Revised_STATEMENT_OF_WORK_27_March_2018.docx
DOCX document 60 KB Posted
- Solicitation number
- W56ZTN-19-R-0001
About this file
This notice provides information about an upcoming competitive solicitation for roofing maintenance, repair, reconstruction, demolition, replacement, and installation services at Aberdeen Proving Ground in Maryland. The U.S. Army Contracting Command - Aberdeen Proving Ground intends to issue solicitation number W56ZTN-19-R-0001 for a post-wide roofing services contract with an estimated value of $50-70 million over five years, including a base year and four option years. The requirement will be set aside for small businesses participating in the 8(a) Business Development Program. The North American Industry Classification System code is 238160 for roofing contractors and the size standard is $15 million. The solicitation is expected to be released on or about January 30, 2019 via the Federal Business Opportunities website. The government will hold a site visit for prospective offerors after solicitation release. The solicitation will require a single-award indefinite delivery/indefinite quantity contract to be awarded on a firm-fixed price basis for task orders issued over the ordering period.
Revised Statement of Work dated 27 March 2019
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Directorate of Public Works Roofing Requirements Contract Specification SBA Requirement # 0353/19/0184
STATEMENT OF WORK (SOW) Rev. 27 March 2019 and
SPECIAL CONDITIONS (SC)
STATEMENT OF WORK
SW-1 DESCRIPTION OF WORK:
SW-1.1 This work consists of furnishing all plant, labor, materials, equipment, tools, and services, insurance and bonding necessary, and performing all work necessary for the MAINTENANCE, REPAIR, RECONSTRUCTION, DEMOLITION, REPLACEMENT, AND/OR INSTALLATION OF A WIDE VARIETY OF ROOFING SYSTEMS. All coordination with the government shall be through the Contracting Officer (KO) or the Contracting Representative (COR).
SW-1.2 This includes all work related to providing complete and watertight roofing systems on diverse building types.
SW-1.2.1 The following reference documents are applicable to the overall performance of this contract. Specific reference documents are listed in each section of the specifications for that particular work feature/roof system.
a. United Facilities Criteria (UFC) 3-110-03 of 1 May 2012 – Roofing
b. The National Roofing Contractors Association (NRCA) Roofing Manuals
1. Membrane Roof Systems dated 2011
2. Steep slope roof systems dated 2012
3. Metal panel and SPF roofing system dated 2012
4. Architectural metal Flashing, condensation and air leakage control, and reroofing dated 2014
c. Safety and Health Requirements Manual, USCOE, EM385-1-1, Latest edition.
SW-1.3 This work includes inspections, sampling, and analysis. The prime contractor is required to have a full time safety specialist on site. The Contractor will submit full version of the Quality Control Plan and the Safety and Health Plan to the Government within one week after contract award. These are post-award submittals:
SW-1.3.1 Quality Control Plan consisting of the following:
a. Quality control procedures.
b. Quality Control Manager’s responsibilities
c. Quality control procedures for non-compliance of preventing problems
d. Inspection process for identifying, documenting, and timely correction of punch-lists
e. Plan for managing warranty inspections
f. Quality Mission Statement
SW 1.3.2 Safety and Health Plan consisting of the following:
a. Position description & qualifications for safety specialist.
b. Written safety & health plan.
c. Control procedures for non-compliance for Safety & Health procedures.
d. Behavior & attitudes of personnel.
e. Condition of equipment.
f. Experience modification rate for worker’s compensation insurance.
g. OSHA incidence rates, for recordable injuries & illness.
h. General Liability completed operations insurance claims history & must be printed on insurance letterhead.
i. Safety Education/tool box meetings.
j. Provide history for the last five years for violations of Federal, State, Local or environmental regulations.
k. Drug & Alcohol policies.
SW 1.3.3 Environmental Plan consisting of the following:
a. Plan for maintaining current MSDS sheets.
b. Control Procedures for compliance with environmental requirements.
c. Environmental Compliance Officer resume and experience.
d. Identification and reporting procedures for non-compliant activities along with corrective actions.
SW 1.4 Location: Aberdeen and Edgewood Areas of Aberdeen Proving Ground, Maryland
SW 1.5 Office: The contractor shall maintain an office which is within 30 miles of Aberdeen Proving Ground – North.
SW 1.6 Workday:
SW 1.6.1 Daily: Unless otherwise specified, the normal working hours on APG for most Government employees are based on 80 hours, biweekly cycle as follows:
First Week Monday through Thursday 0700-1700 HRS Friday 0700-1600 HRS Second Week Monday through Thursday 0700-1700 HRS Friday Scheduled Day Off (SDO) SW 1.6.2 Prior to performing work during hours other than those specified, the contractor shall obtain the permission of the Contracting Officer or his authorized representative. The contractor will be allowed to work on the SDO as long as it is outside work or coordination was made with the Contracting Officer’s Representative (COR) for access to inside the building. Normally, requests for permission to work during hours other than those specified shall be submitted no less than 24 hours prior to the time the contractor desires to perform such work.
