Text version
EMD Test Schedule
TBD
LRIP Test Schedule
TBD
RCIS I EMD LRIP Test Articles
| RCIS Type I EMD/LRIP Test Matrix | |||||||
| GFE to SAC Contractor | SAC Contractor Role | Test Article Qty | GOV Test site Location | Delivery Date | Test Article Refurbishment | Comments | |
| EMD Contract Award | 1 QTY HMEE-I + 1 QTY MPCV | Utilize GFE vehicles to support PDR | Contractor will deliver a total of 7 QTY SAC systems, of which 6 QTY (SAC systems) will be integrated on RCIS Type I Systems or RCIS Type I Systems w/SCVs | ||||
| GOV SIL | Contractor ships 1 QTY SAC system to support Government SIL | 1 QTY RCIS Type I System | TACOM Warren | Prior to CDR | This does not include any vehicles, Contractor is only providing SAC B-Kit, laboratory cables and other necessary equipment/components | ||
| Design & Integration | 5 QTY HMEE-I + 2 QTY MPCV + 3 QTY SCV | Contractor integrates 6 QTY SAC Systems to yield 3 QTY RCIS Type I System + 3 QTY RCIS Type I System w/SCV | Control Vehicle Mitigation Plan is to utilize surrogate (M1114/RG-31) control vehicles (SCV) incase MPCVs are not available. | ||||
| Contractor Shakedown Test | 3 QTY RCIS Type I System + 3 QTY RCIS Type I System w/SCV | All vehicle sets will undergo Contractor shakedown testing prior to Government delivery to (Government) test sites | |||||
| Contractor Facility Vehicle | Contractor maintains 1 QTY RCIS Type I System w/SCV per approved baseline configuration | Contractor Facility vehicle will be used for troubleshooting, Logistics support and maintenance of approved baseline configuration. | |||||
| RAM | Contractor ships vehicles to Government test site location with FSR support | 1 QTY RCIS Type I System + 1 QTY RCIS Type I System w/SCV | Aberdeen Test Center (ATC), Aberdeen Proving Ground (APG), MD | ||||
| PPQT | Contractor ships vehicles to Government test site locations with FSR support | 2 QTY RCIS Type I System + 1 QTY RCIS Type I System w/SCV | 1) Performance - ATC, APG, MD | ||||
| 2) Electromagnetic Environmental Effects (E3) - White Sands Test Center, White Sands, NM | |||||||
| 3) Option A: Environmental Effects - Yuma Proving Ground, AZ | |||||||
| 3) Option B: Environmental Effects - Cold Region Test Center, Ford Greely, AK | |||||||
| 4) Dugway Proving Ground (CBDRN Decontamination and Compatibility Paper Study), Dugway Proving Ground, UT | |||||||
| LUT | Contractor refurbishes 2 QTY RCIS Type I System to 10/20 Standard prior to LUT | 2 QTY RCIS Type I System | TBD; potentially FT. Hood | 2 QTY RCIS Type I prior to LUT | LUT requires 2 QTY RCIS Type I System System per OMS-MP. 2 QTY Husky Mounted Detected Systems required per MSCoE. | ||
| Total EMD Shipment for GOV testing | 3 QTY RCIS Type I System + 2 QTY RCIS Type I System w/SCV | Contractor facility vehicle excluded from total, but can be repurposed for government performed testing if needed |
| LRIP Contract Award | Contractor produces and delivers LRIP versions of the RCIS Type I Systems | ||||
| Contractor Facility Vehicle | Contractor maintains 1 QTY RCIS Type I System w/SCV per approved baseline configuration | Contractor Facility vehicle will be used for troubleshooting and Logistics support. | |||
| PQT | 2 QTY RCIS Type I System | 1) Performance - ATC, APG, MD | Assumes that PQT vehicle cannot be repurposed for IOT (no refurbishment) | ||
| 2) E3 - White Sands Test Center, White Sands, NM | |||||
| 3) Environmental Effects - Yuma Test Center, Yuma Proving Ground, AZ | |||||
