Attachment_0006_-_RCIS_Type_I_Work_Breakdown_Structure_(WBS).xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Route Clearance Interrogation System (RCIS)
Solicitation number
W56HZV15R0156
Issued by

About this file

Draft RCIS Attachment 0006

View the file

Other files

File Type Posted
FCL_Sponsorship_Letter_OCT15.pdf PDF
FCL_Notice.docx DOCX document
FCL_Orientation_Handbook_18FEB15.pdf PDF
Q&A_Tracker_2-23-17.pdf PDF
Q&A_Tracker_12-29-16.pdf PDF
RCIS_Vehicle_Viewing_Pictures__HMEE_CAD_Models_and_Data_Information.pdf PDF
RCIS_Acq_Strategy_Notice_Revision_2.pdf PDF
Attachment_0037_-_Small_Business_Participation_Workbook_10-13-16.xlsx XLSX spreadsheet
Attachment_0054_-_Certification_of_Small_Business_Size_and_Socioeconomic_Status_for_Subcontractors.docx.pdf PDF
Attachment_0036_-_Small_Business_Participation_Workbook_Instructions__R2.pdf PDF
RCIS_Type_I_Vehicle_Viewing_Participants.pdf PDF
Q A_Tracker_Batch_1.pdf PDF
RCIS_Type_I_Vehicle_Viewing_Invitation_Revision_1.docx DOCX document
RCIS_Type_I_Vehicle_Viewing_Invitation.pdf PDF
Questions_and_Comments_from_Industry_on_the_Route_Clearance__Interrogation_System_(RCIS)_Program.pdf PDF
Pre-Solicitation_Conference_List_of_Attendees.pdf PDF
JCB_Organizational_Conflict_of_Interest.pdf PDF
RCIS_Pre-Solicitation_Conf_Slides.pdf PDF
One-on-One_Questions.pdf PDF
Attachment_0044_-_Soldier_Workload_Instructions.docx DOCX document
Attachment_0043_-_HFEA_Instructions.docx DOCX document
Attachment_0032_-_SSv_Severity_Scale.ppt PPT presentation
Attachment_0048_-_HSI_Event_Report_Instructions.docx DOCX document
Attachment_0038_-_Equipment_Publications_Defects_List.doc DOC document
Attachment_0036_-_Small_Business_Participation_Workbook_Instructions.docx DOCX document
Attachment_0045_-_HSIP_Instructions.docx DOCX document
Attachment_0039_-_TM_Crosswalk.xls XLS spreadsheet
Attachment_0046_-_DOORS_DPA_Format.docx DOCX document
Attachment_0022_-_Production_Contractor_Format_Technical_Data_Package_(TDP).docx DOCX document
Attachment_0023_-_Production_Government_Format_Technical_Data_Package_(TDP).docx DOCX document
Attachment_0011_-_Performance_Work_Statement_Applicable_Documents.docx DOCX document
Attachment_0007_-_Performance_Work_Statement_Acronyms.docx DOCX document
RCIS_Type_I_CDRL.pdf PDF
RCIS_Type_I_PWS.pdf PDF
Attachment_0018_-_RCIS_Type_I_Test_Summary.xlsx XLSX spreadsheet
Attachment_0008_-_Government_Furnished_Property_(GFP)_List.pdf PDF
Attachment_0020_-_Hardware_Software_List.xls XLS spreadsheet
Attachment_0014_-_UGV_Interoperability_Profile_(IOP).pdf PDF
Attachment_0024_-_DD_254_RCIS_Type_I_W56HZV-15-R-0156.pdf PDF
RCIS_Acq_Strategy_Notice_Revised.pdf PDF
Postponed_Announcement_-_RCIS_Pre-Solicitation_Conference.docx DOCX document
Postponed_Announcement_-_RCIS_Pre-Solicitation_Conference.docx DOCX document
RCIS_Pre-Solicitation_Conf_Invitation_(Revision_1).docx DOCX document
RCIS_Pre-Solicitation_Conf_Invitation.docx DOCX document
RCIS_Acq_Strategy_Notice_2016.docx DOCX document
attach0006.XLSX XLSX spreadsheet
attach0016.pdf PDF
attach0010.docx DOCX document
EMD-SOW.pdf PDF
attach0008.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RCIS WBS - EMD

