Exhibit A.pdf
PDF 301 KB Posted
- Attached to
- Solicitation AFM III East & West
- Solicitation number
- W58RGZ-26-R-0008
About this file
This document is a PDF viewer error message, not a federal contract opportunity file. The document contains only technical instructions for upgrading Adobe Reader software and troubleshooting guidance for displaying PDF content. No contract information, solicitation details, products, services, timelines, pricing, or agency details are present in this file.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024
Page of
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024
Page of
CONTRACT DATA REQUIREMENTS LIST
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES Draft Final Reg Repro
16. REMARKS
14. DISTRIBUTION
15.TOTAL
Image of arrow pointing towards totals
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"
| CurrentPage: |
| PageCount: |
| Select Classification from drop-down list.: 1 |
| CUI Indicator Information: |
| Click on this button to attach a file(s).: |
| A. CONTRACT LINE ITEM NUMBER: |
| exhibit: A |
| C. CATEGORY: Select for "TDP.": 0 |
| C. CATEGORY: Select for "TM.": 0 |
| C. CATEGORY: Select for "OTHER.": 0 |
| C. CATEGORY: Enter specification for "Other.": |
| System: |
| ContractNum: W58RGZ-26-R-0008 |
| Contractor: |
| 1. DATA ITEM NUMBER: A001 |
| 1. DATA ITEM NUMBER: A002 |
| 1. DATA ITEM NUMBER: A003 |
| 1. DATA ITEM NUMBER: A004 |
| 1. DATA ITEM NUMBER: A005 |
| 1. DATA ITEM NUMBER: A006 |
| 1. DATA ITEM NUMBER: A007 |
| 1. DATA ITEM NUMBER: A008 |
| 1. DATA ITEM NUMBER: A009 |
| 1. DATA ITEM NUMBER: A010 |
| 1. DATA ITEM NUMBER: A011 |
| 1. DATA ITEM NUMBER: A012 |
| 1. DATA ITEM NUMBER: A013 |
| 1. DATA ITEM NUMBER: A014 |
| 1. DATA ITEM NUMBER: A015 |
| 1. DATA ITEM NUMBER: A016 |
| 1. DATA ITEM NUMBER: A017 |
| 1. DATA ITEM NUMBER: A018 |
| 1. DATA ITEM NUMBER: A019 |
| 1. DATA ITEM NUMBER: A020 |
| 1. DATA ITEM NUMBER: A021 |
| 1. DATA ITEM NUMBER: A022 |
| 1. DATA ITEM NUMBER: A023 |
| 1. DATA ITEM NUMBER: A024 |
| 1. DATA ITEM NUMBER: A025 |
| 1. DATA ITEM NUMBER: A026 |
| 1. DATA ITEM NUMBER: A027 |
| 1. DATA ITEM NUMBER: A028 |
| 1. DATA ITEM NUMBER: A029 |
| 1. DATA ITEM NUMBER: A030 |
| 1. DATA ITEM NUMBER: A031 |
| 1. DATA ITEM NUMBER: A032 |
| 1. DATA ITEM NUMBER: A033 |
| 1. DATA ITEM NUMBER: A034 |
| 1. DATA ITEM NUMBER: A035 |
| 1. DATA ITEM NUMBER: A036 |
| 1. DATA ITEM NUMBER: A037 |
| 1. DATA ITEM NUMBER: A038 |
| titleDataItem: Integrated Program Management Data and Analysis Report |
| titleDataItem: Personnel Report |
| titleDataItem: Management Plan |
| titleDataItem: Management Plan |
| titleDataItem: Management Plan |
| titleDataItem: Management Plan |
| titleDataItem: Management Plan |
| titleDataItem: Management Plan |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Management Plan |
| titleDataItem: Accident/Incident Report |
| titleDataItem: Quality Assurance Program Plan |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Physical Inventories Report |
| titleDataItem: Physical Inventories Report |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Purchase Order and Supplier Surveillance Data |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Facilities Maintenance Report |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Data Accession List (DAL) |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Technical Report - Study/Services |
| titleDataItem: Funds and Man-Hours Expenditure Report |
| subtitle: Contractor Performance & EVM Report |