SW 1.6.2 Holidays: The Contractor shall not normally be expected to work during Federal holidays. Every effort will be made by the COR to have the work sites available on holidays if the contractor desires to work. Contractor shall submit request by e-mail, (3) working days in advance prior to working on a holiday. Proposals shall not include overtime for holidays unless specifically negotiated to expedite work.
| SW-2 | PRINCIPAL FEATURES: The work is to be performed under individual task orders, which can include, but are not limited to the maintenance, repair, reconstruction, demolition, replacement, and installation of the following principal features: |
| a. | Existing variety of roofing materials and insulations. |
| b. | Roof decking. |
| c. | Trusses and rafters. |
| d. | Sheet metal, flashings, drip edges, gravel stops, etc. |
| e. | Vents, and ventilators. |
| f. | Cants, nailers, soffit, cornice, rake, and fascia. |
| g. | Gutters & scuppers, downspouts, leaders & conductor heads. |
| h. | Roof drain lines interior to building. |
| i. | Walkways, pitch pockets, expansion joints, caulking and backer rods. |
| j. | Painting various surfaces. |
| k. | Recoating existing roof systems. |
| l. | Raising roof mounted equipment. |
| m. | Electrical conduit. |
| n. | Asbestos and Lead Inspections, Sampling, Analysis, Testing. |
| o. | Roofing related materials containing asbestos and lead as necessary to accomplish the task at hand. |
| p. | Associated tasks and details necessary to complete these projects and provide a watertight roof. |
| q. | Associated tasks and details necessary to address the weather tight integrity of the building envelope. |
SW-2.1 Provide all equipment and labor to perform a wide variety of repairs and maintenance on an assortment of roof types. This includes emergency response during other than normal duty hours.
SW-2.2 Prior to the start of work, all roof drains, scuppers, gutters, and downspouts shall be cleaned of all debris and tested to ensure proper operation. Precautions shall be taken to avoid damage to existing items during the cleaning and testing operation. Cleaning and testing of roof drains shall be incidental to the work items under this contract. The government reserves the right to issue delivery orders specifically for cleaning of gutters and downspouts, such as during the late fall period to prepare for the winter months. The Contract Line Items provided are for that purpose.
SW-2.3 All government property damaged by the contractor during the performance of this contract shall be repaired or replaced by the contractor at no additional cost to the Government. This includes but is not limited to damage to lawns and tuft caused by the contractor’s actions
SW-3 CONTRACT MANAGEMENT AND EXECUTION (not an all inclusive list)
SW-3.1 PROJECT MANAGER – The project manager shall have the following minimum level of qualification for the execution of work on this contract. This individual shall be a full time employee of the prime contractor with a minimum of seven (7) years’ experience in the construction/roofing field with a MINIMUM of five (5) years’ experience in management of roofing projects. The project manager shall have managed at minimum, two roofing projects with a total value in excess of one million U.S. dollars. This individual shall be fluent in English and possess good oral and written communication skills. The project manager shall be certified as a Project Management Professional (PMP) as issued by the Project Management Institute (PMI) with a minimum of two years’ experience as a PMP. They shall also have completed an OSHA 30 Hour construction safety course or the 40 hour USACE Construction safety course.
SW-3.2 QUALITY CONTROL MANAGER – The Quality Control manager shall be a separate but integral part of the contractor’s Quality Assurance/Quality Control Staff. This person shall be a full time employee of the prime contractor with a minimum of seven (7) years’ experience in construction quality control, five of which shall be directly related to quality control of roofing projects. The QCM Shall be a Registered Roof Observer (RRO), in good standing, and certified by the Roofing Consulting Institute (RCI). This person shall have been certified as an RRO for a minimum of three consecutive years. In addition the RRO shall be certified in Quality Control for Roofing as issued by RCI. The QCM’s experience and qualifications are outlined in greater detail in Section 01-45-00.10-20 (Quality Control) of the specifications.
SW-3.3 SAFETY MANAGER – The Corporate Safety Manager (CSM) (officer) shall be a separate but integral part of the contractor’s management team. This person and the site safety officers assigned to projects, shall have no other duties and responsibilities except for the implementation, supervision and safety oversight of the task orders issued under this contract. The CSM(O) shall be fluent in English and possess good oral and written communication skills, and be an employee of the Prime Contractor. The CSM shall be have the following minimum level of training/experience: A minimum of seven years construction related safety experience, five of which shall be solely dedicated to roofing projects, be a Certified Site Safety and Health Officer, 30 Hour OSHA safety course or 40 hour USACE Construction Safety Course.
SW-3.4 Site Superintendent – The Site Superintendent shall be a full time employee of the prime contractor. This person shall have a minimum of five (5) years’ experience as a site supervisor or superintendent on commercial roofing projects. Shall be a U.S citizen and be able to communicate in English and be able to translate for non-English speaking staff members.
SPECIAL CONDITIONS:
SC-1 BUY AMERICAN ACT:
Show evidence that all products to be used on this contract comply with the Buy American Act.
SC-2 AVAILABILITY OF THE WORK SITE:
The Contractor shall not begin work without a preconstruction meeting and the approval of the COR.
SC-3 GENERAL SAFETY:
On each job prior to the start of work, the Contractor shall coordinate through the COR with the Safety Office, and verify that all safety related issues are reviewed and addressed. The offeror shall provide written documentation of Worker’s Compensation insurance Experience Modification Rate (EMR) of 1.00 or less for the previous five year operating period. An EMR of greater than 1.0 during any portion of the previous five year operating period would be deemed unacceptable. MSD sheets are required for all products to be used on a given task order. The offeror’s proposed products shall not contain any chromates, molybdate, chlorine or zinc, or any other heavy metals chemical compounds, which are considered potential pollutants. Products that have no reportable quantity, no Permissible Exposure Limit (PEL) and reduce waste byproducts or render wastes neutral to the environmental are desirable.
