attach0010.docx

DOCX document 27 KB Posted

Attached to
Route Clearance Interrogation System (RCIS)
Solicitation number
W56HZV15R0156
Issued by

About this file

Attachment 0010 - RCIS Pre-TRR Checklist

View the file

Other files

File Type Posted
FCL_Sponsorship_Letter_OCT15.pdf PDF
FCL_Notice.docx DOCX document
FCL_Orientation_Handbook_18FEB15.pdf PDF
Q&A_Tracker_2-23-17.pdf PDF
Q&A_Tracker_12-29-16.pdf PDF
RCIS_Vehicle_Viewing_Pictures__HMEE_CAD_Models_and_Data_Information.pdf PDF
RCIS_Acq_Strategy_Notice_Revision_2.pdf PDF
Attachment_0037_-_Small_Business_Participation_Workbook_10-13-16.xlsx XLSX spreadsheet
Attachment_0054_-_Certification_of_Small_Business_Size_and_Socioeconomic_Status_for_Subcontractors.docx.pdf PDF
Attachment_0036_-_Small_Business_Participation_Workbook_Instructions__R2.pdf PDF
RCIS_Type_I_Vehicle_Viewing_Participants.pdf PDF
Q A_Tracker_Batch_1.pdf PDF
RCIS_Type_I_Vehicle_Viewing_Invitation_Revision_1.docx DOCX document
Questions_and_Comments_from_Industry_on_the_Route_Clearance__Interrogation_System_(RCIS)_Program.pdf PDF
JCB_Organizational_Conflict_of_Interest.pdf PDF
Pre-Solicitation_Conference_List_of_Attendees.pdf PDF
RCIS_Pre-Solicitation_Conf_Slides.pdf PDF
One-on-One_Questions.pdf PDF
Attachment_0044_-_Soldier_Workload_Instructions.docx DOCX document
Attachment_0043_-_HFEA_Instructions.docx DOCX document
Attachment_0045_-_HSIP_Instructions.docx DOCX document
Attachment_0039_-_TM_Crosswalk.xls XLS spreadsheet
Attachment_0046_-_DOORS_DPA_Format.docx DOCX document
Attachment_0032_-_SSv_Severity_Scale.ppt PPT presentation
Attachment_0048_-_HSI_Event_Report_Instructions.docx DOCX document
Attachment_0038_-_Equipment_Publications_Defects_List.doc DOC document
Attachment_0036_-_Small_Business_Participation_Workbook_Instructions.docx DOCX document
Attachment_0023_-_Production_Government_Format_Technical_Data_Package_(TDP).docx DOCX document
Attachment_0021_-_Developmental_Contractor_Format_Technical_Data_Package_(TDP).docx DOCX document
Attachment_0006_-_RCIS_Type_I_Work_Breakdown_Structure_(WBS).xlsx XLSX spreadsheet
Attachment_0011_-_Performance_Work_Statement_Applicable_Documents.docx DOCX document
Attachment_0007_-_Performance_Work_Statement_Acronyms.docx DOCX document
RCIS_Type_I_PWS.pdf PDF
RCIS_Type_I_CDRL.pdf PDF
Attachment_0018_-_RCIS_Type_I_Test_Summary.xlsx XLSX spreadsheet
Attachment_0014_-_UGV_Interoperability_Profile_(IOP).pdf PDF
Attachment_0024_-_DD_254_RCIS_Type_I_W56HZV-15-R-0156.pdf PDF
Attachment_0008_-_Government_Furnished_Property_(GFP)_List.pdf PDF
RCIS_Acq_Strategy_Notice_Revised.pdf PDF
Postponed_Announcement_-_RCIS_Pre-Solicitation_Conference.docx DOCX document
Postponed_Announcement_-_RCIS_Pre-Solicitation_Conference.docx DOCX document
RCIS_Pre-Solicitation_Conf_Invitation_(Revision_1).docx DOCX document
RCIS_Acq_Strategy_Notice_2016.docx DOCX document
RCIS_Pre-Solicitation_Conf_Invitation.docx DOCX document
attach0006.XLSX XLSX spreadsheet
EMD-SOW.pdf PDF
attach0008.pdf PDF
attach0018.docx DOCX document
attach0012.xlsx XLSX spreadsheet
attach0016.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0010

