FINAL_NGCV_Industry_Day_Brief_OPSEC_APPROVED(6AUG18)v3.pdf

PDF 1 MB Posted

Attached to
Optionally-Manned Fighting Vehicle (OMFV) Program
Solicitation number
W56HZV18ROMFV
Issued by

About this file

OMFV Pre-Solicitation Conference Charts

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Use or disclosure of data contained on the page is subject to restrictions on title page.

Project Manager Next Generation Combat Vehicle

1DISTRIBUTION STATEMENT A: Approved for public release: distribution is unlimited.

Timeline of Events 1300-1310 Welcome 1310-1330 S&T update on RCV/MET-D/NGT prototyping 1330-1430 Discussion of NGCV OMFV 1430-1500 Break 1500-1600 Q&A Responses from FBO 1600-1615 Break 1615-1645 Panel Q&A 1645-1700 Closing Remarks

NGCV OMFV Industry Day

6 August 2018

NGCV-OMFV Welcome

6 AUG 2018

Mr. John Miller NGCV Capabilities Development

WELCOME

What Is NGCV?

The Robotic Combat Vehicle will mature on a longer timeline than the OMFV. Secretary Esper has directed the acceleration of OMFV while continuing investment in maturation of the Robotic Combat Vehicle.

NGCV Optionally Manned Fighting Vehicle (OMFV):

Combat platform that can maneuver Soldiers to a point of positional advantage and engage in close combat.

Engage in close combat and deliver decisive lethality during the execution of combined arms maneuver.

NGCV Robotic Combat Vehicle:

An unmanned close combat platform (tele-operated, semi-autonomous and autonomous).

Delivers decisive lethality and overmatch in a future operational environment executing combined arms maneuver.

6 AUG 2018

Why Army Needs NGCV?

Problem Statement:

How does the Army maintain overmatch in close combat against threats in the future operational environment?

• The changing character of warfare drives changes in how the Army delivers, operates, and sustains future combat capabilities.

• The first priority is replacing the Bradley with the Optionally Manned Fighting Vehicle (OMFV)

• OMFV will be joined later by a purpose built Robotic Combat Vehicle (RCV) and future capability upgrades for the OMFV.

S&T Update for NGCV tech base efforts

6 AUG 2018

COL Kevin Vanyo NGCV CFT S&T Lead

S&T Update for NGCV tech base efforts Next Generation Combat Vehicle Architectures…

FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Strategic Capabilities Roadmap Ex pe rim en ta l Pr ot ot yp in g

Platform Delivery

As of 011530AUG18

O M

FV

Foundational Software, Behaviors, Algorithms, Code, Machine Learning – Continuous Updates Incorporated with Experimental PrototypesR ob ot ic

C om ba t V eh ic le

Phase 3

MET-D

Experiment

Phase 1

RCV SURROGATE BUILD

Phase

2PURPOSE-BUILT RCV EXPERIMENTAL PROTOTYPE

Operational Unit

Evaluation

ATEC

Testing

PURPOSE-BUILT EXPERIMENTAL UNMANNED VEHICLE

Integrating architectures and updated government furnished equipment incorporated into future increments of NGCV Experimental Prototypes

Operational Unit

Evaluation

ATEC

Testing Operational

Unit Evaluation

ATEC

Testing

EMD

Award

MS C

Source Selection Prototype

Test LRIP Contract Award

FRP Option Award

FUE

EMD Material Lead EMD Prototypes

RFP

Release

Order and Obtain Long Lead Material for LRIP

Test Assets:

30 veh.

