Attachment_0016-Contract_Data_Requirements_List_(CDRL).pdf
PDF 783 KB Posted
- Attached to
- DCGS-A Capability Drop-1 Synopsis
- Solicitation number
- W56KGY-17-R-0026
About this file
Contract Data Requirements List (CDRL)
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Data Requirement List (CDRL)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DCGS-A Battalion Solution W56KGY-17-R-0026 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Software Version Description (SVD) Version Description Document (VDD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81442A SOW Section 3.1.7.1, 3.1.9, & 3.2.2 SFAE-IEW-DC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT MONTHLY 15 days ARO b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draf t
Final
SEE BLK 16 Reg Repro
16. REMARKS:
BLOCK 4: In addition to the requirement of DI-IPSC-81442A , the contractor shall include all the information required by the SOW. Contractor format acceptable.
BLOCK 7: Letter of Transmittal (LT) to be submitted with each SVD.
BLOCK 9: Distribution authorized to U.S. Government Agencies only.
BLOCK 10: An SVD as shall be submitted on a monthly basis with each monthly security patch/release delivery.
BLOCK 12: Initial Draft SVD due 15 days ARO after applicable order.
Deliverables shall be complete, stand-alone, and address all the concerns in SOW paragraphs shown in Block 5. Deliverables shall be submitted and exchanged electronically, in Microsoft ® Office product suite or in searchable digital formats.
BLOCK 13: Revised submission shall be 30 days after receipt of Government comments.
BLOCK 14: SVD shall be disseminated via electronic mail with LT.
Reports shall be disseminated via electronic mail as follows – Email:JACQUELINE.BAILEY34.civ@mail.mil and STEPHEN.J.MORTON8.civ@mail.mil and with cc to others to be specified.
SFAE-IEW-DC
*ELECTRONIC
SUBMITTAL
SEE BLOCK 16
15. TOTAL 2
G. PREPARED BY
Jarad Wormley
H. DATE I. APPROVED BY
Stephen J. Morton
J. DATE
8 Sept 2017 18 Sept 17 18 Sept 17
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
E TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DCGS-A Battalion Solution W56KGY-17-R-0026 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Engineering Change Proposal
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80639 SOW Section 3.7.5 SFAE-IEW-DC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ONE/R* 30 days ARO b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A ASREQ SEE BLOCK 16
Reg Rep ro
16. REMARKS:
BLOCK 4: In addition to the requirement of DI-SESS-80639, the contractor shall include all the information required by the SOW. Contractor format acceptable.
BLOCK 7: Letter of Transmittal (LT) to be submitted with each ECP.
BLOCK 9: Distribution authorized to U.S. Government Agencies only.
BLOCK 10: One submittal for each ECP as required in each Task Order.
BLOCK 12: Initial report due 30 days after receipt of order. The contractor shall submit the ECP 30 days after Government approval of any engineering change that impacts the configuration baseline.
Deliverables shall be complete, stand-alone, and address all the concerns in SOW paragraphs shown in Block 5. Deliverables shall be submitted and exchanged electronically, in Microsoft ® Office product suite or in searchable digital formats.
BLOCK 13: Revised submission shall be 30 days after receipt of Government comments.
BLOCK 14: ECP shall be disseminated via electronic mail with LT.
Reports shall be disseminated via electronic mail as follows – Email:JACQUELINE.BAILEY34.civ@mail.mil and STEPHEN.J.MORTON8.civ@mail.mil and with cc to others to be specified.
SFAE-IEW-DC
*ELECTRONIC SUBMITTAL
SEE BLOCK 16
* Each Submission
15. TOTAL 2
G. PREPARED BY
Jarad Wormley
H. DATE I. APPROVED BY
Stephen J. Morton
J. DATE
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER _MGMT____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DCGS-A Battalion Solution W56KGY-17-R-0026 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Scientific and Technical Reports Operations Security (OPSEC) Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-80934C SOW Appendix A Security Requirements
SFAE-IEW-DC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ONE/R* 90 days ARO b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A ASREQ SEE BLOCK 16
Reg Rep ro
16. REMARKS:
BLOCK 4: In addition to reporting requirement of DI- MGMT-80934C, Contractor format acceptable.