| subtitle: Contractor Personnel & Manning |
| subtitle: Flight & Ground Operating Procedures (FOP/GOP) |
| subtitle: Contractor Management Plan (CMP) |
| subtitle: Property Control Plan |
| subtitle: Transition In/Out Plan |
| subtitle: Labor Strike Plan |
| subtitle: Industrial Hygiene Plan |
| subtitle: Industrial Hygiene Monitoring Data |
| subtitle: Sexual Assault/Harassment Training Plan |
| subtitle: Sexual Assualt/Harassment Incident Report |
| subtitle: QAPP |
| subtitle: Production Information Report (PIR) |
| subtitle: Monthly Cyclic Inventory of GFP |
| subtitle: Sensitive Item Inventory of GFP |
| subtitle: Causative Research |
| subtitle: Accident/Incident Report |
| subtitle: LDDT Investigation Packet |
| subtitle: GFP Listing |
| subtitle: Material/Non-Material Purchase Request |
| subtitle: Material/Non-Material Support Fund |
| subtitle: Equipment and Facilities Report |
| subtitle: QMS Metrics |
| subtitle: Request and Justification for Weekend/Holiday/Overtime |
| subtitle: Program Management Review |
| subtitle: Currency Report |
| subtitle: MWO Kit Inventory |
| subtitle: Aircraft Work Order Close-Out Package |
| subtitle: Activity Cost Estimation Form (ACEF) |
| subtitle: Certificate of Service Report |
| subtitle: Funding/Over-Cost Notification Letter |
| subtitle: DAL Supplement |
| subtitle: Data Accession List (DAL) |
| subtitle: List of Small Business Subcontractors |
| subtitle: Safe De-obligation Request Package |
| subtitle: Travel Log |
| subtitle: Incidental Property Listing |
| subtitle: eCRAFT Periodic Report Utility |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-81861 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-81419 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-80004 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-80004 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-80004 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-80004 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-80004 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-80004 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-80004 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-SAFT-81563 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-QCIC-81794 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-80259 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-80259 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-81616 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-81423 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-81453 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MISC-80508 |
| 4. AUTHORITY (Data Acquisition Document Number): DI-FNCL-80331A |
| contractRef: 3.1.4.4 |
| contractRef: PWS 2.6.10 & 3.1.5.6 |
| contractRef: PWS 3.1.3 |
| contractRef: PWS 2.5.1 |
| contractRef: PWS 3.1.7.1 |
| contractRef: PWS 4.5 |
| contractRef: PWS 2.6.4 |
| contractRef: PWS 3.1.5.8 & 4.3.10.3 |
| contractRef: PWS 3.1.5.9 & 4.3.10.5 |
| contractRef: PWS 2.8.9 |
| contractRef: PWS 2.8.9 |
| contractRef: PWS 4.6.3 |
| contractRef: PWS 3.1.5.2 |
| contractRef: PWS 3.1.7.4.2 |
| contractRef: PWS 3.1.7.4.3 |
| contractRef: PWS 3.2.2.1.3 |
| contractRef: PWS 4.2.4 |
| contractRef: PWS 3.1.7.5 |
| contractRef: PWS 3.1.7.3 |
| contractRef: PWS 3.1.9.1 |
| contractRef: PWS 3.1.5.5 |
| contractRef: PWS 3.1.5.3. & 3.1.7.6 |
| contractRef: PWS 4.6.3 |
| contractRef: PWS 2.6.7 |
| contractRef: PWS 2.4 & 3.1.8 |
| contractRef: PWS 3.1.5.7 |