Squadron:

veh

1 BCT:

164 vehicles Full Rate Production (FRP)

Optionally Manned Fighting Vehicle - Procurement

ICD

Industry Day

Abrams Replacement – Procurement NGCV Future Capability Experimental Prototyping

Decision Point for Abrams Replacement acquisition based on autonomy, lethality, power, and protection technology maturity

NGCV prototyping incorporates significant S&T investment in critical enabling technologies through MET-D

Critical Acquisition Event

Soldier Experimentation

Contract Award DP Decision PointKey

NGCV Future Capability – Experimental Prototyping NGCV Future Capability Concept & Design DP

Robotic Combat Vehicle – Procurement

Decision Point for RCV acquisition based on autonomy and lethality technology maturity

6 NGCV Critical S&T TRL

Robotic Combat Vehicle – Experimental Prototyping

DP

3rd Gen FLIR and 50mm cannon available;

contractor integration on EMD prototypes

Testing

Pre-Decisional

8DISTRIBUTION STATEMENT A: Approved for public release: distribution is unlimited.

NGCV OMFV Industry Day Agenda, 6 August 2018

COL James Schirmer, PM NGCV

NGCV Defined Why Army Needs NGCV OMFV Acquisition Concept (MOTS) NGCV Industry Engagement Concept Industry Role in NGCV Questions & Answers from Sources

Sought Announcement

6 AUG 2018 8

FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28

2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Test Assets:

30 veh. 1 SQDN 1 BCTEMD Material Lead

CTR

Proposal Develop (3 mos)

EMD

Award

EMD

Prototypes

MS C

RFP

Release

Bid Sample Test

Source Selection

CTR

Design Developmental Test

Contractor Logistics Support

Log Product Development

LRIP Contract Award

FRP Option Award

Approval for Early Procurement of FRP Long Lead Material

LUT

LRIP Source Selection

Establish Organic Support by FY29

Production Qualification Test

FUE

LRIP Build

Train Unit IOT

Draft

CDD

Order and Obtain Long Lead Material for LRIP Full Rate Production (FRP)

RFP

Develop

OMFV Acquisition Concept

Design

Build

Test

Log

Contract

- Strategy may require industry investment to build a bid sample for competition

- Select up to 2 vendors for a funded development period, approximately 3 years (EMD)

- Focus on mature systems that can be upgraded in the future (Growth/SWAP-C)

Key Capabilities:

• >= 25% growth margins for future capabilities

• Protection\Lethality\Dash Speed > Bradley

• Integrated Active Protection System

• Optionally-Manned (Drive-by-wire; Remote weapon operation)

• 2 on a C-17

• 2 crew + 5 dismounts (6 vehicles per platoon with 3x 9-soldier squads)

• Optimized for Dense Urban Terrain

• Reduced Logistical Burden

6 AUG 2018

Through an Incremental Acquisition Approach and early engagement with industry and Army Senior Leaders, the Army plans to field a fundamentally improved multi-role fighting vehicle for fielding in 2026, with built in growth margins for rapid improvements and insertion of key enabling technologies.

NGCV OMFV Bid Sample Test Overview

6 AUG 2018

• OMFV Bid Sample Test may occur over approx. 90 days, and may assess submissions in the following areas:

- Automotive Performance

- Main Gun and Secondary Weapon performance

- Optics (Day and Night Performance)

- Ability of the platform to apply Active Protection Systems

- SWAP-C Margins for growth (particularly weight, power, lethality upgrades (50mm); Optics Upgrade (3rd Gen

FLIR); Optionally Manned Performance)

- Potential Evaluation of Armor Coupons for select areas

Project Manager Next Generation Combat Vehicle

This competitive acquisition approach awards:

- Up to two (2) contracts from an Engineering and Manufacturing Development (EMD) competitive solicitation, with a future competitive acquisition at Milestone C resulting in only one (1) contract LRIP/production contract.

- The EMD phase is very short, with little to no design time built in (prototype delivery for test would begin ~15 months from contract award). As a result, a Design Maturity Assessment and a bid sample (complete vehicle system) may be utilized to reduce risk.

- The Government may also consider alternative acquisition approaches to include Other Transactions Authority (OTA).

OMFV Acquisition Concept

Project Manager Next Generation Combat Vehicle

OMFV Acquisition Concept

• OMFV BFV Replacement Effort (cont’d):

- Parallel to industry efforts, the Government is developing prototypes for the XM-913, 3rd Generation FLIR, and Integrated Active Protection Systems.