| RAM | 4 QTY RCIS Type I System | ATC, APG, MD | LRIP RAM test articles increased to 4 HMEE-Is and 4 MPCVs w/SAC system based off the following: (1) The limited availability of MPCVs during EMD testing may not generate sufficient RAM test runs (2) Having 4 test articles may be necessary due to the short length of our PQT phase (per RCIS Type I program schedule on 19MAR2015) or else RAM will parellel PQT, LOG Demo and IOT | ||
| LOG Demo | 1 QTY RCIS Type I System | Need to confirm vehicle qty and configuration with ALUGS LOG | |||
| IOT | Contractor shall refurbish 11 QTY RCIS Type I Systems to 10/20 Standard after competion of IOT | 4 QTY RCIS Type I System | TBD; potentially Ft. Hood | Yes, after completion of IOT | Based off OTC estimate from Cathy Miller; used HMDS as reference. Need to cross-check OMS/MP for test article quantity. |
| Total LRIP Shipment to Gov test site locations | 11 QTY RCIS Type I System | Contractor facility vehicle excluded from total, but can be repurposed for government performed testing if needed |
| Key | |
| Nomenclature | Definition |
| RCIS Type I System | |
| SAC System | |
| RCIS Type I System w/SCV | A Surrogate Control Vehicle (SCV) can be any military vehicle (i.e., HMMWV M1114, RG-31, FMTV, etc). |
EMD Test Assumptions
TBD
LUT Activities
TBD
IOT Activities
TBD
Contractor Test Support
| Contractor Test Support | |
| Contractor System Support Package (SSP) required all test phase | Spare and Repair Parts |
| Technical Manuals | |
| Test Site Personnel operator and maintenance training | |
| Field Service Representative (FSR) | |
| Vehicle Deprocessing | |
| SSP established at Aberdeen Test Center, MD and Yuma Test Center, AZ | |
| Support of Western Test Sites (Electronic Proving Ground, AZ, White Sands Missle Range, NM and Dugway Proving Ground) out of Yuma | |
| XXXXX Cold Regions Test Center, AK, and Tropic Regions Test Center | |
| Operational Test Support | Operator and New Equipment (NET) provided to Soldier test participants for LUT during EMD |
| Spare and Repair Parts package provided to test site for LUT and IOT (location TBD) | |
| Maintenance of all RCIS Type I System & RCIS Type I System w/SCV during LUT. Organic unit Maintenance during IOT. | |
| Operator and Field Level Maintenance NET provided to Soldier test participants for IOT during LRIP | |
| Other Contractor Support | Safety Assessment Report (SAR) on RCIS Type I system ---what about SCV? |
| Tranportability analysis and report on RCIS Type I system and RCIS Type I system w/SCV | |
| Support to all Test IPT meetings and Test Readiness Reviews | |
| Test Incident Report (TIR) response and Failure Analysis Corrective Action Report development. | |
| Refurbish 2 QTY RCIS Type I System to 10/20 Standard prior to LUT | |
| Refurbish all RCIS Type I systems after IOT |
Test Site Shipping Address
| Test Site | Shipping Address |
| Aberdeen Test Center (APG) | US ARMY Aberdeen Test Center (XXXXXX) |
| ATTN: TEDT-AT-ADF | |
| 400 Colleran Road | |
| Aberdeen Proving Ground, MD 21005-5059 | |
| Yuma Test Center (YPG) | Commander (XXXXXX) |
| US ARMY Yuma Proving Grounds | |
| Transportation Office, BLDG 2660 | |
| ATTN: TEDT-YPY-CAC | |
| Yuma, AZ 85365 | |
| White Sands Missle Range (WSMR) | Commander US Army White Sands Missle Range (XXXXX) |
| ATTN: TEDT-WSV-N | |
| BLDG 21225 | |
| White Sands Missile Range, NM 88002-5158 | |
| Electronic Proving Ground (EPG(EPG)) | Electronic Proving Ground |
| E3 Facility | |
| ATTN: TEDT-EP-SEA | |
| Ft. Huachuca, AZ 85613-7063 | |
| FT Hood | PdM ALUGS Fielding Team (XXXXX) |
| UMFP Warehouse Bldg 88004 Clark Road & Logistics Lane | |
| Ft. Hood, TX 76544-6000 |
image1.png image2.png