Attachment_0015_-_BAP_Deprocessing_Checklist.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- W56HZV18R0134
About this file
This document contains a deprocessing checklist for a Bridge Adapter Pallet and details for a related federal contract opportunity. The checklist outlines steps for inspecting and inventorying key components of the Bridge Adapter Pallet such as the winch assembly, rollers, and hydraulic components. Technicians must initial each step to confirm completion.
The federal contract opportunity is a five-year Firm-Fixed Price requirements contract valued at an undisclosed amount. The U.S. Army Materiel Command is seeking products and services including M30 Bridge Erection Boats, crew protection kits, authorized stockage lists, special tools and test equipment, and contractor support representatives. Fielding support, OPNET and FLMNET training, and care and storage services are also required. The sole-source award will go to Birdon America, LLC. The response date is not provided. The contract aims to support the M30 Bridging system.
BAP Deprocessing Checklist
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV-18-R-0134.pdf | ||
| W56HZV-18-R-0134.pdf | ||
| Attachment_0023_-_DMSMS_Guidebook.pdf | ||
| Attachment_0006_-_Request_for_Use_of_BEB_Prohibited_Material.docx | DOCX document | |
| Attachment_0010_-_Government_Format_Production_TDP.docx | DOCX document | |
| Attachment_0011_-_Provisioning_Requirements_Worksheet.docx | DOCX document | |
| Attachment_0005_-_Government_IPT_List.xlsx | XLSX spreadsheet | |
| Attachment_0001_-_ATPD_2393.docx | DOCX document | |
| Attachment_0022_-_First_Article_Waiver_Worksheet.pdf | ||
| Attachment_0004_-_Contractor_Accountability_of_GFM.doc | DOC document | |
| Attachment_0021_-_Incoming_Transaction_Format.doc | DOC document | |
| Attachment_0009_-_ABCL_Template.XLSX | XLSX spreadsheet | |
| Attachment_0007_-__HTS_Template.xlsx | XLSX spreadsheet | |
| Attachment_0014_-_BEB_Deprocessing_checklist.xls | XLS spreadsheet | |
| Attachment_0003_-_GFP.xlsx | XLSX spreadsheet | |
| Attachment_0020_-_LMI_Packaging_Data_Products.doc | DOC document | |
| Attachment_0008__-_Data_Delivery_Description_for_ECPs,_VECPs,_and_NORs.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Page
UNCLASSIFIED
Attachment 0015 - BAP Deprocessing Checklist
29 June 2018
Distribution Statement A: This is approved for public release: distribution is unlimited.
UNCLASSIFIED
BAP
| M30 BAP DEPROCESSING CHECKLIST | Page 1 of 1 | |
| BAP UII: | Date Manufactured: | |
| Action: | Initials | |
| BRIDGE ADAPTER PALLET DEPROCESSSING AND INVENTORY | ||
| Bridge Adapter Pallet Serial NO: | ||
| IUID Tag Present and accurate. Ie.. Correct PN, CAGE and Serial # | ||
| Basic Issue Items: |
| Hook Boat | NSN: 2040-00-007-1136 |
| Rope Lanyard Assy | NSN: 4020-01-453-6292 |
| Latch Pin Assembly | NSN: 5420-01-045-1770 |
| Rope Fibrous 3/4 in | NSN: 4020-00-018-2186 |
| Pry Bar | NSN: 5120-00-224-1390 |
| Wrench, Bay Drive Pin | NSN: 5420-01-030-5815 |
| BAP PLS Feet (2ea) | NSN: 8145-20-010-4968 |
| Quick Release Pin (x4) | NSN: 5315-01-457-2385 |
| 1). Disconnect hydraulic hoses from stowed position and inspect for damage. Stow hydraulic hoses. | ||
| 2). Inspect winch frame locking levers. Disconnect pin and move locking lever to the unlock position and back to the locked position. Secure pin. | ||
| 3). Inspect winch assembly for damage. | ||
| 4). Inspect winch cable and hook for damage. | ||
| 5). Inspect front Bay pin Lock assembly and air lines for damage | ||
| 6). Inspect BAP locks and rear guides. a. Pull latch handle and lock rear guide in the mid and full open position. b. Inspect pads for damage | ||
| 7). Inspect Cat Walk and Bay rollers for damage. | ||
| 8). Inspect hydraulic hand pump for damage. a.Remove fill plug and check oil level. b.Operate pump in all positions and inspect for leaks | ||
| 9). Inspect center roller for damage and proper operation. | ||
| 10). Inspect transload roller assembly. Ensure rollers lock in the engaged and stowed positions. | ||
| NOTE | ||
| Any questions or suggested changes regarding the contents of this checklist should be addressed to PdM Bridging. | ||
| Deprocessing Performed by: | DATE: | |
| PM Representative Signature: | DATE: |
File details come from the government source that posted it. Updated .