2x100kW Generators will power 1 Dining Facility Shelter (Tent)
B: 2 Laundry containers
1x60kW Generator will power
D: 4 wooden buildings on the COP's with 120kw heaters
1x100kW Generator will power A: 3 Shower containers
EQUIPMENT
3x120kW Heaters
1 Dining Facility Building
1x25kW Heater
1x120kW Heater
1x40kW Generator will power
1 Tent
1 Shower container
1 Laundry container
1 Hand Wash Station 1 Dining Facility Shelter
(Tent)
C: 2 buildings on the FOB's
A: 2 Shower containers
B: 1 Laundry container
C: 3 buildings on the FOB's
Up to 500 personal
Up to 500 personal
Will heat 1 tent
A: Will heat 1 building on the FOB's
A: 6 tents ( GP medium size) with 6 25kW heaters
B: 1 Shower container
B: Will heat 1 Wooden building on the COP
Will heat 1 Dining Facility Shelter (Tent)
Up to 20 personal
Camp Building Guide
What it will cover
Up to 15 personal
Up to 125 personal (1 trailer = 6 shower heads)
Up to 150 personal (1 trailer = 5 Washer and 5 Dryer)
Hard Building 945 has no power
FOB East
Layout
2 laundry's can be powered from the grid on the FOB
6 showers can be powered from the grid on the FOB
Anything over 6 showers and 2 laundry's needs generation, 100kW.
There are 110 tent pads with frames for GP medium tents and power
Needed for contracted support to build camp with max of 1600 personal
3xDining Facility Shelters 6x100kW Generator 9x120kW Heaters
110 GP Medium tents
13x Portable Shower Facility 2x100kW Generator for showers
10x Portable Laundry
4x100kW Generator for the laundry's
1x60kW Generator, BLDG 945 1x120kW Heater, BLDG 945
3x120kW Heaters for other hard buildings
80x Hand Wash stations for 1600 personal
110x25kW Heaters for tents
>>>>> 2x40kW Generators for tents >>>>>
8x Hand Wash stations for 150 personal
Circle Town
There are 10 concrete pads for A‐Frame tents
No power for laundry, tents, 4 buildings
Layout
10 25kW heaters for tents
4x120kW heaters for the 4 buildings
Needed for contracted support to build camp for max of 150 personal
10 A Frame tents
2x Self contained portable showers for 150 personal
2x60kW Generators for the 4 buildings
>>>>>>2x Portable Laundry's 1x100kW generator
19x25kW heaters for tents
2x Self contained portable showers
1x60kW Generators for the 3 wooden buildings
3x120kW heaters for the 3 wooden buildings
15x Hand Wash stations
4x40kW Generators for tents19 A Frame tents
COP Enslwang
Layout
There are 19 concrete pads for A‐Frame tents
No power for the tents, 3 buildings
Needed for contracted support to build camp with max of 285 personal
1 Shower and 1 Laundry can be powered from the Grid on the COP
8x Hand Wash stations
1x Portable Laundry's 1x60kW generator
10 A Frame tents 2x40kW Generators for tents 10x25kW heaters for tents
2x Self contained portable showers
1x60kW Generators for the 2 wooden buildings
2x120kW heaters for the 2 wooden buildings
COP Schwend
Layout
There are 10 concrete pads for A‐Frame tents
No power for the tents, 2 buildings, laundry's
Needed for contracted support to build camp with max of 150 personal
>>>>>>2x Portable Laundry's 1x100kW generator
26x25kW heaters for tents
3x Self contained portable showers
1x60kW Generators for the 3 wooden buildings
4x120kW heaters for the 4 wooden buildings
20x Hand Wash stations
26 A Frame tents 5x40kW Generators for tents
COP Raversdorf
Layout
There are 26 concrete pads for A‐Frame tents
No power for the tents, 3 buildings
Needed for contracted support to build camp with max of 390 personal
12x120kW Heaters
2x60kW Generator for the 3 buildings
3x120kW Heater for the 3 buildings
1x120kW Heater for the other hard building that has power
15x Self Contained Portable
Shower Facility
12x Portable Laundry
4x100kW Generator for the laundry's
95x Hand Wash stations
4xDining Facility Shelters 8x100kW Generator
FOB West
Layout
There are 130 tent pads with frames for GP medium tents and
4 showers can be powered from the grid on the FOB
3 laundry's can be powered from the grid on the FOB
Anything over 3 laundry's needs generation
3 Hard Buildings have no power out of 4
Needed for contracted support to build camp with max of 1900 personal
130 GP Medium tents 130x25kW Heaters for tents
MOUT IED Lane
Layout
There are 6 concrete pads for A‐Frame tents, COB's
Needed for contracted support to build camp with max of 90 personal
6x A Frame tents powered from
Grid
1x Portable Laundry 1x60kW generator
6x25kW heaters for tents
1x Self contained portable shower that is powered from
Grid
5x Hand Wash stations
6x Hand Wash stations
1x Portable Laundry 1x60kW generator
MOUT Uebungsdorf
Layout
No tent pads, COB's, Needed for contracted support to build camp with max of 120 personal 1x Self contained portable shower that is powered from
1x Portable Laundry 1x60kW generator
MOUT Enslwang
Layout
No tent pads, COB's, Needed for contracted support to build camp with max of 120 personal
1x Self contained portable
1x Portable Laundry 1x60kW generator
MOUT Schwend
Layout
No tent pads, COB's, Needed for contracted support to build camp with max of 120 personal
1x Self contained portable
1x Portable Laundry 1x60kW generator
MOUT Raversdorf
Layout
No tent pads, COB's, Needed for contracted support to build camp with max of 120 personal
1x Self contained portable
>>>>>>1x Portable Laundry 1x60kW generator
MOUT Mud Hut
Layout
6 tent pads for A Frame Tents
Needed for contracted support to build camp with max of 90 personal
6x A Frame tents powered from
Grid 6x25kW heaters for tents 2x60kW Generator to power grid
Power Grid needs 2x60kW Generators when used
1x Self contained portable shower
5x Hand Wash stations
1x Portable Laundry 1x60kW generator
MOUT Kittensee
Layout
No tent pads, COB's, Needed for contracted support to build camp with max of 120 personal
1x Self contained portable