SC-3.1 The performance of all work associated with this contract shall include the requirements of 29 Code of Federal Regulations (CFR) Part 1910 General Industry standards, and 29 CFR 1926 Construction standards, with the latest revisions to include the newly revised 1926 Subpart M Fall Protection.
SC-3.2 The performance of all work associated with this contract also includes the provisions of The United States Army Corps of Engineers Safety and Health Requirements Manual, EM-381-1-1, the latest edition and revisions.
SC-3.3 The contractor shall provide an on-site supervisor at each work site. This person shall have current Red Cross Certification in First Aid, and Adult CPR (with AED certification), and a First Aid Kit appropriate for the work and number of people on hand. Current Red Cross certifications shall be in their possession at all times. In the event current certifications are not in their possession, all work will be stopped until someone with current certifications in their possession is present on site. The job superintendent and quality control specialist shall have seven (7) years of roofing construction experience. The safety specialist shall have five (5) years of roofing construction experience. The environmental compliance officer shall have a minimum of five (5) years construction related experience.
Superintendents shall be employees of the prime contractor and each superintendent shall manage no more than two (2) projects valued in excess of $1,000,000.00 and no more than a total of seven (7) projects at any given time. The individual(s) identified will be responsible for timely progress and completion of all assigned work, and be wholly devoted to the supervision of work in progress under this contract only.
SC-4 STRUCTURAL INSPECTION:
The contractor and the government shall inspect the supporting structures of each building’s roofing system and verify load capacities, condition, and the roofs ability to support workers, materials and equipment to be used. This inspection shall include, wherever possible, an inspection of the underside of the walking working surfaces, i.e. roof deck and structural supports.
SC-5 SECURITY REQUIREMENTS:
In addition to the security requirements listed elsewhere in this specification, additional security requirements may be required by specific tenant commands during the execution of this project. These requirements include but are not limited to the exclusive use of American citizens only, additional escort requirements, additional criminal background checks and badging requirements.
SC-6 ASBESTOS TESTING:
a. Existing materials: Prior to performing work on each task order under this contract the government will sample and test suspect roofing materials for the presence of asbestos. The inspection and sampling will be inclusive of all roofing material that may contain asbestos materials. The Government, at their discretion, may require the roofing contractor to perform the sampling and testing of suspect roofing materials. An accredited Asbestos Building Inspector (BI) who has been trained and certified in accordance with the USEPA’s Model Accreditation Plan (MAP) as outlined in 40 CFR Part 763 shall perform this work. This work will be paid for under the contract line item for asbestos samples. When the results of such testing are complete the Contractor shall notify the COR in writing describing the results. The results of the sampling and testing will be provided to the COR who will distribute them to the PM, ISO and Environmental Division Asbestos Coordinator.
b. New Materials: The Government, at their discretion, may require the contractor to provide asbestos analytical results for new materials installed as part of this contract. These materials include but are not limited to gypsum drywall, gypsum roof board, exterior grade gypsum products, roofing felts, asphalt shingles, and roofing cements. Any gypsum product imported from the People’s Republic of China SHALL be tested for the presence of asbestos regardless of the material type. The analytical method used shall consist of either Polarized Light Microscopy with Dispersion Staining or Transmission Electron Microscopy for bulk samples utilizing the EPA protocols for analyses.
When the results of such testing are completed the Contractor shall notify the COR in writing with the results. Laboratory reports shall be turned in at the end of the project with the closeout package.
SC-7 CORE SAMPLES:
Upon request the contractor shall core sample existing roofing materials down to the deck, and repair sample area. Where core samples are directed, the contractor shall patch the core location to ensure it is weather tight and not a source of leakage into the building. In addition, the government may, at their discretion, request a petrographic analyses of the core sample to determine the composition of the various layers within said sample.
SC-8 STORAGE:
Materials stored on the roof shall not exceed one day’s supply and shall be distributed so as not to exceed the load limit of the roofing system. Where laydown areas are limited, the contractor may request to store materials on the roof in excess of one day’s supply provided the materials are distributed in such a manner so as not to exceed the live load limit of the roof and roof structure. At no time will any flammable/combustible materials be stored on the roof in excess of the amount needed for that day’s production. Flammable/combustible materials shall be stored in a segregated storage container or enclosure. The use of Flammable Materials Storage cabinets is recommended but not required unless the jurisdiction having authority requires their use.
SC-9 COMPATIBILITY:
All materials furnished shall be compatible with each other. In the event the use of dissimilar materials is unavoidable they shall be completely insulated from each other by means of gaskets, insulating compounds, etc.
SC-10 SHELF LIFE:
At least half the shelf life, of any time-limited materials, shall remain at the time of application.
SC-11 REFERENCES & STANDARDS:
All publications, standards, and other references incorporated into this specification include the most recent editions, supplements, revisions, and amendments, etc.
SC-12 COMPLETION PACKAGE:
The completion package shall consist of the applicable warranties, submittals, etc. required by the contract documents. The contractor shall also fill out the applicable sections and submit the Real Property Close Out package to the COR as part of the final completion package. This document shall be provided by the government in electronic format and returned electronically to the COR. As-built drawings may be deemed necessary and shall be required on a case-by-case basis. Those projects requiring as built drawings will be identified during the site visit and the scope of the drawings identified and agreed to at that time. The as-built drawings, if required, shall be produced in the format described in the General Conditions.
