See attached photos for existing unit.
2 – This is to be determined by the contractor. All ductwork is currently above the ceiling tiles throughout the tower.
Inquiry ID: 10382635
Question: We would like to request a two week extension of the proposal due date so that we can continue to work with suppliers and subcontractors to provide USACE the most competitive pricing.
Government Response: A one week extension will be granted with a new proposal due date of 20 Aug 2023.
Inquiry ID: 10384045
Question: Please confirm DBA insurance is not required.
Government Response: According to the solicitation in Block 12, Payment and Performance Bonds are required. Please refer to FAR Clause 52.228-15 and FAR Clause 52.228-14.
Inquiry ID: 10384052
Question: Please confirm if a mancamp will be permitted on base for expat skilled labor and management personnel and if access to the base dining facility will be permitted.
Government Response: Mancamps and access to the base dining facility are not permitted.
Inquiry ID: 10384061
Question: Please confirm Special Inspectors and a SIOR are not required on this project.
Government Response: Confirmed.
Inquiry ID: 10384483
Question: This project requires a separate PM, Superintendent, CQCSM, and SSHO along with their alternates.
This requirement would severely burden the overhead on a $1M project. Please consider two positions PM/Superintendent and CQCSM/SS HO along with an alternate. This has been utilized effectively on other USACE projects with similar budgets.
Government Response: PM/Superintendent can be the same person. CQCSM/SSHO needs to be two separate people.
Inquiry ID: 10384524
Question: Sheet A-101A shows demolition floor plan and new floor plan drawings for restroom but the information doesn't indicate where these restrooms, are they in floor 1 or floor 3?
Government Response: The restrooms are both on Floor 1 and Floor 3. Please refer to the specific restroom drawing sheets that are called out on both Sheet A-101, which is A-101A, for Floor 1 and Sheet A-102, which is A-102A, for Floor 3.
Inquiry ID: 10384569
Question: Can you provide us the existing electrical blue print? Please can you confirm the total square foot for the celling?
Government Response: We do not have an electrical blueprint. Section 01 10 00, Para. 2.5 states "The Contractor must submit shop drawings and calculations showing the components and system that meets the requirements of this Statement of Work, the Appendix Drawings, and Section 01 10 15 TECHNICAL
REQUIREMENTS."
Inquiry ID: 10385050
Question:
1-Referring to the scope of work 2.5 Electrical Distribution System a, One (1) 20kW prime generator Can you confirm if Generator 20kW or 200kW. As the drawing showing it is 250 kVA.
2- referring to the scope of work 2.6 HVAC System a. Provision and installing new HVAC system c.
Provide new rigid insulated ductwork May we know this system for which part of the building? Because when we refer to the main building scope of work 3.1.1 a. Provide new ductless package. So what is the duct work for? What is the current HVAC package capacity?
Government Response:
1- One (1) 20 kW prime generator is a misprint. It should read "One (1) 200kW prime generator.
2- The ductwork will only be in the tower coming from the rooftop A/C Unit. All other rooms will need Ductless Split A/C Units installed. As stated in the drawings, KEYNOTE 5: "PROVIDE MINI SPLIT
SYSTEM IN ROOM FOR COOLING/HEATING. CONTRACTOR TO VERIFY SPLIT SYSTEM
QUANTITY AND CAPACITY PER ROOM," except for the control room which states in Section 01 10 00, Para. 3.1.3: "Provide two (2) new split system heat pump units in the control room."
End of Bidder Inquiries with Amendment 0002.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 13-Aug-2023 04:00 PM to 20-Aug-2023 04:00 PM.
SECTION 00 72 00 - GENERAL CONDITIONS
The following were previously included by reference and are now included by full text:
52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)
(a) Definitions. As used in this clause--
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause)