A07_-_generator_information.docx

DOCX document 19 KB Posted

Attached to
Operation and Maintenance of Hawthorne Army Depot
Solicitation number
W52P1J-19-R-0069
Issued by

About this file

This document provides details on generators located at various facilities of Hawthorne Army Depot. Generators range in size from 25KW to 500KW, with fuel tanks installed either underneath or on trailers. Propane and diesel generators are specified. Run times on fuel tanks range from 10 to 24 hours depending on the generator size and fuel type. The related federal contract opportunity posting announces plans for an upcoming industry day in June or July 2019 to discuss the solicitation for Operation and Maintenance of Hawthorne Army Depot under solicitation number W52P1J-19-R-0069. A draft solicitation will be posted on FedBizOpps prior to industry day. The event will provide an opportunity for industry to review and provide input on the solicitation before it is finalized.

Generator Information

View the file

Other files

File Type Posted
Copy of beta.SAM.GOV DOCUMENT TRACKER 7MAY20.xlsx XLSX spreadsheet
W52P1J19R0069-0007.pdf PDF
Copy of beta.SAM.GOV DOCUMENT TRACKER 7APR20.xlsx XLSX spreadsheet
W52P1J19R0069-0006.pdf PDF
Copy of beta.SAM.GOV DOCUMENT TRACKER 25MAR20.xlsx XLSX spreadsheet
W52P1J19R0069-0005.pdf PDF
Copy of beta.SAM.GOV DOCUMENT TRACKER 12MAR20(R2).xlsx XLSX spreadsheet
Attachment 0036 - Hawthorne Questions and Answers Number 7.xlsx XLSX spreadsheet
DA FORM 7632 (Magazine group 41) v3.pdf PDF
Copy of beta.SAM.GOV DOCUMENT TRACKER 12MAR20(R1).xlsx XLSX spreadsheet
41 Group Explosive License (with signature).pdf PDF
41 Group to MOUT Site.pptx PPTX presentation
W52P1J19R0069-0004.pdf PDF
Revised HWAD Dist D B5A ASSETS with MIDAS 31 January 2020.xlsx XLSX spreadsheet
Copy of beta.SAM.GOV DOCUMENT TRACKER 12MAR20.xlsx XLSX spreadsheet
Copy of beta.SAM.GOV DOCUMENT TRACKER 2MAR20.xlsx XLSX spreadsheet
Copy of beta.SAM.GOV DOCUMENT TRACKER 29JAN2020.xlsx XLSX spreadsheet
Arms room Explosive License Revised.pdf PDF
Exp License Op Facilities APR 2019.pdf PDF
Explosive License New Bomb & Old Bomb - Signed.pdf PDF
Copy of Exp License Storage FEB 2019.pdf PDF
FEDBIZOPPS_DOCUMENT_TRACKER_24OCT19.xlsx XLSX spreadsheet
HWAD_QA_3.pdf PDF
A07_-_Industry_Day_2_Script_External_Document_FINAL.DOCX DOCX document
A07_-_RPI_(HWAD_HQIIS_srmDetails-27Aug2019).xlsx XLSX spreadsheet
A07_-_ISR_Rating_Key_Q_F.docx DOCX document
A07_-_rosecreek__photos_18.pdf PDF
A07_-_Real_equipment_listing.xlsx XLSX spreadsheet
A07_-_Cat_Creek_and_Black_Beauty.pptx PPTX presentation
A07_-_DLA_Asset_Listing_dtd_01-24-2019.xlsx XLSX spreadsheet
A07_-_Local_3_Operating_Engineers_Collective_Bargaining_Agreement_from_2018.pdf PDF
FEDBIZOPPS_DOCUMENT_TRACKER_17OCT19.xlsx XLSX spreadsheet
A07_-_Air_Permit_9711-0863_02_HWAD_GenOP_DEC_2011.pdf PDF
A07_-_PERMIT_NS2003516.pdf PDF
A07_-_IMCOM_OPORD_17-036_(HWAD-Black_Beauty).pdf PDF
A07_-_Completed_PMs_2019(1).pdf PDF
A07_-_Black_Beauty_Photos_18.pdf PDF
A07_-_IMCOM_OPORD_17-036_(HWAD-Cat_Creek).pdf PDF
A07_-_New_Bomb_Photos.pdf PDF
A07_-_2019_YEARLY_SAMPLING.PDF PDF
A07_-_HWAD_Asset_Condition_Report_9_9_19.xls XLS spreadsheet
A07_-_Completed_PMs_2019(2).pdf PDF
A07_-_IMCOM_OPORD_17-036_(HWAD-Rose_Creek).pdf PDF
A07_-_Rosecreek18.pdf PDF
A07_-_Cat_Dam_Photos_18.pdf PDF
A07_-_Mechanical_Reduction_Systems.pdf PDF
A07_-_New_Bomb_Air_permit.pdf PDF
A07_-_PERMIT_NS2004524.pdf PDF
A07_-_power_poles_(003).xlsx XLSX spreadsheet
A07_-_Asset_Use_Condition.pdf PDF
Show 40 more

Latest 50 of 165 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4-11-19 These are located behind 102-52 on the ready line:

3- 250 KW Portable generators w/ fuel tanks underneath run time approx. 15 hrs. (Diesel) They are mounted on PLS skids 1- 250 KW Portable generator w/ fuel tank underneath, mounted on semi-trailer 15 hour run time (Diesel)

1-500 KW portable generator w/ mounted fuel tank on a semi-trailer 10 hrs. run time (Diesel)

Well 11 1- 125 KW Installed w/ fuel tank underneath run time 10 hrs. (Diesel)

Station reservoir installed 450 KW Generator w/tank underneath 20 hrs. run time (Diesel)

Bldg. 37 Guard Operations Center 25 KW Propane generator Installed 3 weeks run time

Bldg. 9 IT Generator 230 KW w/ tank underneath run time 12-15 hours (Diesel)

Fire station 1 Bldg. 8, 125 KW propane generator installed 3 weeks run time

Fire station 2 Bldg. 94, 125 KW generator Installed w/ tank underneath 15 hrs. (Diesel)

Bldg. 15 (pass and ID) Installed 40 KW w/tank underneath run time 15-20 hrs. (Diesel)

Bldg. 5 (communications) Installed 80 KW w/ fuel tank (diesel) 15-24 hours

Bldg. 501 (rocket Mountain) 80 KW propane generator Installed run time 3 weeks

All tanks can be filled for continuous operations

File details come from the government source that posted it. Updated .