| contractRef: PWS 3.2.3.2.3.2 |
| contractRef: PWS 3.2.1 |
| contractRef: PWS 3.1.4.1 |
| contractRef: PWS 3.1.5.1 |
| contractRef: PWS 3.1.5.4 |
| contractRef: PWS 2.11 |
| contractRef: PWS 2.11 |
| contractRef: PWS 2.6.2.1 |
| contractRef: PWS 3.1.5.10 |
| contractRef: PWS 2.10.1.4 |
| contractRef: PWS 3.1.7.7.2. |
| contractRef: PWS 3.1.4.5 |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| reqOffice: AMAM-LF |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 7. DD 250 REQUIREMENT: LT |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : A |
| 8. APPROVAL CODE : A |
| 8. APPROVAL CODE : A |
| 8. APPROVAL CODE : A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : A |
| 8. APPROVAL CODE : A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 8. APPROVAL CODE : N/A |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| 9. DISTRIBUTION STATEMENT REQUIRED: E |
| freq: MTHLY |
| freq: WEKLY |
| freq: ONE/R |
| freq: ONE/R |
| freq: ONE/R |
| freq: R/ASR |
| freq: R/ASR |
| freq: R/ANNLY |
| freq: ASREQ |
| freq: ASREQ |
| freq: ASREQ |
| freq: R/ASR |
| freq: ASREQ |
| freq: MTHLY |
| freq: MTHLY |
| freq: ASREQ |
| freq: ASREQ |
| freq: ASREQ |
| freq: SEMIA |
| freq: ASREQ |
| freq: WEKLY |
| freq: MTHLY |
| freq: MTHLY |
| freq: ASREQ |
| freq: SEMIA |
| freq: MTHLY |
| freq: WEKLY |
| freq: ASREQ |
| freq: ASREQ |
| freq: WEKLY |
| freq: ASREQ |
| freq: ASREQ |
| freq: ANNLY |
| freq: QRTLY |
| freq: ASREQ |
| freq: MTHLY |
| freq: BI-ANNLY |
| freq: ASREQ |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| asOfDate: N/A |
| dateFirstSub: SEE ITEM 16 |
| dateFirstSub: 30DAC |
| dateFirstSub: 60DAC |
| dateFirstSub: 10DAC |
| dateFirstSub: 10DAC |
| dateFirstSub: 5DAC |
| dateFirstSub: 30 DAC |
| dateFirstSub: 30DAC |
| dateFirstSub: ASREQ |
| dateFirstSub: 30 DAC |
| dateFirstSub: SEE ITEM 16 |
| dateFirstSub: 30DAC |
| dateFirstSub: 30DAC |
| dateFirstSub: 30 DAC |
| dateFirstSub: ASREQ |
| dateFirstSub: ASREQ |
| dateFirstSub: ASREQ |
| dateFirstSub: 90DAC |
| dateFirstSub: ASREQ |
| dateFirstSub: 30 DAC |
| dateFirstSub: 30DAC |
| dateFirstSub: 60 DAC |
| dateFirstSub: ASREQ |
| dateFirstSub: SEE ITEM 16 |
| dateFirstSub: 30DAC |
| dateFirstSub: SEE ITEM 16 |
| dateFirstSub: ASREQ |
| dateFirstSub: ASREQ |
| dateFirstSub: 2DARP |
| dateFirstSub: SEE ITEM 16 |
| dateFirstSub: 30DAC |
| dateFirstSub: 10DARP |
| dateFirstSub: 5DARP |
| dateFirstSub: ASREQ |
| dateFirstSub: 60DAC |
| dateFirstSub: 90DAC |
| dateFirstSub: ASREQ |
| dateSubseqSub: 16DARP |
| dateSubseqSub: SEE ITEM 16 |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: SEE ITEM 16 |
| dateSubseqSub: SEE ITEM 16 |
| dateSubseqSub: 10DAR |
| dateSubseqSub: SEE ITEM 16 |
| dateSubseqSub: ASREQ |
| dateSubseqSub: 5DARP |
| dateSubseqSub: 5DARP |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: 5DARP |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: 10DARP |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| dateSubseqSub: ASREQ |
| 16. REMARKS: Item 9:DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to : |
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12: The IPMDAR authoritative data consisting of the Contract Performance Dataset (CPD), Schedule (Native Schedule File and Schedule Performance Dataset (SPD)) and Performance Narrative (Executive Summary and Detailed Analysis) shall be submitted as a single submission no later than 16 business days after the end of the first full accounting period following Authorization to Proceed (ATP).