Pre-Test Readiness Review(TRR) Checklist

15 AUG 2014

Distribution Statement A – Approved for Public Release; distribution unlimited

1 PURPOSE

The Test Readiness Review (TRR) process will assess the readiness of the RCIS Type 1 vehicles to enter the formal testing event. The Pre-TRR and TRR will assesses the status of planning for and capability to conduct a given test event, to include available resources and other requirements. This process allows key FP leadership and stakeholders to assess whether RCIS Type 1 test vehicles, personnel, ranges, and test resources are ready to be committed to Government Vehicle Testing with safe and manageable risks. The process begins with a Pre-TRR meeting with the Contractor and concludes with a formal Government TRR meeting and a recommendation which is provided to Force Projection (FP) Product Manager (PdM) Applique and Large Unmanned Ground Systems (ALUGS).

1.1 COMPLETION OF CHECKLIST

The Pre-TRR Checklist will be considered completed when the items in the Checklist have been satisfactorily completed, key issues addressed, and there are no unresolved items.

Attachment 0010 Pre-Test Readiness Review (TRR) Checklist

Vehicle Test Readiness

Section
Criteria
Responsibility
Status
Comment/Mitigation
1.0
Introductions/Purposes
1.1
Stated purpose of Government Test events
PM T&E
2.0
Vehicle Configuration
Contractor
2.1
Configuration of the System is consistent with the defined product baseline IAW CDRL A026 (Configuration Report)
3.0
CDRLs Status
Contractor
3.1
All CDRL submissions and updates required by Pre-TRR have been delivered.
4.0
Contractor Verification Test Results/Corrective Actions
Contractor
4.1
Shakedown Testing is complete IAW RCIS SOW C.17.1
4.2
All failures identified during shakedown have been addressed and documented in Contractor Test Inspection Report (CDRL A062)
4.3
All known residual catastrophic failures and safety issues identified during shakedown and RCIS system testing have been corrected.
4.4
Test Report of Contractor shakedown test results
5.0
Government Inspection Results/Certifications
5.1
The RCIS Type 1 vehicles have been inspected (not tested) for adherence to the RCIS P-Spec requirements. The RCIS Type 1 vehicles must pass the inspections for these requirements to be deemed acceptable for test. Some of these inspections will need to occur during build.
DCMA/Contractor
5.2
RCIS Type 1 vehicles have been inspected IAW the RCIS P-Spec and prepared for shipment.
Contractor
5.4
Kits have been inspected, are complete, and ready for shipment.
DCMA/Contractor
5.5
RCIS Type 1 vehicle inspections, certifications, and analyses have been completed and submitted.
DCMA/Contractor
5.6
Unapproved Hazardous Materials are not present in the RCIS Type 1, IAW the materials detailed in SOW reference.
DCMA/Contractor
6.0
Test Support
Contractor
6.1
Field Service Representatives (FSRs) are identified and ready to support testing at designated locations.
6.2
Logistics limitations and risks associated with them have been identified and mitigated.
6.3
All Basic Issue Items (BII) are complete and ready for shipment with the vehicle.
6.4
Program of Instruction has been reviewed, approved and available IAW CDRL A052 (Program of Instruction)
6.5
Operators' Manuals are complete, delivered, and meet SOW to support tests.
7.0
Safety Assessment Reports/Concerns
Contractor
7.1
Contractors Safety Assessment has been completed and accepted by the Program Office.
8.0
System Delivery Schedule
Contractor
8.1
Delivery schedule has been provided and is on track with contract requirements.