This document provides details on generators located at various facilities of Hawthorne Army Depot. Generators range in size from 25KW to 500KW, with fuel tanks installed either underneath or on trailers. Propane and diesel generators are specified. Run times on fuel tanks range from 10 to 24 hours depending on the generator size and fuel type. The related federal contract opportunity posting announces plans for an upcoming industry day in June or July 2019 to discuss the solicitation for Operation and Maintenance of Hawthorne Army Depot under solicitation number W52P1J-19-R-0069. A draft solicitation will be posted on FedBizOpps prior to industry day. The event will provide an opportunity for industry to review and provide input on the solicitation before it is finalized.
Generator Information
View the file
Other files
Show 40 more
Latest 50 of 165 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4-11-19 These are located behind 102-52 on the ready line:
3- 250 KW Portable generators w/ fuel tanks underneath run time approx. 15 hrs. (Diesel) They are mounted on PLS skids 1- 250 KW Portable generator w/ fuel tank underneath, mounted on semi-trailer 15 hour run time (Diesel)
1-500 KW portable generator w/ mounted fuel tank on a semi-trailer 10 hrs. run time (Diesel)
Well 11 1- 125 KW Installed w/ fuel tank underneath run time 10 hrs. (Diesel)
Station reservoir installed 450 KW Generator w/tank underneath 20 hrs. run time (Diesel)
Bldg. 37 Guard Operations Center 25 KW Propane generator Installed 3 weeks run time
Bldg. 9 IT Generator 230 KW w/ tank underneath run time 12-15 hours (Diesel)
Fire station 1 Bldg. 8, 125 KW propane generator installed 3 weeks run time
Fire station 2 Bldg. 94, 125 KW generator Installed w/ tank underneath 15 hrs. (Diesel)
Bldg. 15 (pass and ID) Installed 40 KW w/tank underneath run time 15-20 hrs. (Diesel)
Bldg. 5 (communications) Installed 80 KW w/ fuel tank (diesel) 15-24 hours
Bldg. 501 (rocket Mountain) 80 KW propane generator Installed run time 3 weeks
All tanks can be filled for continuous operations