These three subsystem may be a requirement of EMD, and may be provided as Government Furnished Information/Material. Or the Government may set performance requirements at that level and expect industry to meet it with Contractor Furnished Equipment.

- Completion of EMD will be followed by a competitive LRIP/production solicitation in 3Q FY23, and delivers a new platform with First Unit Equipped in 1Q FY26.

Industry Role in NGCV

• As with any ground vehicle development, industry members, both those in the traditional defense sector, and those from outside traditional defense, bring the Army’s vehicle concepts to reality rapidly, responsibly, efficiently, AND contribute:

– Expertise

– Technology development

– Integration capability

– Engineering capacity

• Technology Maturation will continue to progress in parallel with the OMFV Acquisition Concept, and will insert into OMFV future increments, when mature.

• An active approach is encouraged for industry to be a part of the NGCV development, especially vis-à-vis Other Transaction Agreements (OTA).

Industry Role in NGCV

6 AUG 2018

The United States government needs Industry feedback:

• Which requirements can you meet on the stated timeline?

• On the present timeline, which requirements do you need relief from, and if so, how much?

• For those requirements you cannot presently meet (to include integrated APS, 50mm cannon, and 3rd GEN FLIR even if they are objective requirements in addition to any thresholds you need relief from), how would you propose to meet them through incremental upgrades? What is the approximate timeline and associated cost delta to meet the given requirements (separate from the projected schedule)?

15DISTRIBUTION STATEMENT A: Approved for public release: distribution is unlimited.

NGCV OMFV Industry Day

BREAK

Questions & Answers from Sources Sought Announcement

Q&A Review

• Question #1: Can the EMD Prototype vehicle contain different components than the bid sample?

Answer #1: Yes, Any requirement for a bid sample would be utilized to assess risk of performance after contract, not to direct material solutions.

• Question #2: Are there US localized content requirements associated with current Buy America regulations?

Answer #2: All required Trade Agreements, Buy-America Act, etc., regulations would be included in any solicitation.

• Question #3: Would the U.S. Army consider publishing an advance copy of the proposed NGCV funding lines and their on-going status in negotiating the OSD and OMB budgeting process including any “pass back” or bill payer impacts that would change the U.S. Army’s proposed budget?

Answer #3: The Army has planned to fully fund NGCV to the proposed amounts in the POM.

However, OSD and OBM have not validated funding and therefore funding information will not be released at this time.

Q&A Review

• Question #4: When will the OMFV requirements be released? When will the OMFV requirements be baselined?

Answer #4: Draft Requirements iterations began in June of 2018. Any resulting solicitation will be based on firm requirements. Please reference Sources Sought document for additional authorized requests. The Army is still working the requirements with the goal of having firm requirements by September 2018.

• Question #5: Will you please characterize the US Army’s appetite/tolerance for risk on this program in terms of cost, schedule, and performance?

Answer #5: Market Research will inform program risk. Solicitation evaluation parameters will inform industry.

• Question #6: Is the objective of this Program to rapidly field a Bradley Replacement capability that is designed to evolve to meet OMFV objectives? Or to deliver an OMFV to Replace Bradley?

Answer #6: The objective of this program is to rapidly field a replacement for Bradley designed to evolve to meet the OMFV objectives.

Q&A Review

• Question #7: Page 3 of the Sources Sought contains 3 bullets that depict the program “requirements”. The first two bullets (objective OFMV and Bradley Replacement) are consistent with our understanding of top level intent. The third bullet seems more specific. Does this suggest a special emphasis? If so, please explain.

Answer #7: Please see paragraph 5 of the Sources Sought.

• Question #8: The release of the RFP for the OMFV in OCT 2018 allows for very little opportunity to include lessons learned from the Phase 1 and Phase 2 of the NGCV program.

Can we expect that the requirements related to MUM-T lessons learned in Phase 1 and Phase 2 to be included in OMFV specification will be updated after the RFP responses are turned in?

