PRICE SCHEDULE

FOR INFORMATION ONLY – NOT THE FINAL VERSION

RFP W5J9JE-18-R-0006

SECTION J – ATTACHMENT 1

ANA-18-064 Camp John Pratt

Mazar-e-Sharif, Balkh, Afghanistan

Item DESCRIPTION Quantity Unit Unit Price Extended Amount

BASE LINE ITEMS

0001 Mobilization 1 JOB

0002 Security 1 JOB

0003 Survey 1 JOB

Architectural and Engineering Design

1 JOB

0005 As-Built Drawings 1 JOB

0006 Demolition 1 JOB

0007 Clearing and Grubbing 1 JOB

0008 Site Grading and Drainage 1 JOB

0009 Existing Road Maintenance 1 JOB

0010 New Roads 1 JOB

0011 Concrete Sidewalks 1 JOB

0012 Aggregate Sidewalks 1 JOB

0013 Water Wells 2 EA

Water Storage and Distribution System

1 JOB

0015 WWTP 1 JOB

0016 WWTP Control Building 1 JOB

Wastewater Collection System

1 JOB

Power Generation and Plant

1 JOB

Electrical Distribution System

1 JOB

0020 Perimeter Fence 1 JOB

0021 Entry Control Point (ECP) 2 EA

Item DESCRIPTION Estimated Quantity

Unit Unit Price Estimated Amount

0022 B03-Officers Barracks 4 EA

0023 B04-NCO Barracks 7 EA

CL01-Student Classroom Building

5 EA

0025 L02-Latrine 2 EA

0026 MS02-Laundry Building 5 EA

0027 S03-Small Arms Storage 3 EA

0028 D02-DFAC 1 JOB

0029 MS01-Medical Clinic 1 JOB

AD04-Headquarters

Building

3 EA

Tactical Operations Center

(TOC)

1 JOB

0032 B25a-Barracks-Medium 4 EA

0033 MS03-Fitness Center 1 JOB

0034 S01-Storage 3 EA

0035 Motor Pool 1 JOB

VM03-Fuel Storage and Vehicle Refueling Point

1 JOB

VM02-Vehicle Maintenance Facility

1 JOB

0038 VM06-POL Storage 1 JOB

0039 VM01-Logistics Building 1 JOB

0040 Fire Station 1 JOB

MS14-Fire Station Water Supply System

1 JOB

0042 Ammo Supply Point (ASP) 1 JOB

0043 Demobilization 1 JOB

BASE ITEMS TOTAL:

OPTION LINE ITEMS

0044 Option FFE Package 1 1 JOB

0045 Option FFE Package 2 1 JOB

OPTION ITEMS TOTAL:

BASE + OPTION ITEMS TOTAL:

NOTE 1: Award will be made as a whole (meaning all line items) to only one (1) offeror.

NOTE 2: Offerors shall furnish unit prices for each item listed in the above Schedule. If the offeror fails to insert a unit price in the appropriate blank for any of the line items above, but furnishes an extended total, the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity.

IF AN OFFEROR OMITS BOTH THE UNIT PRICE AND THE EXTENDED TOTAL FOR

ANY ITEM, ITS OVERALL OFFER SHALL BE DECLARED INELIGIBLE FOR AWARD.

NOTE 3: Any offer may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the price proposal, but also the extended price for individual line items.

NOTE 4: The Option Line Items may be exercised at time of contract award or at any time no later than 270 days from contract award.

NOTE 5: The unit “JOB” as used in this Price Schedule is synonymous with the term “Lump Sum.”

NOTE 6: The offeror’s Cost/Price Breakdown Spreadsheet shall contain costs, rates and data that align with, and support, the unit and extended prices shown above in the offeror’s Price Schedule.

NOTE 7: This Price Schedule is for information purposes only during Phase 1. The final version will be provided in the Phase 2 solicitation. **Be advised the Government may add additional line items to the final version of this Price Schedule.

(Revision 13 March 2018)

File details come from the government source that posted it.