SC-13 ASBESTOS CONTAINING MATERIALS:
The use of products that contain asbestos is expressly forbidden during the execution of task orders assigned by this contract. Appliances, equipment, components, compounds and coatings as well as other items which utilize gaskets, seals, insulation, filler reinforcement etc., whether factory fabricated of field fabricated shall be accompanied by formal literature or a specific statement from the manufacturer/supplier that no asbestos was incorporated into this product. The requirements for testing suspected products are incorporated in SC-6 above.
END OF SECTION 01010
SECTION 01011
GENERAL CONDITIONS
(June 26, 2018)
PART 1 GENERAL
INDEX
GC-1. Access to Job-Sites GC-2. As-Built Data GC-3. Department of Agriculture Quarantine GC-4. Disposal of Waste Material GC-5. Excavation Clearance GC-6. Fire Prevention and Protection GC-7. Fuel Burning Equipment GC-8. Hazardous Area Work Permits GC-9. Lyme Disease Warning GC-10. Maryland Department of the Environment (MDE) Permits GC-11. Range Briefings GC-12. Refrigerant Management GC-13. Safety GC-14. Submittal Register and Progress Schedules GC-15. Unabsorbed Overhead Delay Damages GC-16. Utility Outages GC-17. Warranties GC-18. Water Supply GC-19. Working Hours GC-20. Worksite Appearance and Security
GC-1. ACCESS TO JOB-SITES:
1. All Commercial vehicles and visitors must use the Maryland Boulevard (MD 715) gate for the Aberdeen Area and the Hoadley Road (MD24) gate in the Edgewood Area of APG
1. SHORT TERM (Day Pass): All contractors and visitors accessing the installation on a one-time or infrequent basis will have to check into the Visitor Center located at each gate to obtain a Day Pass. Day Passes are valid for the day and area (Aberdeen Area or Edgewood Area) they are issued. Day passes must be displayed on the dashboard of the vehicle.
1. All Contractor personnel and visitors must provide valid photographic identification such as a state driver’s license, state agency issued photo ID, or passport.
1. The driver must also provide the vehicle registration
1. All personnel must declare a specific destination on the installation.
1. LONG TERM (Contractor ID): Contractors accessing the installation on a frequent basis should obtain a Contractor Identification Badge. Application for this badge must be done in person at the US Army Garrison, Directorate of Public Works (DPW) Security Office located in the Aberdeen Area of APG, First Floor of Building A-4304, 6504 Rodman Road, APG, MD. Badge Processing takes approximately three (3) days. The contractor ID Badge must be shown at the gate when accessing the installation.
1. HIGH SECURITY AREAS (SECURITY BADGES): For job-sites at Aberdeen Proving Ground in security areas, contractors/contractor employees entering these areas must, at minimum, have a Photographic Security Badge or be escorted by a person having such badge. One person with a security badge may escort up to four persons without a photographic security badge, provided all remain together and within sight of the escort. The contractor shall submit applications for his employees no later than ten (10) days after award of contract. Forms may be obtained from the Administrative Office in Building 4304 (6504 Rodman Road). Questions regarding security badges should be directed to the DPW Security Officer at 410-306-2072. Badge applications require approximately six (6) to eight (8) weeks for processing after receipt of applications.
1. Certain areas are more restrictive than outlined above. Access to these areas shall be as detailed in other sections of the specifications.
1. All personnel and equipment entering these areas shall be subject to applicable local and federal regulations.
1. Certain areas within the post are more restrictive than those outlined above. Access to these areas shall be as outlined and detailed in other sections of these specifications. Access to the roof tops of the building in the C4ISR complex, (6000 block buildings) will require the submission of a Visitors Request (VR) Form to the appropriate security officer within the various agencies in the complex.
1. PERSONAL ELECTRONIC DEVICES (PED’s): Additional restrictions on the possession, carrying and use of Personal Electronic Devices (PED’s) may be applicable depending upon the specific security area where work is to be performed. These additional requirements will be outlined in detailed at the pre-construction meeting. Compliance with these additional requirements shall be mandatory and shall not be construed as an additional burden subject to compensation.
G. The prime contractor shall identify in writing one individual who will be the point of contact (POC) for the coordination of security and contractor identification badges of his employees, sub-contractors or any one else needed to perform contractual work under this contract. Prior to any individual requesting security or contractor identification badges, the contractor's POC shall notify the Security Office, Building 4304 at (410) 306-1150 and the Construction Branch Chief, Building 4304 at (410) 306-1161 by email the following information:
Prime Contractor Employee: Prime Contractor’s Full Name, Address and Telephone Number - Contract Number - Expiration Date of Contract or the Time required for the Badge – Prime Contractor’s Email Address - Individuals Full Name.
Subcontractor Employees: Subcontractor’s Full Name, Address and Telephone Number - Contract Number
- Expiration Date of Contract or the Time required for the Badge – Subcontractor’s Email Address - Individuals Full Name. The prime contractor shall ensure that all Government issued badges that were requested and issued are returned to the security office in Building 4304 at the completion of the contract. ***Failure to return any Government issued badges shall be reflected negatively in future past performance evaluations.***
In case of a lost or misplaced badge the prime contractor shall notify the Security Office, Building 4304 at (410) 306 1150 and the Construction Branch, Building 4304 at (410) 306-1161 as soon as possible. The prime contractor is required to conduct visual inventories of assigned badges on a monthly basis to insure that the badges are accounted for and have not been lost or stolen.”