BLOCK 10/11/12: OPSEC SOP/Plan shall be submitted NLT 90 days after receipt of order.
BLOCK 13: Revised submission shall be 30 days after receipt of Government comments.
BLOCK 14: Provide deliverables in searchable Adobe Acrobat, Microsoft Office digital file formats. Submit the deliverables with Letter of Transmittal (LT) via electronic mail, FTP, SharePoint, or other means, with concurrence of the requiring office.
Reports shall be disseminated via electronic mail as follows – Email:JACQUELINE.BAILEY34.civ@mail.mil and STEPHEN.J.MORTON8.civ@mail.mil and with cc to others to be specified.
SFAE-IEW-DC
*ELECTRONIC
SUBMITTAL
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
Jarad Wormley
H. DATE I. APPROVED BY
Stephen J. Morton
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
C TDP TM OTHER MGMT
E. CONTRACT/PR NO. F. CONTRACTOR D. SYSTEM/ITEM
DCGS-A Battalion Solution W56KGY-17-R-0026 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A004
Cybersecurity Risk Management Framework (RMF) Assessment and Authorization Products, and CYBERSAFE Objective Quality Evidence, Assessment & Authorization (A&A) Products
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-82135 SOW Section 3.1.7.1 & 3.3.4 SFAE-IEW-DC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT MONTHLY SEE BLOCK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
SEE BLOCK
SEE BLOCK 16 Reg Repro
16. REMARKS:
BLOCK 8: Format. The RMF artifacts shall be delivered in a format approved by the Government’s Designated Accrediting Authority (DAA), Authorizing Official (AO), or Information Systems Security Manager (ISSM). Submissions shall consist of a draft and final copy.
BLOCK 9: Distribution Statement D. Distribution authorized to the DoD and DoD contractors only. Reason: To protect technical/ operational data or information. Other requests shall be referred to SFAE-IEW-DC. Analysis deliverable shall be classified no lower than
SECRET NOFORN.
BLOCK 12: First submittal is 15 days ARO after applicable order.
Continuous monitoring and assessment is required for all security controls for the system, with POA&M updates to be completed at least monthly. The contractor shall deliver the documents within timeframes to be established in order to achieve Interim Authority to Test (IATT) or Authority to Operate (ATO). The contractor shall deliver the documents within timeframes to be established in order achieve Interim Authority to Test (IATT), Authority to Operate (ATO).
BLOCK 13: Revised submission shall be 15 days after receipt of Government comments.
BLOCK 14: Analysis shall be disseminated IAW AR 380-5, 8-3.
Delivery POC is: WAI.L.WONG6.civ@mail.mil with notification of delivery to:JACQUELINE.BAILEY34.civ@mail.mil and STEPHEN.J.MORTON8.civ@mail.mil and with cc to others to be specified.
SFAE-IEW-DC
*ELECTRONIC SUBMITTAL
SEE BLOCK 16
15. TOTAL 2
G. PREPARED BY
Jarad Wormley
H. DATE I. APPROVED BY
Stephen J. Morton
J. DATE
8 Sept 201 18 Sept 17 18 Sept 17
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
C TDP TM OTHER MISC
E. CONTRACT/PR NO. F. CONTRACTOR D. SYSTEM/ITEM
DCGS-A Battalion Solution W56KGY-17-R-0026 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005 Cyber Security Test Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-82140 SOW Section 3.1.7.1 SFAE-IEW-DC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10.FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ SEE BLOCK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
SEE BLOCK 16 Reg Repr o
16. REMARKS:
BLOCK 8: The contractor shall deliver digital files for all documents developed under this contact. Delivery formats will be discussed and approved by the Government. Submissions shall consist of a draft and final copy.
BLOCK 9: Distribution Statement D. Distribution authorized to the DoD and DoD contractors only. Reason: To protect technical/ operational data or information. Other requests shall be referred to SFAE-IEW-DC. Analysis deliverable shall be classified no lower than
SECRET NOFORN.