Answer #8: The immediate focus of the OMFV is a replacement for Bradley with optionally-manned capability. Designing in the ability to upgrade vehicle systems over time will allow the OMFV to evolve into the MUM-T mission as it becomes more defined. Any requirements needed to meet MUM-T mission will be on future OMFV block-type updates.

• Question #9: Is there any additional detail available on the Bid Sample test plan?

Answer #9: See slide 10 (potential bid sample assessment).

Q&A Review

• Question #10: Does the government have a proposed delivery schedule for the EMD prototypes since it appears to overlap with developmental testing?

Answer #10: Planned by month EMD prototype delivery schedule per vendor is FEB21- 2, MAR21 – 1, APR21 – 1, MAY21 – 2, JUN21 – 2. JUL – 2, AUG – 2. These monthly quantities are based off of planned MPF deliveries.

• Question #11: Is the government considering a budget allocation for down-selected suppliers between Milestone B and Milestone C and is it prepared to provide guidance at this stage?

Answer #11: Assuming that a "budget allocation" refers to multiple awards at MS B, the Government has not ruled out this strategy.

• Question #12: Does the Government anticipate the ability to offer long lead funding for the prototypes?

Answer #12: The Government does not intend to obligate funding prior to competitive award.

• Question #13: What are the Government’s vehicle performance/operational testing plans between the 14‐month and 22‐month delivery schedule?

Answer #13: The USG will conduct Developmental Test of the EMD prototypes. Plans are pending.

Q&A Review

• Question #14: Release of the DRAFT or FINAL classified annex to certified vendors as soon as is reasonable will result in a more relevant NDI vehicle solutions to be provided by prospective teams. When will the classified annex be released to industry?

Answer #14: The classified annex is still in early draft stages, but will be available shortly before RFP release.

• Question #15: Will considerations be given to opening up the aperture of the requirements to allow for more creative solutions to the mission be proposed?

Answer #15: The Government welcomes any feedback on requirements.

• Question #16: The Sources Sought states “Up to two contracts from an EMD competitive solicitation”. How confident are you that the Army will provide the needed funding in the POM to allow for two contract awards?

Answer #16: The Government will not pursue an unaffordable program, but has used the POM in anticipation of a multiple award.

• Question #17: Is the Army open to a wheeled or mixed fleet?

Answer #17: Bradley replacement in an ABCT would favor a tracked solution, however, the USG will review any submissions under the same requirements and base any decisions upon performance.

Q&A Review

• Question #18: Does the US Army foresee a Family of vehicle approach for the OMFV program?

Answer #18: Current Army direction is for a vehicle to replace the Bradley in all its current roles in the ABCT (Infantry, Scout, Engineer, Fire Support) and a future capability of Robotic Combat Vehicle controller.

• Question #19: When can Industry get the GFM ICDs (50mm, M-APS, 3rd GEN)?

Answer #19: The Government has not made any decisions regarding Government Property.

The Government plans to provide potential subsystem solutions ICDs upon request, where the Government has sufficient data rights.

• Question #20: Does the 50mm gun include a turret design specs?

Answer #20: Vendors would be expected to design or modify existing turrets to accommodate the 50mm gun and ammo handling system. ICD information will be provided upon request to assist in the design.

• Question #21: When do you expect the 3rd GEN FLIR to be ready for integration?

Answer #21: The Government anticipates 3rd GEN FLIR to be available for integration in 4th Quarter FY20. ICD information will be provided upon request to assist in the design.

Q&A Review

• Question #22: What will be the contract type associated with the planned October RFP?

Answer #22: The Government plans to utilize a firm fixed price development contract.

However, the USG will take into consideration feedback from industry before solicitation release.

• Question #23: Will there be a bid sample requested with the RFP?

Answer #23: Yes, see NGCV-CFT-Acquisition-Concept 21JUN18V4

• Question #24: How many awards are anticipated from the planned October 2018 RFP?

Answer #24: USG plans to award up to two contracts for EMD.

• Question #25: What is the expected timing of a potential follow-on production order?