GC-2. AS-BUILT DATA:
1. Exterior Work – Specific to Roofing projects
1. Where available, the government shall provide a copy of the original as-built roof drawings to the contractor in both digital and hard copy format. The contractor shall then mark up the hard copy with the required features and update the digital drawings as required.
2. Specific information required for roof drawing updates shall include the demolition of the abandoned roof mounted equipment, the locations of new curbs and other pertinent details relative to roof mounted equipment, the insulation thickness, roof membrane type along with methods of attachment to the substrate, the taper profile to include fill (if applicable), locations of safety rails, walk paths etc. installed on the roof and the locations of the lightening protection system components to include ground loop and down lead locations (for new LPS installations).
B. Exterior Work - New Buildings, Utilities, Roads, etc.
(1) As-built data shall be compiled from field surveys performed by a Registered Professional Land Surveyor. This work shall be tied into the installation monument system on Universal Transverse Mercator (UTM) datum. The as-built survey shall be shown on standard Directorate of Public Works (DPW) drawing sheets and signed by a Registered Professional Land Surveyor. Deliverables of these data shall consist of one set of hard copy drawings and digital files compatible with DPW's Computer Aided Design (CAD) system. This CAD system is the “Microstation” product of Bentley Systems, Inc. Compatible digital file format shall be .DGN. These files are to be delivered on compact disk (CD).
(2) Information contained on the as-built drawings shall consist of but not be limited to:
| - Building footprints | |
| - Paving (roads, parking lots, hardstands, pads, walks, etc.) | |
| - Fencing | |
| - Utilities (water, sewer, storm drainage, steam, electric, telephone, fiber optics, | gas or fuel, etc., and associated appurtenances) |
| - Structures (bridges, testing facilities, etc.) | |
| - Prominent physical features. |
(3) The limits of the as-built plans shall be from the point in which new work ties into existing features and infrastructure to and including the building or structure footprint.
(4) The information that is depicted on the as-built drawings shall have UTM coordinate values associated with the features respective location. UTM values are required at the following points:
| - Corners of buildings | |
| - Points of Tangent (PT), | |
| - Points on Curve (POC), | |
| - Points of Curve (PC), | |
| - Points of Reverse Curve (PRC), | |
| - Points of Compound Curve (PCC) on linear features | |
| - Poles, transformer, manholes, valves, tees, hydrants, and any other | appurtenances associated with utilities. |
C. Interior Work:
(1) The contractor will be given one hard-copy set of full size prints of the contract drawings (in addition to those mentioned elsewhere) and if available, the drawings in electronic form on floppy disk or CD.
(2) During the life of the contract, the onsite job superintendent shall maintain an as-built record of the contract, including any modifications performed, on the hard copy.
(3) After contract final inspection, the changes noted on the hard copy shall be incorporated into the digital data. Both the hard copies and floppy discs or CD's shall be turned over to the Contracting Officer’s Representative (COR).
(4) Equipment Warranty Identification Tag: The contractor shall provide and install on each piece of equipment a self-adhesive warranty identification tag. The tag shall contain the following information: Installed by, Installers phone number, Manufacturer, Model Number, Serial Number, Contract Number, Government Project Manager, and the Contracting Officer’s Representative (COR) with, phone numbers, Warranty expiration dates for the contractor and manufacturer, and the MAXIMO Identification Number. The contractor shall obtain the MAXIMO Identification Number from the COR. The contractor shall also submit a written report to the COR of the above information.
GC-3. DEPARTMENT OF AGRICULTURE QUARANTINE: See Section 01561, ENVIRONMENTAL PROTECTION.
GC-4. DISPOSAL OF WASTE MATERIAL: See Section 01561, ENVIRONMENTAL PROTECTION.
GC-5. EXCAVATION CLEARANCES:
a. Contractor shall obtain an approved Excavation Permit (EP), SSB Form 1247-R, from the Directorate of Public Works before starting any excavation work. The Point of Contact at DPW is the Chief, Construction Inspection Branch at 410 306-1161 (phone), 410 306-1187 (FAX), or ECO@us.army.mil (E-mail). The contractor shall initiate the permit process by filling out the "EXCAVATOR SECTION" of the EP, and submitting through the COR. Processing will normally require ten (10) workdays.
b. The Contractor must also contact MISS UTILITY (1-800-257-7777) to identify any non-government owned utilities
c. All damage to identified utilities shall be the fiscal responsibility of the contractor, to include any peripheral loss imposed on the organizations/tenants of Aberdeen Proving Ground (e.g. damage to facilities, equipment, loss of productivity due to loss of any utility). The authorized representatives for DPW and the Garrison Installation Safety Office have the authority to stop any excavation that is deemed to be either unsafe or unauthorized.
c. Should the contractor encounter unidentified utility lines, all excavation work shall stop, and the COR should be notified immediately. Excavation work shall not be permitted until the utilities are properly identified, and the COR issues a notice to proceed.
d. Permits will be good for 30 calendar days from date of issuance. Contractor shall be responsible for obtaining renewals to maintain permit status.