(U) Route Clearance & Interrogation Systems (RCIS) Type I
Work Breakdown StructureRCIS Scope of Work Reference
L1L2L3L4L5L6
1Route Clearance & Interrogation Systems (RCIS) Type ISection C.1
1.1D-HMEE and Control Vehicle - GFE/GFISection C.14
1.1.1Delta - High Mobility Engineer Excavator (D-HMEE)
1.1.2Buffalo Mine-Protected Clearance Vehicle (MPCV)
1.2R-HMEE with Semi-Autonomous Control (SAC) System (UGV specific)Section C.15
1.2.1Integration, Assembly, Test and Checkout
1.2.2Mobile Base Unit (MBU) A-Kit
1.2.3Mobile Base Unit (MBU) B-Kit
1.2.4Operator Control Unit (OCU) A-Kit
1.2.5Operator Control Unit (OCU) B-Kit
1.3Secondary Vehicle
1.4Systems EngineeringSection C.4
1.4.1Systems Engineering Process
1.4.2Requirements Analysis
1.4.3Functional Analysis
1.4.4Configuration ManagementSection C.7
1.4.5Risk ManagementSection C.9
1.4.6Interface Management
1.4.7Technical Reviews
1.4.8Trade Studies
1.4.9Modeling and Simulation
1.4.10Metrics/TPMs
1.4.11Architectures
1.4.12Specialty Engineering
1.4.12.1CybersecuritySection C.6
1.4.12.2Reliability and MaintainabilitySection C.10
1.4.12.3Environment, Safety and Occupational Health (ESOH)Section C.11
1.4.12.4Human Systems Integration (HSI)Section C.12
1.4.12.5Manufacturing and Production ReadinessSection C.17
1.4.12.6Quality / Product AssuranceSection C.18
1.4.13Software EngineeringSection C.5
1.4.14Integrated Life Cycle Cost
1.4.15Program ProtectionSection C.19, C.20
1.5Program ManagementSection C.2, C.3
1.6System Test and EvaluationSection C.16
1.7Supportability / Integrated Logistics Support (ILS)Section C.13
1.8DataSection C.8
1.8.1Technical Publications
1.8.2Engineering Data
1.8.3Management Data
1.8.4Support Data
1.8.5Data Depository
1.9Peculiar Support Equipment
1.9.1Test and Measurement Equipment
1.9.2Support and Handling Equipment
1.10Common Support Equipment
1.11Operational/Site Activation
1.12Industrial Facilities
1.13Initial Spares and Repair PartsSection C.13
L1L2L3L4L5L6

DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.

UNCLASSIFIED

WBS with Description of Work

(U) Route Clearance & Interrogation Systems (RCIS) Type I
Work Breakdown StructureRCIS SOW ReferenceDescription of Work
L1L2L3L4L5L6
1Route Clearance & Interrogation Systems (RCIS) Type ISection C.1The RCIS Type I program element refers to the total complement of equipment, software, data, services, facilities, training, management, integration and support representing the complete RCIS Type I. Efforts include all services and functions of engineering and management.

The RCIS Type I will equip the Delta - High Mobility Engineer Excavator (D-HMEE) and Control Vehicle with a Semi-Autonomous Control (SAC) system. The RCIS-HMEE or R-HMEE (i.e. D-HMEE with integrated SAC system) can be operated in the manned and unmanned modes enabling a Soldier to excavate, interrogate, and classify deep buried explosive hazards, IEDs, and caches in a wide range of road surfaces and soil conditions as well as neutralize explosive hazards by scooping, lifting, and moving them from routes.

In the unmanned mode, the SAC System enables a Soldier to use the OCU while seated at a workstation in a Control Vehicle to control the automotive and interrogation functions of the R-HMEE. The operator is also able to remove the OCU from the Control Vehicle and move to another Control Vehicle or control the R-HMEE while dismounted.

1.1 D-HMEE and Control Vehicle - GFE/GFI Section C.14 The D-HMEE and Control Vehicles are provide by the Government.

1.1.1 Delta - High Mobility Engineer Excavator (D-HMEE) The D-HMEE has a combination of mechanical, hydraulic and electrical systems that implement automotive and interrogation functions. The By-Wire control of the HMEE vehicle provides a digital interface for the SAC System to control these functions. When equipped with the SAC System, the D-HMEE retains its original manned operation and continues to meet original manned performance requirements.

1.1.2 Buffalo Mine-Protected Clearance Vehicle (MPCV) The Control Vehicle will be the Buffalo Mine-Protected Clearance Vehicle (MPCV). The Control Vehicle will continue to meet its original manned performance requirements.