Answer #25: A competitive production contract would follow EMD.

Q&A Review

• Question #26: How many production systems does USG intend to acquire?

Answer #26: The original cost estimate accounts for the replacement of 20 Brigades (BDE) worth of Bradley Fighting Vehicles. The 20 BDE quantity, plus test assets currently sets the AAO at 3590.

• Question #27: What are the interrelationships, mission role differences, and respective timing of the OMFV, MFV, and RCV variants in the NGCV program? Does OMFV and MFV refer to the same or distinct NGCV variants?

Answer #27: OMFV is the same as MFV. The "O" was added and represents the objective requirement for the vehicle to be optionally manned.

• Question #28: Although draft requirements are still in work, in what general performance parameters (KPPs) is OMFV expected to exceed the current Bradley platform, and for those KPPs, to what degree would OMFV performance exceed Bradley?

Answer #28: The government is conducting analysis in order to determine to what degree the OMFV will outperform the Bradley.

Q&A Review

• Question #29: What is the expected main weapon size / caliber for OMFV?

Answer #29: The Objective is 50mm.

• Question #30: Can the USG provide an OMS/MP for OMFV?

Answer #30: The Army is currently working the NGCV OMS/MP, the closest completed one available at this time is the 2009 HBCT OMSMP.

• Question #31: Can the USG provide classified requirements/specs to foreign based companies?

Answer #31: If the foreign based company has a US based cleared company with a DSP5 and a TAA in place with the USG on a specific contract the Government may provide classified information. However, the information would be sent from the government entity, i.e. TACOM through the embassy. There is no contractor to contractor exchange.

• Question #32: How open are we to foreign involvement?

Answer #32: The Government is open to any foreign involvement that complies with the terms of the solicitation.

Office of Small Business Programs

• Office of Small Business Programs (OSBP) is in attendance.

• Small businesses may contact the general mailbox for the OSBP at: usarmy.detroit.tacom.mbx.lcmc-osbp@mail.mil.

27DISTRIBUTION STATEMENT A: Approved for public release: distribution is unlimited.

NGCV OMFV Industry Day

BREAK

28DISTRIBUTION STATEMENT A: Approved for public release: distribution is unlimited.

COL Jim Schirmer

PM NGCV

COL Kevin Vanyo NGCV CFT S&T Lead

Mr. John Miller Director, Capabilities Development

NGCV CFT

NGCV OMFV Industry Day Panel Q&A

Panel Members

29DISTRIBUTION STATEMENT A: Approved for public release: distribution is unlimited.

NGCV OMFV Industry Day

Closing Comments

COL Jim Schirmer

PM NGCV

30DISTRIBUTION STATEMENT A: Approved for public release: distribution is unlimited.

NGCV OMFV Industry Day

BACK UP

(Letter to Industry)

25 JUL 2018

DEPARTMENT OF THE ARMY

NEXT GENERATION COMBAT VEHICLE CROSS FUNCTIONAL TEAM

7533 HOLTZ STREET, SUITE 2005

FORT BENNING, GEORGIA31905-5000

REPLY TO

ATTENTION OF

July 25, 2018

SUBJECT: Updated Letter to Industry on Desired Capabilities for Next Generation Combat Vehicle - Optionally Manned Fighting Vehicle (NGCV-OMFV)

This document is a follow-up to our 9 July 2018 NGCV-OMFV industry engagement. This is not a solicitation for proposals and a contract will not arise as a result of responding to this letter.

Problem Statement. The Army must maintain combat vehicle overmatch in close combat against threats in the current and future operational environment through 2050 and beyond. The changing character of warfare drives changes in how the Army delivers, operates, and sustains future combat capabilities. The Army will initially focus efforts on a replacement for the Bradley Fighting Vehicle, then later the Abrams Main Battle Tank, with Next Generation Combat Vehicles that overmatch pacing threats with decisive lethality, survivabliity, tactical mobility, and reduced logistical burdens. These vehicles, when combined with trained and technology enabled crews are essential to our battlefield success, now and in the future.