GC-6. FIRE PREVENTION AND PROTECTION: The contractor shall comply with all fire prevention measures prescribed in the installation fire regulations, a copy of which is on file in the office of the COR. A written fire permit shall be obtained by the contractor for use of open flame devices, such as blow torches, roofing torches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment from the Fire and Emergency Services Division (F&ESD), of the Directorate of Emergency Services (DES). The contractor shall be liable for any fire damage to Government property attributable to negligence on the part of the contractor, including failure to comply with fire prevention measures prescribed by terms of this contract. Contractors may call the F&ESD at (410) 306-0572/0573 for on-site inspection, or report to Building 2200, 6553 Aberdeen Boulevard, to receive specific fire instructions if in the Aberdeen Area. Edgewood Area contractors should call (410) 436-4451 or 436-4452, or visit Building E-5180, 8218 Hoadley Road.
GC-7. FUEL BURNING EQUIPMENT: Fuel burning equipment under this contract such as boilers, furnaces, water heaters, generators, etc. will be supplied with Reasonably Available Control Technology (RACT), which reduces emission of nitrogen oxides (NOx). Manufacturers offer low NOx burners as optional items on their equipment. These low NOx burners shall be selected and their price included in the contractor's bid.
GC-8. HAZARDOUS AREA WORK PERMITS:
a. Where a work site is included in an area known, or suspected, to contain hazardous materials, a Hazardous Area Work Permit (HAWP) will be included in the specification after the section "Statement of Work". The contractor shall post a copy of the permit in full view at the work site. The contractor shall be responsible to inform all his personnel and assure they conform to the special requirements directed by the permit. This conformance shall be monitored by the Installation Safety Office. Non-conformance shall result in a work stoppage until the situation is corrected, at no expense to the Government. Continued instances of non-conformance may result in contract termination.
b. Hazardous materials include, but are not limited to, National Priority List (Comprehensive Environmental Response Compensation and Liability Act (CERCLA)), chemical surety materials, hazardous chemicals, carcinogens, asbestos, explosives, radioactive materials, etc. These hazardous materials may be encountered at work sites at Aberdeen Proving Ground.
c. When a HAWP is not included with the specification, the work site is in an area not known or suspected to contain hazardous materials. However, during operations such as excavation or demolition, materials may be uncovered which could be hazardous (e.g. asbestos). If contractor personnel should encounter materials, either known hazardous materials or unrecognized materials, they should stop work in that area immediately, and notify the Installation Safety Office at 410 306-1095/1096/1097 for work in the Aberdeen Area, or 410 436-4839 for work in the Edgewood Area, and the COR. Work may be resumed after identification of the material, and notification of work constraints, if any, caused by the materials.
GC-9. LYME DISEASE WARNING: The contractor is responsible for ensuring that his or her personnel take all reasonable precautions to avoid contracting Lyme Disease, to include: using repellents, wearing personal protective clothing and avoiding the wear of abbreviated clothing such as shorts, cutoffs, short sleeve shirts, tee shirts and sandals in areas where tick borne diseases are endemic. Particular attention must be given to ticks and Lyme disease prevention when working in grassy and wooded areas on Aberdeen Proving Ground.
GC-10. MARYLAND DEPARTMENT OF ENVIRONMENT (MDE) PERMITS: Articles or processes requiring MDE permits to construct and/or operate, and that require shop drawings or manufacturer's data to obtain the permit, such as boilers, and incinerators, the following shall apply:
a. The contractor shall initiate the permit application. After completion of those portions pertaining to the equipment to be furnished under contract, the application shall be forwarded, through the COR, to DPW environmental specialist for completion and submission to the MDE. The permit application shall be submitted within ten workdays of approval of the submittal for the equipment.
b. It is the contractor's responsibility to provide equipment or systems capable of construction and operation under MDE permit. The Government will not accept a system that does not meet the state of Maryland law.
c. If required, the Government will make available the following by the time the "Notice to Proceed" is issued:
1. MDE approved soil erosion and sediment control plans and, if necessary, storm water management plan.
1. Critical Area Commission approved plans
1. A permit from the State Historic Preservation Office (SHPO).
d. The contractor is responsible to comply with all provisions of the permit(s). Non-compliance shall result in the issuance of a stop-work order from the Contracting Officer, and work shall not be allowed to resume until corrective actions have been taken.
e. For further information, see Section 01561, ENVIRONMENTAL PROTECTION, the applicable portions of paragraphs entitled "POLLUTION PREVENTION" and "ENVIRONMENTAL PERMITS" respectively.
GC-11. RANGE BRIEFINGS: If the work site is designated as one in a range area or in close proximity to a range area, the contractor will be briefed and provided with written instructions on range procedures prior to start of work (see Aberdeen Proving Ground Regulation (APGR) 385-1). This information will include safety requirements such as range clearance/control procedures, emergency procedures, communication requirements, etc. The contractor shall be responsible to disseminate these procedures to all contract and sub-contract personnel. Work shall be scheduled and coordinated with the applicable organization.
