Questions_and_Answers_-_Set_3-_W56HZV-19-R-0067_-_25_October_2019.pdf

PDF 145 KB Posted

Attached to
M16A4 RIFLES - 1005--GUNS, THROUGH 30MM
Solicitation number
W56HZV-19-R-0067
Issued by

About this file

This document contains questions and answers regarding solicitation number W56HZV-19-R-0067 for M16A4 rifles. The Army seeks to award up to two 5-year IDIQ contracts to manufacture M16A4 rifles in three configurations: standard with BUIS and ARS, alternate one with carrying handle and ARS, and alternate two with carrying handle and standard handguard. A minimum FAT quantity is required with a maximum total quantity of 215,000 rifles across both contracts. To access the technical data package, offerors must sign a non-disclosure agreement, be certified through the Joint Certification Program, and registered in SAM. The solicitation is anticipated for release in five to eight weeks with a specific due date and time stated. Questions will be addressed after RFP release.

Responses to Questions Set 3: W56HZV-19-R-0067

View the file

Other files

File Type Posted
W56HZV19R0067-0005.pdf PDF
Questions_and_Answers_-_Set_4-_W56HZV-19-R-0067_-_31_October_2019.pdf PDF
W56HZV19R0067-0004.pdf PDF
W56HZV19R0067-0003.pdf PDF
Attachment_0003_-_Pricing_Spreadsheet_-_Amendment_0003.xlsx XLSX spreadsheet
W56HZV19R0067-0002.pdf PDF
W56HZV19R0067-0001.pdf PDF
Questions_and_Answers_-_Set_2-_W56HZV-19-R-0067_-_24_October_2019.pdf PDF
Questions_and_Answers_-_W56HZV-19-R-0067_-_Correction__-_22_October_2019.pdf PDF
Questions_and_Answers_-_W56HZV-19-R-0067_-_21_October_2019.pdf PDF
Request_for_Proposal_(RFP)_W56HZV-19-R-0067.pdf PDF
Attachment_0007_-_Certificate_of_Destruction_of_Technical_Data.doc DOC document
Attachment_0002_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_0003_-_Pricing_Spreadsheeet.xlsx XLSX spreadsheet
Attachment_0004_-_SBP_Workbook.xlsx XLSX spreadsheet
Attachment_0001_-_Non-disclosure_Agreement.pdf PDF
Attachment_0006_-_SBP_Certification_of_Subcontractor.docx DOCX document
Attachment_0005_-_SBP_Workbook_Instructions.docx DOCX document
Attachment_0002_-_Past_Performance_Questionnaire_DRAFT.docx DOCX document
Attachment_0001_-_Non-disclosure_Agreement_DRAFT.pdf PDF
Attachment_0004_-_SBP_Workbook_DRAFT.xlsx XLSX spreadsheet
Attachment_0007_-_Certificate_of_Destruction_of_Technical_Data_DRAFT.doc DOC document
Attachment_0005_-_SBP_Workbook_Instructions_DRAFT.docx DOCX document
Attachment_0006_-_SBP_Certification_of_Subcontractor_DRAFT.docx DOCX document
DRAFT_W56HZV-19-R-0067_01Aug2019_DRAFT.pdf PDF
Attachment_0003_-_Pricing_Spreadsheeet_DRAFT.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

RFP W56HZV-19-R-0067

SET #3

1. Question: Per C.3.3.4.2, First Article Inspection, it is assumed that part quantities are multiplied by 12 for FAI. However, is it a correct assumption that if a part is used more than once in the weapon that is will also need to be inspected 12 times. For example, P/N 4 shows up in the weapon 3 times. It is assumed we will do 36 inspections on P/N 4.

Is this a correct interpretation of the USG intent?

Answer: All components of the five (5) Standard Configuration rifles will be inspected for FAI (100% verification). A sample size of five (5) components shall be subject to 100% verification for each of the Alternate Configurations, as defined in

Section C.3.3.4.2.1.1 and C.3.3.4.2.1.2.

2. Question: Per C.3.3.4.2, First Article Inspection, it is understood that the inspection quantities required are 12 guns for standard configuration only. Additionally, five components of each Alt (Alt one and Alt 2) configuration, that varies for the standard, will be used for testing. Of the 12 guns, 5 will be selected and dis-assembled for

100%-dimensional verification.

a. Is this a correct interpretation of the USG intent?

Answer: In accordance to C.3.3.4.2 FAI, verification inspection consists of 100% dimensional verification on 5 rifles from the First Article Quantities. Additionally, 5 components of each of the Alternate Configurations shall also be subject to 100% dimensional verification, as defined in Section C.3.3.4.2.1.1 and C.3.3.4.2.1.2.

b. If so, it is inevitable that the individual components of the rifle assembly will change dimensionally as a result of the assembly and testing process. Will there be variances allowed for dimensions that have changed after testing (assembly, firing)?

Answer: See Note in Table VI of MIL-DTL-32309A, which state the following: All items preceded by a single asterisk (*) shall form 1 (one) permanent Barrel and Front

Sight Assembly. All items preceded by a double asterisk (**) shall be replaced during interchangeability test. Parts inadvertently damaged during interchange may be replaced without penalty when authorized and verified by the government representative witnessing the test.

3. Question: A due date of 02 November only allows 7 working days to prepare estimates and engage industry partners. Given the complexity of some of the tooling required to support the two aforementioned Assemblies, we respectfully ask for an extension in order to provide the most meaningful response.

Would the USG please consider extending the proposal due date to 15 November

2019?

Answer: Solicitation amendment 0001 changed the closing date and time 7

November 2019, 02:00pm local time.