BLOCK 12: The contractor shall deliver documentation at the start of User Trial Cyber Security Testing activity.
BLOCK 14: Analysis shall be disseminated IAW AR 380-5, 8-3.
Delivery POC is: WAI.L.WONG6.civ@mail.mil with notification of delivery to:JACQUELINE.BAILEY34.civ@mail.mil and STEPHEN.J.MORTON8.civ@mail.mil and with cc to others to be specified.
SFAE-IEW-DC
*ELECTRONIC SUBMITTAL
SEE BLOCK 16
15. TOTAL 2
G. PREPARED BY
Jarad Wormley
H. DATE I. APPROVED BY
Stephen J. Morton
J. DATE
18 Sept 17
BLOCK 13: The contractor shall deliver subsequent cyber security test plan documentation NLT forty-five (45) calendar days prior to the Operational Test and Army Interoperability Certification.
Revised submission shall be 15 days after receipt of Government comments.
18 Sept 17
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DCGS-A Battalion Solution W56KGY-17-R-0026
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 Software/Firmware Change Request
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-81807 SOW Section 3.4.1, 3.7.2
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ ASREQ b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
ASREQ Reg Repro
16. REMARKS:
BLOCK 14: Analysis shall be disseminated IAW AR 380-5, 8-3.
Reports shall be disseminated via electronic mail as follows – Email:JACQUELINE.BAILEY34.civ@mail.mil and STEPHEN.J.MORTON8.civ@mail.mil and with cc to others to be specified.
SFAE-IEW-DC
*ELECTRONIC SUBMITTAL
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
Jarad Wormley
H. DATE I. APPROVED BY
Stephen J. Morton
J. DATE
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
C TDP TM OTHER MGMT
E. CONTRACT/PR NO. F. CONTRACTOR D. SYSTEM/ITEM
DCGS-A Battalion Solution W56KGY-17-R-0026 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A007 Program Protection Implementation Plan (PPIP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMIN-81306 SOW Section 3.1.10 SFAE-IEW-DC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ SEE BLOCK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
SEE BLOCK
SEE BLOCK 16 Reg Repr o
16. REMARKS:
BLOCK 4: In addition to the requirement of DI-ADMIN-81306, Contractor format acceptable.
BLOCK 12: First submittal is 90 days ARO after applicable order.
BLOCK 13: Final submittal shall be 30 days after receipt of Government comments.
BLOCK 14: Provide deliverables in searchable Adobe Acrobat, Microsoft Office digital file formats.
Reports shall be disseminated via electronic mail as follows – Email:JACQUELINE.BAILEY34.civ@mail.mil and STEPHEN.J.MORTON8.civ@mail.mil and with cc to others to be specified.
SFAE-IEW-DC
*ELECTRONIC SUBMITTAL
SEE BLOCK 16
15. TOTAL 2
G. PREPARED BY
Jarad Wormley
H. DATE I. APPROVED BY
Stephen J. Morton
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DCGS-A Battalion Solution W56KGY-17-R-0026 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A008 Software User Manual (SUM)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81443A SOW Section 3.2.2 & 3.3.3 SFAE-IEW-DC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ 140 days ARO b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draf t
Final
SEE BLK 16 Reg Repro
16. REMARKS:
BLOCK 4: In addition to the requirement of DI-IPSC 81443A, the contractor shall include all the information required by the SOW. Contractor format acceptable.
BLOCK 7: Letter of Transmittal (LT) to be submitted with each SUM.
BLOCK 12: The contractor shall deliver the documents within 140 days after receipt of order.
Deliverables shall be complete, stand-alone, and address all the concerns in PWS paragraphs shown in Block 5. Deliverables shall be submitted and exchanged electronically, in Microsoft ® Office product suite or in searchable digital formats.
BLOCK 13: The contractor shall deliver documents with each major release.
BLOCK 14: SUM shall be disseminated via electronic mail with LT.