GC-12. REFRIGERANT MANAGEMENT: In line with federal environmental laws and regulations regarding the handling of chlorofluorocarbon (CFC) and hydrochlorofluorocarbon (HCFC) refrigerants, the following shall apply:
a. The contractor shall not intentionally vent any refrigerants to the atmosphere.
b. When performing work requiring the opening of existing air conditioning or refrigeration systems, the refrigerants shall be recovered using EPA-approved recovery or recovery/recycle equipment and storage vessels.
c. On systems to be reused after completion of work, the contractor shall install new or reclaimed refrigerant. All current systems using CFC refrigerants should, unless otherwise specified, be considered for modification to allow use of an alternative HCFC.
d. New or replacement air conditioning/refrigeration equipment shall be installed with specified HCFC refrigerants. No refrigerant shall be used having an Ozone Depletion Potential (ODP) equal to or greater than 0.05 (based on R-11 = 1.0).
e. Refrigerant recovered and not to be reused shall be properly labeled as "Recovered Refrigerant", with the type (R-11, R-12, etc.) indicated, and turned over to the COR.
f. See also Section 01561, ENVIRONMENTAL PROTECTION, applicable portions of paragraphs entitled "POLLUTION PREVENTION" and "SPECIFIC DISPOSAL METHODS" respectively.
GC-13. SAFETY:
a. All operations performed shall be in accordance with OSHA 29 CFR 1910 and 1926, and the Code of Maryland (COMAR), including the High Voltage Act. In those instances where Army regulations are more stringent, the Army regulations shall apply. Applicable Army Safety Regulations include, but are not limited to:
(1) AR 385-10, The Army Safety Program;
(2) AMCR 385-100, Safety Manual;
(3) APGR 385-4, The APG Safety and Occupational Health Program; and
(4) EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual.
The contractor is responsible for securing these references and any other regulations necessary for the performance of their tasks under this contract.
b. In accordance with contractual requirements, each contractor shall appoint a safety representative/competent person to ensure compliance with safety regulations and to act as liaison between the contractor and ISO. ISO personnel will be available for regulatory compliance advice on any particular safety problem that may arise during normal course of operation.
c. Before work under the contract is started, the contractor's safety representative shall report to the ISO located on the First Floor of Building 305 for familiarization with safety requirements. The safety representative shall maintain an accurate record of and shall report to the ISO exposure data and accidents resulting in death, traumatic injury, occupational disease and/or damage to property, materials, supplies and equipment incident to work performed under the contract. The contractor shall submit for review to the Installation Safety Division an accident prevention plan meeting all of the requirements outlined in EM 385-1-1. No mobilization will be allowed until the plan is accepted by the designated Installation Safety Division representative.
d. The Contracting Officer shall notify the contractor of any noncompliance with the foregoing provisions and action to be taken. The contractor shall, after receipt of such notices, immediately correct the conditions. Such notice, when delivered to the contractor or his representative at the site of work, shall be deemed to be sufficient for this purpose. If the contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The contractor shall make any part of the time lost due to any such stop order subject of claim for excess costs or damages.
e. Confined space work shall not be performed without appropriate monitoring and approval of an entry permit under provisions of 29 CFR 1910.146 and APG Regulation 385-4.
f. Work requiring control of hazardous energy shall be performed IAW 29 CFR 1910.147 and APG Regulation 385-4. Any construction work that takes place above electrical conductors or service lines to a building will require an outage, regardless of the distance of the work area from the conductors.
GC-14. SUBMITTAL REGISTER AND PROGRESS SCHEDULES: The Contractor shall prepare a submittal register of all items required under the contract. The contractor shall prepare a schedule in accordance with Contract Clause entitled "Schedule For Construction Contracts" (FAR 52.236-15) which shows milestones and intervals for contract completion. The register and schedule shall be delivered to the Contracting Officer within ten (10) calendar days after the contractor's receipt of "Notice to Proceed".
GC-15. UNABSORBED OVERHEAD DELAY DAMAGES:
a. Compensation for unabsorbed overhead incurred in a delay during which the contractor is forced to stand by, whether calculated by the Eichleay Formula or any other method, is not automatic. During any such delay, it is the duty of the contractor to seek out new contracts or additional work opportunities to mitigate delay damages. To substantiate entitlement to unabsorbed overhead damages, the contractor must first demonstrate the nature of the delay that made it impractical to mitigate delay damages by undertaking new work.
b. In submitting any claim for delay damages for unabsorbed overhead, regardless of length of delay, the contractor shall list all work performed during the delay period. This list shall include date of each contract or agreement, the period of performance and any other information required by the Contracting Officer.
c. In submitting any claim for delay damages for unabsorbed overhead, the contractor must prove all opportunities, prime or sub-contract, bonded or unbonded, it could have undertaken but for the delay. The parties to this contract agree that if no additional work opportunities arise during any delay period in excess of 14 days, under absorption of overhead would be caused by lack of opportunity and not the delay under this contract. In the absence of opportunity to take on additional work, the contractor will be entitled to no additional unabsorbed overhead costs under this contract.
d. In the event new work opportunities do arise during a compensable delay, the contractor will provide notice to the Contracting Officer of such new contracts or other additional work opportunities as they become available during the delay period. The Government will be liable for no unabsorbed overhead costs that arise during the delay period in the absence of an opportunity to adjust the performance schedule to enable avoidance of such costs.
GC-16. UTILITY OUTAGES:
a. General: All utility service outages shall be at the convenience of the Government, and will normally be scheduled during off-duty hours or weekends. Outages shall be requested in writing to the Contracting Officer no less than three weeks (21 days) in advance.
b. Electrical: Work on high voltage primary lines shall be accomplished while lines are de-energized and grounds are in place. If, due to extenuating circumstances, this is not practical, permission must be requested in writing through the COR and the Installation Safety Office (ISO), to allow work while energized or hot. The request shall include a specific Activity Hazard Analysis (AHA) which outlines in detail why the work can only be performed while the conductors are energized and shall outline in detail the procedures to be followed to perform the work, In addition to the normal procedures, the emergency procedures to be followed shall be outlined as well. If permitted, contractor shall be subject to all OSHA requirements for equipment and worker protection.