The nine capabilities from the original letter are provided below with initial threshold (T) and objective (0) performance measures. We are asking industry to assess their ability to provide the capabilities described below so that we can further refine adjustments to performance measures in future requirements documents in advance of a request for proposal release. Industry feedback can take any form desired but should be provided to the POCs on this letter no later than 6 August 2018.

a. Optionally Manned: Defined as a manned vehicle that primarily operates with a crew but has the ability to conduct remotely controlled operations while the crew is off platform. Control may be executed from a dismounted position or from another vehicle. The NGCV-OMFV must possess the capability to be remotely operated using non-physical tethers with off platform control of relevant sensors and driver controls (T) and off platform control of turret operations, imagery, and data information as respective capabilities are fielded (0). The communications link should be secure within 1500m (T), 3000m (0). The optionally manned capability is tele-operated (T), semi-autonomous (O).

b. Capacity. NGCV-OMFV should operate with no more than three (3) crewmen (T), two (2) crewman (0 ), while possessing sufficient volume under armor to carry at least five (5) Soldiers and their Personal Protective Equipment (PPE), associated work stations, and individual mission equipment (to include individual ammunition, rations and water) as dictated by mission roles (Infantry, Scout, Sapper, Fire Support) (T), RCV Controller (0 ), for a minimum of 72 hours (T), 96 hours (0).

c. Transportabtyil.i Two NGCV-OMFV's will be simultaneouslytransportable by one C-17 and should be ready for short duration combat (12 hours) within fifteen minutes of disembarking the aircraft (install radio antennas, loading ammunition handling systems, mounting the commander's independent weapon, stowing individual Soldier's gear, etc.). This does not include application of kits. Vehicles, when configured for air transport, (for example, fuel limited to 75% capacity to allow for fuel cell expansion) should not require major assembly or disassembly of vehicle components upon disembarking. NGCV-OMFV platform weight, when configured for air transport, should not exceed41.5 U.S. tons. NGCV-OMFVs will also meet all NATO transport requirements for rail and road movement (T), worldwide rail and road movement (0).

3125 JUL 2018 Use or disclosure of data contained on the page is subject to restrictions on title page.

-2-

d. Dense Urban Terrain Operations and Mobility. Platforms optimized for dense urban terrain should include the ability to super elevate primary weapons {+60°)/depress (-10°) weapons {T), 85°/- 200(0). Thecrew should also retain the ability to simultaneously engage threats using main gun and commander's independent weapon system, destroy threats located in a variety of building types, and conduct mounted/dismounted target handover with a three (3) person crew (T), two (2) person crew (0). Note: Threshlodelevation/depression data point is based on M2A4 performance.

(1) Crews and Soldiers should have improved 360° situational awareness capability day/night, on the move, from under armor. Vehicle occupants should be able to identify a NATO man sized target out to 350m (T), 500m (0). The field of view must be 60 degrees elevation and -20 degrees depression with a ground intercept of no more than three meters (T); unlimited observation elevation and depression out to desired ranges utilizing heads up displays (HUDs) and helmet mounted displays (HMDs) (0). Cameras/sensors should be shielded from weather effects and protected against airburst and thermobaric munitions.

(2) Platforms will be tracked and mobility capabilities include:

(a) Urban maneuverability (neutral steer, trafficability in rubbled environments.and increased dash speed [forward I reverse]).

(b) The NGCV-OMFV top speed should be 42.4 mph (T), 53 mph (0 ), and have the following minimum mobility characteristics: traverse a 60 percent slope/40 percent slide slope (T), 60%/60% (O); ford 48" (T), 87" (O); climb a 36" obstacle (T), 50" (O); cross a 7' gap (T), 9.1' (0) , accelerate (dash speed) 0-30 mph:,; 19 seconds (T), 0-31/:s; 12 seconds (0), and have a VehicleCone Index :,; 14 at combat weight. Note: Threshold data points are based on M2A4 performance; objective data points are based on best industry solution provided 9 JUL 18.