Item 13: Monthly Submissions Requirement: IPMDAR authoritative data consisting of the Contract Performance Dataset (CPD), Schedule (Native Schedule File and Schedule Performance Dataset (SPD)) and Performance Narrative (Executive Summary and Detailed Analysis) shall be submitted as a single submission no later than 16 business days after the close of the contractor’s monthly accounting period.
Item 14 - All IPMDAR files must be electronically submitted to the DOD EVM Central Repository (EVM-CR). The EVM-CR can be located through the OSD IPM website (https://www.acq.osd.mil/asda/ae/ada/ipm/index.html).
Item 16: Additional Remarks
A Historical Contract Performance Data file will be required in place of the normally provided CPD annually.
Performance Data: The CPD shall be submitted in dollars and hours down to the control account or CLIN level.
See Attachment 0006 for further instructions.
16. REMARKS: Item 9:DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall be submitted by COB every Friday.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 8: The Government will approve/disapprove within 48 hours after receipt. The Contractor shall resubmit within 24 hours after receipt of Government comments.
Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or Operational Use) (20 January 2017).
Other requests shall be referred to:
U.S. Army Aviation and Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Shall be submitted upon Contractor revisions.
Item 12: Shall be submitted NLT 60 calendar days after award. During the transition in period.
Item 14: Delivery shall submit one (1) hard copy to GFR, and one (1) electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
16. REMARKS: Item 8: The Government will approve/disapprove within 5 days after receipt. The Contractor shall resubmit within 3 days after receipt of Government comments.
Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall be submitted upon Contractor revisions and prior to implementation.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 8: The Government will approve/disapprove within 10 working days. Disapproved plans shall be resubmitted within 5 working days from the Government's disapproval date.
Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to:
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall be submitted upon Contractor revisions and prior to implementation.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 8: The Government will approve/disapprove within 48 hours after receipt. Disapproved plans shall be resubmitted within 24 hours after receipt the Government's disapproval date.
Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to:
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall be re-submitted upon Contractor revisions with status checks during transition periods.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to:
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item13: Shall be re-submitted upon Contractor revisions and prior to implementation. Shall be submitted upon the hiring of employees participating in a Collective Bargaining Agreement.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
16. REMARKS: Item 8: The Government will approve/disapprove within 10 working days. Disapproved plans shall be resubmitted within 5 working days from the Government's disapproval date.
Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Shall be submitted annually for review and approval.
Item 13: Shall be resubmitted each year NLT 30 July.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall be submitted NLT 15 days after receipt of Final Report.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall be re-submitted upon Contractor revisions.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Per accident/incident.
Item 12: The Contractor shall submit first notification, by phone, NLT 4 hours of the accident/incident.
Item 13: Each accident/incident. Additional submissions are every 2 hours until the investigation is taken over by law enforcement. The COR may adjust frequency of subsequent reporting. The Contractor shall submit final written report to PCO, COR, and GFR within five working days. The GFR will be known as the primary POC.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
16. REMARKS: Item 8: The Government will approve/disapprove within 10 working days. Disapproved plans shall be resubmitted within 5 working days from the Government's disapproval date.
Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Revisions shall be submitted and approved prior to implementation by the Contractor.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 8: The Government will approve/disapprove within 24 hours of receipt. Disapproved reports requesting additional information shall be resubmitted within 24 hours from the Government's disapproval.
Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Shall be submitted for each delay identified.
Item 12: The Contractor shall submit first notification verbal or email, NLT within 1 hour of awareness of condition/situation. The Contractor shall submit a written report within 24 hours of identifying the delay.
Item 13: Each accident/incident. Additional submissions shall be required NLT 24 hours upon change in the condition.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12: Shall be submitted 30 days after full contract performance.
Item 13: Shall be submitted NLT the 5th working day after the end of the month.
Item14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9:DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12: Shall be submitted 30 days after full contract performance.
Item 13: Shall be submitted NLT the 5th working day after the end of the month.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10, 12, 13: Shall be NLT 7th working day after a discovery. Shall be subsequently submitted for each discovery.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Per accident / incident
Item 12: The Contractor shall submit initial email notification shall be NLT 1 hour of incident/accident.
