Attachment_0015_-_BAP_Deprocessing_Checklist.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Bridge Erection Boat (BEB)
Solicitation number
w56hzv18r0134
Issued by

About this file

This document contains a deprocessing checklist for a Bridge Erection Boat (BEB) as well as details of a related federal contract opportunity. The checklist outlines steps for inspecting and inventorying key components of a M30 Bridge Erection Boat such as the winch assembly, rollers, hydraulic hand pump, and locks to ensure proper functioning and identify any damage. The related federal contract opportunity is a 5-year Firm-Fixed Price requirements contract being awarded on a sole source basis to Birdon America, LLC for M30 Bridge Erection Boats, crew protection kits, authorized stockage lists, special tools and test equipment, contractor support services, system technical support, training, fielding support, and boat care and storage. The contracting agency is the Department of the Army Materiel Command Contracting Command Detroit Arsenal.

BAP Decompressing Checklist

View the file

Other files

File Type Posted
JA_M30_Bridge_Erection_Boats_-_REDACTED.pdf PDF
W56HZV18R0134-0004.pdf PDF
Attachment_0024_-_Authorized_Stock_List_(08_Jan_2019).xlsx XLSX spreadsheet
W56HZV18R0134-0003.pdf PDF
Attachment_0025_-_Special_Tools_and_Test_Equipment.xlsx XLSX spreadsheet
Attachment_0024_-_Authorized_Stock_List.xlsx XLSX spreadsheet
Conformed_W56HZV18R0134.pdf PDF
W56HZV18R0134-0002.pdf PDF
Attachment_0001_-_ATPD_2393_25_Sept.docx DOCX document
W56HZV18R0134-0001.pdf PDF
Attachment_0009_-_ABCL_Template.XLSX XLSX spreadsheet
Attachment_0004_-_Contractor_Accountability_of_GFM.doc DOC document
Attachment_0014_-_BEB_Deprocessing_checklist.xls XLS spreadsheet
Attachment_0010_-_Government_Format_Production_TDP.docx DOCX document
Attachment_0023_-_DMSMS_Guidebook.pdf PDF
Attachment_0020_-_LMI_Packaging_Data_Products.doc DOC document
W56HZV-18-R-0134.pdf PDF
Attachment_0021_-_Incoming_Transaction_Format.doc DOC document
Attachment_0007_-__HTS_Template.xlsx XLSX spreadsheet
Attachment_0022_-_First_Article_Waiver_Worksheet.pdf PDF
Attachment_0006_-_Request_for_Use_of_BEB_Prohibited_Material.docx DOCX document
Attachment_0003_-_GFP.xlsx XLSX spreadsheet
Attachment_0008__-_Data_Delivery_Description_for_ECPs,_VECPs,_and_NORs.docx DOCX document
Attachment_0011_-_Provisioning_Requirements_Worksheet.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title Page

UNCLASSIFIED

Attachment 0015 - BAP Deprocessing Checklist

29 June 2018

Distribution Statement A: This is approved for public release: distribution is unlimited.

UNCLASSIFIED

BAP

M30 BAP DEPROCESSING CHECKLISTPage 1 of 1
BAP UII:Date Manufactured:
Action:Initials
BRIDGE ADAPTER PALLET DEPROCESSSING AND INVENTORY
Bridge Adapter Pallet Serial NO:
IUID Tag Present and accurate. Ie.. Correct PN, CAGE and Serial #
Basic Issue Items:
Hook BoatNSN: 2040-00-007-1136
Rope Lanyard AssyNSN: 4020-01-453-6292
Latch Pin AssemblyNSN: 5420-01-045-1770
Rope Fibrous 3/4 inNSN: 4020-00-018-2186
Pry BarNSN: 5120-00-224-1390
Wrench, Bay Drive PinNSN: 5420-01-030-5815
BAP PLS Feet (2ea)NSN: 8145-20-010-4968
Quick Release Pin (x4)NSN: 5315-01-457-2385
1). Disconnect hydraulic hoses from stowed position and inspect for damage. Stow hydraulic hoses.
2). Inspect winch frame locking levers. Disconnect pin and move locking lever to the unlock position and back to the locked position. Secure pin.
3). Inspect winch assembly for damage.
4). Inspect winch cable and hook for damage.
5). Inspect front Bay pin Lock assembly and air lines for damage
6). Inspect BAP locks and rear guides. a. Pull latch handle and lock rear guide in the mid and full open position. b. Inspect pads for damage
7). Inspect Cat Walk and Bay rollers for damage.
8). Inspect hydraulic hand pump for damage. a.Remove fill plug and check oil level. b.Operate pump in all positions and inspect for leaks
9). Inspect center roller for damage and proper operation.
10). Inspect transload roller assembly. Ensure rollers lock in the engaged and stowed positions.
NOTE
Any questions or suggested changes regarding the contents of this checklist should be addressed to PdM Bridging.
Deprocessing Performed by:DATE:
PM Representative Signature:DATE:

File details come from the government source that posted it. Updated .