(c) Operational Range. NGCV-OMFVwill be capable of operating without refuel for 300 miles (T); 620 miles (0) in accordance with the NGCV System Operational Mission Summary/Mission Profile (OMS/MP), Major Combat Operations (MCO) terrain profile (DRAFT due NLT 1 AUG 2018).

The Army is interested in non-traditional power generation sources. Note: Threshold data point are based on Bradley Fighting Vehicle requirements; objective data point are based on best industry solution provided 9 JUL 18.

e. Protection. The NGCV-OMFV must possess requisite protection to survive on the contemporary and future battlefield.

(1) NGCV-OMFV will provide frontal arc protection, measured from the last occupant from STANAG Level 5+ threats (T); equivalent to M1A2SEPv3 (0). OMFV will provide 360 degree level of protection for the occupants from STANAG Level 4 threats and overhead protection from STANAG Level 6 threats. The platform provides integral underbelly protection for the occupants from a 2x threat with the capability to add on a 5x protection kit (T=O).

(2) NGCV-OMFV will have an integrated hard and soft kill active protective system (T) and integrated long rod defeat active protection (0).

(3) NGCV-OMFVwill integrate threat cueing and pre-emptive protection capabilities suchas pre-shot threat optics detection, hostile fire detection and localization systems, and laser warning receiver.

3225 JUL 2018 Use or disclosure of data contained on the page is subject to restrictions on title page.

-3-

(4) NGCV-OMFV will provide Chemical, Biological, Radiological, Nuclear, and Explosive (CBRN-E) protection IAW AR 70-75 and MIL-STD-2169.

(5) NGCV-OMFV will provide better signature management (passive/ acoustically/ visually/ electro- magnetically) than the Bradley M2A4. The vehicle should be significantly shorter (relative to vehicle height) and narrower than the M2A4 to facilitate urban operations.

(6) NGCV-OMFV cyber protection will meet assessment and authorization requirementsper DoDI 8500-Series (RMF), 5200.44, and 5200.39; and use NSA-approved crypto for wireless communications to prevent, mitigate, and recover capabilities. Must be capable of withstanding ATT 3-level cyber-attack Training Techniques andProcedures (TTPs).

(7) NGCV-OMFV will provide compartmentalization of all the vehicle stowed ammunition to protect the occupants from the hazardous effects of sympathetic detonation.

f. Growth. The NGCV-OMFV will possess sufficient size, weight, architecture, power, and cooling (SWAP-C) for automotive and electrical purposes to meet all platform needs and to allow for pre-planned product improvements while maintaining a 50% power and a 20% space and weight margin for subsequent future improvements. Electrical power and data transmission rates will support full integration with the Mission Command Tactical Network.

(1) The NGCV-OMFV will have a DoD Modular Open Systems Approach technical architecture for high and low voltage electronic systems with modularity for components likely to need upgrades over vehicle lifecycle (MIL-PRF-GCS600A compliant).

(2) The NGCV-OMFV will have the capability to perform Silent Watch (using battery power) for 6 hours (T), 12 hours (0).

(3) Command and Control. The NGCV-OMFV will integrate current and future ArmyMission Command and communication equipment IAW applicable U.S. Army guidelines.

g. Lethality. The NGCV-OMFV will be primarily armed with an XM-813 30mm medium caliber weapon system (MCWS) with a demonstrated preplanned product improvement pathway to the XM- 913 50mm MCWS using the Multi-Caliber Armament System (MCAS) fire control system in day/night and in all weather conditions while moving and/or stationary against moving and/or stationary targets.

Target effects will overmatch near peer threat weapon ranges (T). This can be government furnished equipment (GFE) lethal and non-lethal directed energy (0).

(1) MCWS target effects include: destroy (Tier 2) armored vehicles; destroy Anti-Tank Guided Missile (ATGM) teams; destroy/defeat dismounted infantry; destroy/defeat enemy in prepared positions (bunkers); penetrate concrete walls; provide behind wall/defilade effects and defeat Tier 1 vehicle sensors (optics, radar, etc.) at ranges and with P/H and P/K to be published in the CDD Classified Annex (T). Defeat active protection technology (0).

