PRICE SCHEDULE
FOR INFORMATION ONLY – NOT THE FINAL VERSION
RFP W5J9JE-18-R-0006
SECTION J – ATTACHMENT 1
ANA-18-064 Camp John Pratt
Mazar-e-Sharif, Balkh, Afghanistan
Item DESCRIPTION Quantity Unit Unit Price Extended Amount
BASE LINE ITEMS
0001 Mobilization 1 JOB
0002 Security 1 JOB
0003 Survey 1 JOB
Architectural and Engineering Design
1 JOB
0005 As-Built Drawings 1 JOB
0006 Demolition 1 JOB
0007 Clearing and Grubbing 1 JOB
0008 Site Grading and drainage 1 JOB
0009 Existing Road Maintenance 1 JOB
0010 New Roads 1 JOB
0011 Concrete Sidewalks 1 JOB
0012 Aggregate Sidewalks 1 JOB
0013 Water Well 2 EA
Water Distribution and Water Storage System
1 JOB
Wastewater Collection System
1 JOB
0016 Power Plant 1 JOB
0017 Electrical Distribution 1 JOB
0018 Perimeter Fence 1 JOB
0019 Entry Control Point (ECP) 2 EA
0020 B03-Officers Barracks 4 EA
0021 B04-NCO Barracks 7 EA
Item DESCRIPTION Estimated Quantity
Unit Unit Price Estimated Amount
CL01-Student Classroom Building
5 EA
0023 L02-Latrine 2 EA
0024 MS02-Laundry Building 5 EA
0025 S03-Small Arms Storage 3 EA
0026 D02-DFAC 1 JOB
0027 MS01-Medical Clinic 1 JOB
AD04-Headquarters Building
3 EA
Tactical Operations Center
(TOC)
1 JOB
0030 B25a-Barracks-Medium 4 EA
0031 MS03-Fitness Center 1 JOB
0032 S01-Storage 3 EA
0033 Motor Pool 1 JOB
VM03-Fuel Storage and Vehicle Refueling Point
1 JOB
0035 VM01-Logistics Building 1 JOB
0036 VM06-POL Storage 1 JOB
VM02-Vehicle Maintenance Facility
1 JOB
0038 D05-DFAC 1 JOB
0039 Ammo Supply Point (ASP) 1 JOB
0040 Demobilization 1 JOB
BASE ITEMS TOTAL:
OPTION LINE ITEMS
0041 Option MS11-Fire Station 1 JOB
MS14-Option Fires Station Water Supply System
1 JOB
OPTION ITEMS TOTAL:
BASE + OPTION ITEMS TOTAL:
NOTE 1: Award will be made as a whole (meaning all line items) to only one (1) offeror.
NOTE 2: Offerors shall furnish unit prices for each item listed in the above Schedule. If the offeror fails to insert a unit price in the appropriate blank for any of the line items above, but furnishes an extended total, the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity.
IF AN OFFEROR OMITS BOTH THE UNIT PRICE AND THE EXTENDED TOTAL FOR
ANY ITEM, ITS OVERALL OFFER SHALL BE DECLARED INELIGIBLE FOR AWARD.
NOTE 3: Any offer may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the price proposal, but also the extended price for individual line items.
NOTE 4: The Option Line Items may be exercised at time of contract award or at any time no later than 270 days from contract award.
NOTE 5: The unit “JOB” as used in this Price Schedule is synonymous with the term “Lump Sum.”
NOTE 6: The offeror’s Cost/Price Breakdown Spreadsheet shall contain costs, rates and data that align with, and support, the unit and extended prices shown above in the offeror’s Price Schedule.
NOTE 7: This Price Schedule is for information purposes only during Phase 1. The final version will be provided in the Phase 2 solicitation. **Be advised the Government may add additional line items to the final version of this Price Schedule.
File details come from the government source that posted it.