DCGS-A_CD-1_QA_Part_4.pdf
PDF 81 KB Posted
- Attached to
- DCGS-A Capability Drop-1 Synopsis
- Solicitation number
- W56KGY-17-R-0026
About this file
DCGS-A CD-1 Q&A Part 4
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page/Paragraph Number
Comment Answer/Comment
158 Product Demo Plan
Regarding Phase 0: In the sample data provided for this solicitation the CMP API was included, but not the CMP development kit which contains examples for common operations and API usage. This is not available publicly and without it operational sequence is unclear. Will the Government please provide guidance if offerors are expected to perform CMP API calls without any instructions or if the Government plans to release the CMP development kit as part of this solicitation?
The CMP development kit is not required for sending the TIDAT message, it will not be released at this time.
159 Risk Reduction Power Point Video
In Amendment 3 the Government released a PowerPoint outlining instructions for Target nomination. Slide 13 step 3 introduces another product called CMP4Net and XSLT (XML Translator). Neither of these utilities were provided with the Amendment. Will the Government please make available the tools/utilities it has referenced in regards to Phase 0
The Government is not providing additional GOTS software for the Product Demonstration. The sample code provided in the PowerPoint briefing was intended as an example to show the logic required to build a TIDAT message. The code was not meant to be plugged or integrated directly into the offeror's solution. Each offeror solution is unique, so the code to build the TIDAT message will be unique as well. All of the API documentation for GTCS and CMP was provided in the GFI.
160 General Given the short time remaining before Phase 0, we would like to request an extension.
The Government is not considering extending the submittal due date at this time.
The DCGS-A Battalion Solution, CD-1 supports an urgent operational requirement.
161 General In the installation guide for the AGM Windows 10 image, it references an “AGM Windows 10 Application Disk” to complete installation. Can you
The AGM is GFI, thus not required for use under the contract. The government will not be distributing the application disk at this time.
let us know if the Army will provide this disk?
File details come from the government source that posted it. Updated .