1.2 R-HMEE with Semi-Autonomous Control (SAC) System (UGV specific) Section C.15 The SAC System employs an A-Kit / B-Kit methodology intended to adapt common components to unique vehicle structures. The SAC System consists of a Mobile Base Unit (MBU) A-Kit and B-Kit on the R-HMEE and an OCU A-Kit and B-Kit on the Control Vehicle.

1.2.1 Integration, Assembly, Test and Checkout The Integration, Assembly, Test and Checkout element includes all effort of technical and functional activities associated with the structures, equipment, parts, materials, and software required to assemble the level 3 equipment (hardware/software) elements into a level 2 R-HMEE as a whole. It refers to all efforts associated with system integration of SAC System components onto the R-HMEE and Control Vehicle.

1.2.2 Mobile Base Unit (MBU) A-Kit The MBU A-Kit consists of brackets, cables and other equipment that integrates the MBU B-Kit into the R-HMEE.

1.2.3 Mobile Base Unit (MBU) B-Kit The MBU B-Kit consists of an MBU, vehicle camera(s), classification equipment, communications, and other equipment to provide control of the R-HMEE. While considered part of the MBU B-Kit, the classification equipment can function without the MBU to support operations in the manned mode.

1.2.4 Operator Control Unit (OCU) A-Kit The OCU A-Kit consists of brackets, cables and other equipment that integrates the OCU B-Kit into the Control Vehicle.

1.2.5 Operator Control Unit (OCU) B-Kit The OCU B-Kit consists of an OCU (with controls, video display, and head aimed control viewer), communications, and other equipment to control the R-HMEE. The OCU B-Kit is intended to be removable to enable control of the R-HMEE from another Control Vehicle and during dismounted operations.

1.3 Secondary Vehicle Not used.

1.4 Systems Engineering Section C.4 The System Engineering element refers to the technical and management efforts of directing and controlling a total integrated effort of the RCIS Type I program. This element encompasses the system engineering effort and individual elements below, as appropriate, to define the system and the integrated planning and control of the technical program efforts of design engineering, specialty engineering, software engineering and program protection.

1.4.1 Systems Engineering Process The element encompasses repeatable processes that are documented, maintained, and controlled by the organization as a basis for common usage and tailoring throughout the organization. A defined process is well characterized and understood, and is described in terms of standards, tools, and methods.

1.4.2 Requirements Analysis This element is for the effort that establishes the technical requirements the system must meet in order to meet the needs considering all requirements and constraints over the entire life-cycle of the system.

1.4.3 Functional Analysis Determination of the functions and their sequence and interdependence required to accomplish objectives, and the relating of requirements to the functions upon which they impact.

1.4.4 Configuration Management Section C.7 This element is for controlling the storage, accesses and changes to discrete, defined, related parts, models or information about the system at any time during its development.

1.4.5 Risk Management Section C.9 This element includes management oversight, administration and training of overall program risk management which encompasses identification, assessment, handling, and monitoring. Includes administration of the program risk management tools, and program level risk status and analysis with respect to technology, schedule and cost.

1.4.6 Interface Management Development and control of specifically defined physical, functional, hardware and software interfaces between two or more configuration items. This includes all interfaces to the D-HMEE and Control Vehicles.

1.4.7 Technical Reviews These are the systems engineering activities by which the technical progress of the RCIS program is assessed relative to its technical or contractual requirements. These are conducted at logical transition points in the development effort to reduce risk by identifying and correcting problems and issues resulting from the work completed. These provide a method for the Contractor and Government to determine that the development of the system and its documentation have met contract requirements.

1.4.8 Trade Studies This element refers to the decision-making activities that selects from alternative solutions on the basis of overall benefit to the system. Includes objective evaluation of alternative requirements, architectures, design approaches, or solutions using identical ground rules and criteria.

1.4.9 Modeling and Simulation This element refers to the design, development, fabrication, evaluation and demonstration of vehicle capabilities via computer modeling, manned and unmanned simulators, and segment and system models.

1.4.10 Metrics/TPMs This element refers to the management of assessed performance measurements which estimate through engineering analyses, or measured through tests, the value of essential performance parameters of the current design and forecasts the values to be obtained through the planned technical approach.

1.4.11ArchitecturesThis element is the development of the hierarchically structure of components, their interrelationships, and the principle guidelines governing their design and evolution over time, including a logical or physical representation which depicts its structure.
1.4.12Specialty EngineeringSpecialty functions integrated under this WBS element include: Cybersecurity, Reliability and Maintainability (R&M), Environment, Safety and Occupational Health (ESOH), Human Systems Integration (HSI), Manufacturing and Production Readiness, and Quality / Product Assurance.