(2) Primary Armament and Ammunition. The MCWS is the primary weapon and will fire a suite of ammunition including armor piercing and multi-functionalexplosive rounds. It will carry three combat days of ready/stowed kills IAW ABCT OMS/MP for primary/ secondary guns. Ammunition will be GFE.

3325 JUL 2018 Use or disclosure of data contained on the page is subject to restrictions on title page.

-4-

(3) Commanders Independent Weapon Station (CIWS). The NGCV-OMFV will have simultaneous engagement functionality with a three person crew (T), two person crew (0 ), with an all weather, day/night CIWScapable of supporting up to a .50 caliber machine gun with a universal mount.

The CIWS will be effective while moving and/or stationary against moving and/or stationary targets. The CWIS will provide 85 degrees/-20 degrees elevation and depression (T=O).

(4) Multi-Purpose Guided Missile (MPGM). NGCV-OMFV will operate a "fire and forget" MPGM (Tier 1 tanks/bunkers/personnel) at x2 the current range (T); x3 current range (0). T w o MPGM's at theready to fire position with 2 reloads (T); 4 reloads (0).

(5) NGCV-OMFV will provide the ability for crew to hand-off targets (slew to cue), internally and externally and to send and receive target information from external platforms (dismounted Soldiers, UAS, UGX, other groundplatforms).

(6) A manned turret (T), man-accessible remotely operated turret (0), will have at least one hatch. The hatch(es) will be on top of the turret and accommodate U.S. Soldiers wearing combat gear.

Crew members will have the capability to reload, perform immediate action, and perform degraded operations (main weapon) from underarmor.

h. Sensors. NGCV-OMFV will integrate the Army's 3rd Generation Forward Looking Infra-red (3GF) for both the gunners' and commanders' sights. This will be government furnished equipment.

Alternative sights are acceptable if they meet or exceed 3GF capabilities.

i. Embedded Platform Training. Platforms should have embedded training systems that have interoperability with the Synthetic Training Environment (STE) to provide embedded precision gunnery training and collective level combined arms maneuver training capability.

j. Sustainability. Increase platform and component reliability, sustainability, and maintainability.

Demonstrate breakthroughs in power generation / management to increase operational range; fuel efficiency; silent watch capability, part and component reliability, and reduced sustainment burden for the ABCT formation.

Please direct all requirements related inquires to Mr JohnW. Miller Ill at john.w.miller.civ@mail.mil ,, and Ms Corey Richards at corey.l.richards5.civ@mail.mil.

Sincerely, avid A. Lespera ce' Brigadier General, U.S. Ar Director, NGCV CrossFunctio

3425 JUL 2018 Use or disclosure of data contained on the page is subject to restrictions on title page.

mailto:john.w.miller.civ@mail.mil mailto:gerald.a.boston.mil@mail.mil mailto:corey.l.richards5.civ@mail.mil

NGCV OMFV Industry Day
NGCV-OMFV Welcome
What Is NGCV?
Why Army Needs NGCV?
S&T Update for NGCV tech base efforts
S&T Update for NGCV tech base efforts
Strategic Capabilities Roadmap
NGCV OMFV Industry Day
OMFV Acquisition Concept
NGCV OMFV Bid Sample Test Overview
OMFV Acquisition Concept
OMFV Acquisition Concept
Industry Role in NGCV
Industry Role in NGCV
NGCV OMFV Industry Day
Questions & Answers from �Sources Sought Announcement
Q&A Review
Q&A Review
Q&A Review
Q&A Review
Q&A Review
Q&A Review
Q&A Review
Q&A Review
Q&A Review
Office of Small Business Programs
NGCV OMFV Industry Day
NGCV OMFV Industry Day Panel Q&A
NGCV OMFV Industry Day
NGCV OMFV Industry Day
Slide Number 31
Slide Number 32
Slide Number 33
Slide Number 34