Reports shall be disseminated via electronic mail as follows – Email:JACQUELINE.BAILEY34.civ@mail.mil and STEPHEN.J.MORTON8.civ@mail.mil and with cc to others to be specified.
SFAE-IEW-DC
*ELECTRONIC
SUBMITTAL
SEE BLOCK 16
15. TOTAL 1
G. PREPARED BY
Jarad Wormley
H. DATE I. APPROVED BY
Stephen J. Morton
J. DATE
18 Sept 2017 18 Sept 17
Jarad.Wormley Typewritten Text
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
E TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DCGS-A Battalion Solution W56KGY-17-R-0026 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A009 Field Support Technical Manual
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC 80711A SOW Section 3.2.2 & 3.3.3 SFAE-IEW-DC
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT ASREQ 140 days ARO b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A SEE BLOCK 16
Reg Rep ro
16. REMARKS:
BLOCK 4: In addition to the requirement of DI-MISC 80711A, the contractor shall include all the information required by the SOW.
Contractor format acceptable.
BLOCK 7: Letter of Transmittal (LT) to be submitted with each Field Support Technical Manual.
BLOCK 12: Initial report due 140 days after receipt of order.
Deliverables shall be complete, stand-alone, and address all the concerns in PWS paragraphs shown in Block 5. Deliverables shall be submitted and exchanged electronically, in Microsoft ® Office product suite or in searchable digital formats.
BLOCK 13: The contractor shall deliver documents with each major release.
BLOCK 14: Documents shall be disseminated via electronic mail with LT. Reports shall be disseminated via electronic mail as follows – Email:JACQUELINE.BAILEY34.civ@mail.mil and STEPHEN.J.MORTON8.civ@mail.mil and with cc to others to be specified.
SFAE-IEW-DC
*ELECTRONIC SUBMITTAL
SEE BLOCK 16
15. TOTAL
G. PREPARED BY
Jarad Wormley
H. DATE I. APPROVED BY
Stephen J. Morton
18 Sept 2017 18 Sept 17
| 2017-09-18T11:09:58-0400 | |
| WORMLEY.JARAD.R.1364228054 |
| 2017-09-18T11:44:58-0400 | |
| MORTON.STEPHEN.J.1228933550 |
| 2017-09-18T11:10:23-0400 | |
| WORMLEY.JARAD.R.1364228054 |
| 2017-09-18T11:45:17-0400 | |
| MORTON.STEPHEN.J.1228933550 |
| 2017-09-18T11:10:41-0400 | |
| WORMLEY.JARAD.R.1364228054 |
| 2017-09-18T11:45:35-0400 | |
| MORTON.STEPHEN.J.1228933550 |
| 2017-09-18T11:10:55-0400 | |
| WORMLEY.JARAD.R.1364228054 |
| 2017-09-18T11:45:53-0400 | |
| MORTON.STEPHEN.J.1228933550 |
| 2017-09-18T11:11:09-0400 | |
| WORMLEY.JARAD.R.1364228054 |
| 2017-09-18T11:46:13-0400 | |
| MORTON.STEPHEN.J.1228933550 |
| 2017-09-18T11:11:23-0400 | |
| WORMLEY.JARAD.R.1364228054 |
| 2017-09-18T11:46:37-0400 | |
| MORTON.STEPHEN.J.1228933550 |
| 2017-09-18T11:11:39-0400 | |
| WORMLEY.JARAD.R.1364228054 |
| 2017-09-18T11:47:01-0400 | |
| MORTON.STEPHEN.J.1228933550 |
| 2017-09-18T11:11:56-0400 | |
| WORMLEY.JARAD.R.1364228054 |
| 2017-09-18T11:47:27-0400 | |
| MORTON.STEPHEN.J.1228933550 |
| 2017-09-18T11:12:16-0400 | |
| WORMLEY.JARAD.R.1364228054 |
| 2017-09-18T11:47:56-0400 | |
| MORTON.STEPHEN.J.1228933550 |
File details come from the government source that posted it. Updated .