Attachment_0006_-_Request_for_Use_of_BEB_Prohibited_Material.docx

DOCX document 18 KB Posted

Attached to
Bridge Erection Boat (BEB)
Solicitation number
w56hzv18r0134
Issued by

About this file

This document is a request form for a contractor to seek a waiver to use prohibited materials in the production of a Bridge Erection Boat (BEB) under solicitation number w56hzv18r0134. The contractor must provide details including an explanation of use, associated health hazards and required personal protective equipment, analysis of alternative materials considered and why they cannot be implemented, technical justification for why the prohibited material is necessary, and program risks associated with being denied the request. The contractor must also explain how the material would be eliminated from production if the waiver is not granted. The solicitation is for a 5-year firm-fixed price requirements contract valued at an undisclosed amount for M30 BEBs, crew protection kits, authorized stockage lists, special tools and test equipment, contractor support services, training, fielding support, and care and storage requirements. The award will be made on a sole source basis to Birdon America, LLC to support the Department of the Army Materiel Command Contracting Command Detroit Arsenal.

BEB Prohibited Material

View the file

Other files

File Type Posted
JA_M30_Bridge_Erection_Boats_-_REDACTED.pdf PDF
W56HZV18R0134-0004.pdf PDF
Attachment_0024_-_Authorized_Stock_List_(08_Jan_2019).xlsx XLSX spreadsheet
W56HZV18R0134-0003.pdf PDF
Attachment_0025_-_Special_Tools_and_Test_Equipment.xlsx XLSX spreadsheet
Attachment_0024_-_Authorized_Stock_List.xlsx XLSX spreadsheet
Conformed_W56HZV18R0134.pdf PDF
W56HZV18R0134-0002.pdf PDF
Attachment_0001_-_ATPD_2393_25_Sept.docx DOCX document
W56HZV18R0134-0001.pdf PDF
Attachment_0009_-_ABCL_Template.XLSX XLSX spreadsheet
Attachment_0004_-_Contractor_Accountability_of_GFM.doc DOC document
Attachment_0014_-_BEB_Deprocessing_checklist.xls XLS spreadsheet
Attachment_0010_-_Government_Format_Production_TDP.docx DOCX document
Attachment_0023_-_DMSMS_Guidebook.pdf PDF
Attachment_0020_-_LMI_Packaging_Data_Products.doc DOC document
W56HZV-18-R-0134.pdf PDF
Attachment_0021_-_Incoming_Transaction_Format.doc DOC document
Attachment_0007_-__HTS_Template.xlsx XLSX spreadsheet
Attachment_0015_-_BAP_Deprocessing_Checklist.xlsx XLSX spreadsheet
Attachment_0022_-_First_Article_Waiver_Worksheet.pdf PDF
Attachment_0003_-_GFP.xlsx XLSX spreadsheet
Attachment_0008__-_Data_Delivery_Description_for_ECPs,_VECPs,_and_NORs.docx DOCX document
Attachment_0011_-_Provisioning_Requirements_Worksheet.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56HZV-19-X-00XX

ATTACHMENT 0006

Request for Use of BEB Prohibited Material

29 June 2018

UNCLASSIFIED: Distribution Statement A. Approved for public release

CHANGES LOG

DATE
DESCRIPTION of CHANGE

1. General Information

Requesting Company

Date of Request

Point of Contact

BEB Prohibited material for which waiver is requested

2. Explanation of Use

Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon vehicle delivery. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.

3. Health Hazard

Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).

4. Analysis of Alternatives

Instructions: Identify all alternative which were considered for the prohibited material. If the alternative is only for specific applications, identify the type of parts it is a potential alternative for. Include explanation as to why each cannot be implemented.

5. Technical Justification

Instructions: Provide technical justification for the use of the BEB prohibited material. Explain why it is necessary and why it cannot be eliminated.

6. Program Risk

Instructions: Describe the program risk(s ) (cost, schedule, and performance) associated with denial of this request by the Government.

7. Get Well Plan

Instructions: Explain if and how you would eliminate the use of this prohibited material during production.

File details come from the government source that posted it. Updated .