GC-17. WARRANTIES: Before final acceptance, the contractor shall provide to the COR a list showing all products and installed equipment that are covered by warranties, and the length of time the warranty is in effect.
GC-18. WATER SUPPLY: A vacuum breaker or appropriate backflow prevention device shall separate any temporary or permanent connection to the potable water supply. The vacuum breaker shall be in accordance with the National Plumbing Code and the American Water Works Association. See Section 01561, ENVIRONMENTAL PROTECTION, Water and/or Sewer Lines, for additional information.
GC-19. WORKING HOURS: Unless otherwise specified, work under the contract shall be performed during the hours from 7:30 a.m. to 5:00 p.m., local time, Mondays through Thursdays and from 7:30 a.m. to 4:00 p.m. on Fridays, except federal holidays. Prior to performing work during hours other than those specified, the contractor shall obtain the permission of the Contracting Officer or his authorized representative. Normally, requests for permission to work during hours other than those specified should be submitted no less than 24 hours prior to the time the contractor desires to perform such work.
GC-20. WORKSITE APPEARANCE AND SECURITY: Contractor shall maintain worksite in a reasonably neat appearance. This shall be done by daily cleanups of the worksite. Contractor is responsible to secure all tools and materials at the close of business. The Contractor shall protect all construction materials from exposure to the elements. The Contractor shall ensure that, at the end of the work shift, the building exterior doors/windows are secure to prevent access to the building interior. This requirement applies to all jobsites, including those within restricted areas of APG.
PART 2 PRODUCTS
Compliance with Green Procurement Requirements: Contractor shall follow the Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and the Army contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for-Sustainable-Procurement.docx) for acquisition of building material, products and select materials to be utilized on this contract. Materials selected shall have the following characteristics: 1) Long life cycle, 2) Use the least toxic materials, 3) are recyclable, 4) materials that are resource efficient, 5) materials with a maximum recycled content, 6) materials harvested on a sustainable yield basis, 7) and products causing the least pollution during their manufacture, use and reuse.
PART 3 EXECUTION
Not used.
-- END OF SECTION 01011 --
SECTION 01 45 00.10 20
QUALITY CONTROL FOR MINOR CONSTRUCTION
02/10 (Revised March 2019)
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 latest version Safety and Health Requirements Manual
1.2 SUBMITTALS
The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
QC Plan - Submit a QC plan within 15 calendar days after receipt of Notice of Award.
1.3 INFORMATION FOR THE CONTRACTING OFFICER (KO)
NOTE: Daily CQC Reports and Contractor Production Reports shall be submitted on all task orders issued under this contract at the end of each week.
1.3.1. Prior to commencing work on construction, the Contractor shall provide a copy set of their current report forms to the KO and the COR. The report forms will consist of the Contractor Production Report, Contractor Production Report (Continuation Sheet), Contractor Quality Control (CQC) Report, CQC Report (Continuation Sheet), Preparatory Phase Checklist, Initial Phase Checklist, Rework Items List, and Testing Plan and Log.
1.3.2 The KO and/or the COR shall review the proposed forms submitted by the contractor and within ten working days, either accept the forms as presented or reject the forms and request revisions be made to one or more of the forms. The contractor shall have ten days to revise and re-submit the form or forms in question to the KO and or COR for review and acceptance.
1.3.3 The government reserves the rights to accept or reject any contractor supplied forms or form. Those forms that do not provide sufficient detail in their reporting shall not be acceptable and shall be revised to the satisfaction of the government.
1.3.4 Deliver the following to the KO/COR:
a. CQC Report: Daily CQC reports signed by the CQM submitted, by 10:00 AM the next working Monday after each week that work is performed;
b. Contractor Production Report: Daily reports singed by the Site Superintendent submitted by 10:00 AM the next working Monday after each week that work is performed;
c. Preparatory Phase Checklist: Original attached to the original CQC Report and one copy attached to each copy;
d. Initial Phase Checklist: Original attached to the original CQC Report and one copy attached to each copy;
e. Field Test Reports: One copy, within the week after the test is performed, attached to the CQC Report;
f. QC Meeting Minutes: One copy, within the week after the meeting; and
g. QC Certifications: As required by the paragraph entitled "QC Certifications."
1.4 QC PROGRAM REQUIREMENTS
Establish and maintain a QC program as described in this section. The QC program consists of a QC Manager, a QC plan, a Coordination, Pre-Construction Meeting and Mutual Understanding Meeting, QC meetings, three phases of control, submittal review and approval, testing, and QC certifications and documentation necessary to provide materials, equipment, workmanship, fabrication, construction and operations which comply with the requirements of this contract. The QC program shall cover on-site and off-site work and shall be keyed to the work sequence. No work or testing may be performed unless the QC Manager is on the work site.
1.4.1 Preliminary Work Authorized Prior to Acceptance
The only work that is authorized to proceed prior to the acceptance of the QC plan is mobilization of storage and office trailers, temporary utilities, and surveying.
1.4.2 Acceptance
Acceptance of the QC plan is required prior to the…