1.4.12.1 Cybersecurity Section C.6 Appropriate administrative, technical, and physical safeguards to protect all Government data, to ensure the confidentiality, integrity, and availability of Government data.

1.4.12.2Reliability and Maintainability (R&M)Section C.10This element is the overall R&M program for both hardware and software to achieve the reliability and maintainability requirements.
1.4.12.3Environment, Safety and Occupational Health (ESOH)Section C.11This element contains all ESOH program activities.
1.4.12.4Human Systems Integration (HSI)Section C.12This element addresses Human Systems Integration (formerly MANPRINT) and human factors engineering activities.
1.4.12.5Manufacturing and Production ReadinessSection C.17This element addresses manufacturing and obsolescence management activities.
1.4.12.6Quality / Product AssuranceSection C.18This element addresses quality and product assurance activities.
1.4.13Software EngineeringSection C.5System level software engineering activities included under this WBS element are: coordinated software planning, providing a common software engineering environment, defining a system level software architecture, software development, and performing system software technical oversight activities.
1.4.14Integrated Life Cycle CostThis element captures system engineering activities to support life cycle costs estimates for the RCIS Type I.
1.4.15Program ProtectionSection C.19, C.20The Program Protection element refers to the effort necessary for the functions to manage security-related requirements and needs for the RCIS Program at the system and segment level. The responsibilities shall include all security aspects of planning, scheduling, funding, staffing, training, communicating, data processing to include clearance of public releasable information.

1.5 Program Management Section C.2, C.3 The business and administrative planning, organizing, directing, coordinating, controlling, and approval actions designated to accomplish overall program objectives, which are not associated with specific hardware elements and are not included in systems engineering.

1.6 System Test and Evaluation Section C.16 The test element refers to all activities that provide information for the verification, validation, and evaluation of test assets. This includes subsystem and brassboard level testing up to and including system level tests conducted by the Contractor and Government. Test activities include all verification methods in the contract (Analysis, Demonstration, Inspection, Test, and Certification). Includes Contractor support for Government test activities.

1.7 Supportability / Integrated Logistics Support (ILS) Section C.13 This element refers to integrated lifecycle logistics management, products, and services required to design, develop, assemble, integrate, field, sustain, upgrade and test the supportability processes and supporting automated applications for the system.

1.8 Data Section C.8 The deliverable data required to be listed on a contract data requirements list, DD Form 1423.

1.8.1 Technical Publications Technical data, providing instructions for installation, operation, maintenance, training, and support, formatted into a technical manual.

1.8.2Engineering DataRecorded scientific or technical information (regardless of the form or method of recording) including computer software documentation. Engineering data defines and documents an engineering design or product configuration (sufficient to allow duplication of the original items) and is used to support production, engineering and logistics activities.
1.8.3Management DataThe data items necessary for configuration management, cost, schedule, contractual data management, program management, etc.

1.8.4 Support Data The data items designed to document support planning in accordance with functional categories.

1.8.5 Data Depository The facility, including storage requirements, designated to act as custodian to maintain a master engineering specification and establish a drawing repository service for Government approved documents that are the property of the U.S. Government. As custodian for the Government, the repository, authorized by approved change orders, maintains these master documents at the latest approved revision level. This facility is a distinct entity that may hold electronic or hard copy data.

1.9 Peculiar Support Equipment The design, development, and production of those deliverable items and associated software required to support and maintain the system or portions of the system while the system is not directly engaged in the performance of its mission, and which are not common support equipment.

1.9.1 Test and Measurement Equipment The peculiar or unique testing and measurement equipment that allows an operator or maintenance function to evaluate operational conditions of a system or equipment by performing specific diagnostics, screening or quality assurance effort at an organizational, intermediate, or depot level of equipment support.

1.9.2 Support and Handling Equipment The deliverable tools and handling equipment used for support of the system.

1.10 Common Support Equipment The items required to support and maintain the system or portions of the system while not directly engaged in the performance of its mission, and which are presently in the DoD inventory for support of other systems.

1.11 Operational/Site Activation This element includes the costs associated with shipping costs to the site, site survey, site preparation, equipment installation, equipment integration, test and checkout. This should cover only those efforts that are incurred at the implementation site.

1.12 Industrial Facilities The construction, conversion, or expansion of industrial facilities for production, inventory, and contractor depot maintenance.

1.13 Initial Spares and Repair Parts Section C.13 The deliverable spare components, assemblies and subassemblies used for initial replacement purposes.

L1 L2 L3 L4 L5 L6

UNCLASSIFIED

File details come from the government source that posted it. Updated .