Item 13: Each accident/incident. Additional submissions are weekly by noon (local time) on Tuesdays until the conclusion of the investigation. The COR may adjust frequency after four consecutive weeks.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks.
The Contractor shall submit report to PCO, COR, GFR, and site Additional Duty Safety Officer (ADSO) within 5 working days. The GFR will be known as the primary POC.
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: When a discrepancy is detected the Contractor shall submit electronic notification as required for discrepancies, for loss, damage, destruction, or theft of GFP/GFE.
Item 12: The initial email notification shall be NLT 1 hour of incident or discovery.
Item 13: Per each incident. The completed packet shall be submitted NLT 15 days after the first email notification.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Every 6 months.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks.
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Per each request.
Item 12: NLT 10 working days from discovery.
Item 13: Submitted upon Contractor's determination for need of MNM purchase.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall be submitted NLT COB on Friday of the week.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall be submitted NLT the 5th working day after the end of the month.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall be submitted NLT 10 working days after the end of each reporting period. Reporting period shall be according to calendar months.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Shall be submit for each occurrence.
Item 12: Shall be submitted 2 days prior to requested work period.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12: Shall submit first submission no later than (NLT) 15 days after the sixth month concludes. The reporting period covers from the contract award date through the end of the sixth month. First reporting month could be shorter than 30 days depending on the start date.
Item 10 & 13: Shall submit invitation and agenda NLT 15 days in advance of PMR; Briefing Package NLT 5 days prior to PMR and Final Meeting Package NLT 15 days after the PMR meeting. Reporting period shall be in whole calendar months.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 13: Shall submit NLT 10 days after the end of each reporting period or upon Government request
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or Operational Use) (20 January 2017). Other requests shall be referred to:
U.S. Army Aviation and Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898 Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12 & 13: Shall be weekly after receipt of kits and funding.
Item14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item: Additional Remarks.
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10 and 13: Shall be submitted upon completion of an aircraft maintenance activity (reset, phase, or other aircraft maintenance actions utilizing parts).
Item 12: Shall be submitted NLT 14 days of maintenance action completion.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9:DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Per request from Government.
Item 12: Shall be submitted NLT 5 working days after request.
Item 13: Shall be submitted upon Contractor revisions or upon request by Government.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12: The Contractor shall submit NLT COB 2 Days after reporting period.
Item 13: Shall be submitted upon Contractor revisions or upon Government request.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Delivery shall be submitted upon each discovery.
Item 12: The Funding notification shall be prior to or at the time of program cost incurred of 70% for each accounting classification reference number (ACRN)/CLIN/SLIN/ROM.
Notification of a Over-Cost shall not be submitted more than 24 hours after discovery of cost obligation of 70% of the ceiling price.
Item 13: Shall be revised and subsequently submitted as the information changes or per Government request.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10 and 13: Delivery shall be submitted upon Government's request for DAL supplement data.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12: Submitted within 10 Days after reportable period.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12: Submitted within 5 Days after reportable period.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12: NLT 45 days from first completed effort.
Item 13: NLT 45 days from completed effort or SLIN PoP end date. Batches are acceptable.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Shall be submitted Monthly NLT 15th.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command90DAC
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 10: Shall be submitted at least once every two years.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail.
Item 16: Additional Remarks
See Attachment 0006 for further instructions.
16. REMARKS: Item 9: DISTRIBUTION STATEMENT E: Distribution authorized to DoD Components only (Administrative or operational Use) (20 January 2017). Other requests shall be referred to :
U.S. Army Aviation And Missile Command
ATTN: AMAM-LF
Redstone Arsenal, AL 35898
Export-Control Act Warning - Required See DoDI 5230.24, Enclosure 4, Figure 1 for the appropriate notice.
Item 12 & 13: Submitted on the same day and same time frame that a voucher is submitted in Wide Area Workflow. Prior to the first submission, the contractor shall establish access to the required Government websites.
Item 14: Delivery shall be electronic copy in Microsoft 365 (Microsoft Office version 2024 or later) format via e-mail. The contractor shall download the eCRAFT Periodic Report Utility (ePRU) spreadsheet and user manual to report appropriately.
See Attachment 005 for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .