W52P1J17R0007-0004.pdf

PDF 18 KB Posted

Attached to
M82 Percussion Primers Federal contract opportunity
Solicitation number
W52P1J-17-R-0007
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to M82 Percussion Primers, newest first.
File Type Posted
J&A_15-380_M82_Percussion_Primer-_Revised_Redacted__4-17-18.pdf PDF
J&A_15-380_M82_Percussion_Primer-_Revised_Redacted.pdf PDF
J&A_15-380_M82_Percussion_Primer-_Redacted.pdf PDF
W52P1J17R0007-0007.pdf PDF
M82_Price_Matrix_06292017.xlsx XLSX spreadsheet
W52P1J17R0007-0006.pdf PDF
W52P1J17R0007-0005.pdf PDF
Attachment_0016_M82E3_Percussion_Primer_Draft_Spec_(Foam_Washer)_Final_Draft_2017_06_20.docx DOCX document
Attachment_0020_SOW_Physical_Security_Standards.pdf PDF
W52P1J17R0007-0003.pdf PDF
Attachment_0001_M82_Price_Matrix_05-19-17.xlsx XLSX spreadsheet
W52P1J17R0007-0002.pdf PDF
W52P1J17R0007-0001.pdf PDF
Attachment_0013_8861198-1_DRAFT.PDF PDF
Attachment_0001_M82_Price_Matrix_05-19-17.pdf PDF
Attachment_0014_MIL-DTL-46610_Revision_F.pdf PDF
Attachment_0012_DS000848_-_COAI_M82-FW.PDF PDF
Attachment_0016_M82E3_Percussion_Primer_Draft_Spec(Foam_Washer).pdf PDF
Attachment_0004_Guidance_on_Documentation_of_CDRL.pdf PDF
Attachment_0006_Address_Code_Distribution_for_ECP__RFV__RFD__VECP.pdf PDF
Attachment_0003_Government_Point_of_Contact_List.pdf PDF
Attachment_0019_DS000517_FW_P&M_Fiber.pdf PDF
Attachment_0014_MIL-DTL-46610_Revision_F.pdf PDF
Attachment_0010_8861211-FW_Draft.pdf PDF
Attachment_0005_PPI_ADDRESS_2015.pdf PDF
W52P1J17R0007.pdf PDF
Attachment_0008_Instructions_for_Completing_DD_Form_1423.pdf PDF
Attachment_0017_8861200E.PDF PDF
Attachment_0002_Past_Performance_Questionaire_(PPQ).pdf PDF
Attachment_0015_DS000516_FW_P&M_Metal.pdf PDF
Exhibit_A_Contract_Data_Requirements_List.pdf PDF
Attachment_0018_WSHR001_draft.pdf PDF
Attachment_0009_Non_Disclosure_Agreement_(NDA).pdf PDF
Attachment_0007_ACQUISITION_OPSEC_PLAN.pdf PDF
Attachment_0011_DS000515_FW_P&M_Wirebound.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0004 2017JUN20

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

MATTHEW KOPEL

EMAIL: MATTHEW.J.KOPEL.CIV@MAIL.MIL

W52P1J-17-R-0007

2017MAY24

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 5

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MATTHEW KOPEL

Buyer Office Symbol/Telephone Number: CCRC-AC/(309)782-7888

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0004 to Solicitation W52P1J-17-R-0007 is as follows:

1. To answer the following questions from industry:

a. MIL-DTL-82-FW, Paragraph 3.8.1 states Static Test. The primers, with the black powder charge, shall function under an applied impact energy value...". Shouldn't this test be performed without the black powder charge?

Answer: Yes, the static test should be performed without the black powder charge.

b. In MIL-46296C, Paragraph 4.2.1.1.5 M82 Primer Functioning Test appears to be a part of the First Article One Time Qualification

Test for New Manufacturers of the No. 34 Primer. However, in MIL-DTL-82-FW, this same test is in a different paragraph section from the No. 34 Primer Qualification. The No. 34 Primer One Time Qualification starts in paragraph 4.4. The M82 Primer

Functioning Test has its own paragraph section, 4.5. In MIL-DTL-82-FW, should paragraph 4.5 be a part of paragraph 4.4?

Answer: Yes, paragraph 4.5(M82 primer functioning test) should be included as a part of paragraph 4.4(No. 34 Primer Qualification).

c. MIL-DTL-82-FW, Paragraph 4.6.2.2, Container Assembly, Major 101 & 102 both list Level IV from MIL-STD-1916. However, Paragraphs 4.7.10 and 4.7.11 give sample sizes of 110 each and 150 each, respectively. Additionally, Major 101 lists this as a visual. Shouldnt this be AIE (4.7.10)? And lastly, this specification does not give any type of equipment requirements for either of these tests. MIL-P-46297C Paragraph 4.3.4 lists Equipment Tabulation Number ET-8867962 as the inspection equipment required, but this drawing is not included in the package.

Answer: Yes, Major 101 under Para 4.6.2.2 (Container Assembly) should be AIE. Requirements for 4.7.10(Rupture Test) and 4.7.11 (Air

Pressure Test) are listed in Dwg. 8861204 (Container Assembly) under notes 4 and 5. Contractors design for the Air Pressure Test and

Rupture Test will be included in their AIE and approved by USG.

d. MIL-DTL-82-FW, Paragraph 4.7.3 references Paragraph 4.4.1.1. Should this be Paragraph 4.7.1.1? And are the test quantities the same as listed in 4.7.1.2 & 4.7.1.3?

Answer: Para 4.7.3 should reference Para 4.7.1.1. The test quantities are also the same as listed in 4.7.1.2 and 4.7.1.3.

e. MIL-DTL-82-FW, Paragraph 3.7.1 lists Table III for the sampling plan for the non-functioning test. Table III is the sampling plan for the Packaging for the First Article. Sampling for the Non-Functioning Test is actually given in paragraphs under 4.7.1.

Answer: Para 3.7.1 should reference Para 4.7.1.

f. MIL-P-46297C Paragraph 4.3.2.1 & MIL-DTL-82-FW Paragraph 4.6.2.1 both list 206, Diameter of thread pilot, Min. However, isnt this pilot characteristic removed on the Revision C of Drawing 8861203? The thread now continues to the end of the part.

Answer: Minor 206 (Diameter of thread pilot, min) listed under Para 4.6.2.1 (Tube, container) should be removed from the specification

(MIL-DTL-82-FW).

g. MIL-P-46296C(6) Paragraphs 3.6 and 4.2.3.5 reference a Chamber Gage that is to be used for 100% inspection of the completed primer. Paragraph 4.2.4 lists that the gage is identified in Equipment Tabulation Number ET-8861197, but this drawing is not included in the package. There is a Concentricity Gage Dwg. 8872774 that is included in the package and references the 8861197

Assembly Fails to Chamber. Is this the correct gage drawing to use? Additionally, this requirement is not included in the specification for the M82 with Foam Washer (MIL-DTL-82-FW). Should it be included in this specification as well?

Answer: Yes, 8872774 is the correct gage drawing to use. The Chamber Gage requirement will be added to the specification (MIL-DTL-82-

FW).

h. There is no defect classification listed in MIL-DTL-M82-FW for the Functioning and Non-Functioning tests. Are we to assume that they are the same as listed in MIL-P-46296C(6)?

2 5

W52P1J-17-R-0007 0004

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Answer: The defect classification for the Functioning and Non-Functioning tests in MIL-DTL-M82-FW are listed in Paragraph 4.6.2.12

(Assembly) Conformance table.

i. The Ballistic Test requirement in MIL-DTL-M82-FW is for FAT only. Is the Ballistic Test requirement for MIL-P-46296C(6) just for FAT as well, or is it required for every lot?

Answer: For this solicitation, Ballistic Test is required for FAT only.

j. In MIL-P-46296C(6) Paragraphs 4.2.3.1.1 & 4.2.3.1.2 and MIL-DTL-M82-FW Paragraphs 4.7.1.2 & 4.7.1.3 the Nonfunctioning Test samples are called Head Assemblies. Are these the same as Primers? If not, are there any additional parts required to be added to the Primer to become a Head Assembly?

Answer: For both specs, the Head Assembly includes the plunger, body, and ignition element assembly without the container charge assembly (see Dwg. 8861197).

Note: Updated MIL-DTL-82-FW dated 20 June 2017 incorporated the description of the head assembly.

2. Incorporate clause 252.223.7007, "Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives". As well as incorporating

Attachment 0020 SOW Physical Security Standards. Attachment 0016 (M82E3 Percussion Primer Draft Spec(Foam Washer) Final Draft 2017 06

19) has been revised to incorporate the answers from the questions above.

3. All other terms and conditions remain in effect.

4. As of June 22, 2017, no further questions will be accepted.

*** END OF NARRATIVE A0005 ***

3 5

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

I-1 CHANGED 252.223-7007 SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES SEP/1999

(a) Definition. Arms, ammunition, and explosives (AA&E), as used in this clause, means those items within the scope (chapter 1, paragraph B) of DoD 5100.76-M, Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives.

(b) The requirements of DoD 5100.76-M apply to the following items of AA&E being developed, produced, manufactured, or purchased for the

Government, or provided to the Contractor as Government-furnished property under this contract:

NOMENCLATURE NATIONAL SENSITIVITY/

STOCK NUMBER CATEGORY

Percussion, Primer 1390016483692 4/III

(c) The Contractor shall comply with the requirements of DoD 5100.76-M, as specified in the statement of work. The edition of DoD

5100.76-M in effect on the date of issuance of the solicitation for this contract shall apply.

(d) The Contractor shall allow representatives of the Defense Security Service (DSS), and representatives of other appropriate offices of the Government, access at all reasonable times into its facilities and those of its subcontractors, for the purpose of performing surveys, inspections, and investigations necessary to review compliance with the physical security standards applicable to this contract.

(e) The Contractor shall notify the cognizant DSS field office of any subcontract involving AA&E within 10 days after award of the subcontract.

(f) The Contractor shall ensure that the requirements of this clause are included in all subcontracts, at every tier--

(1) For the development, production, manufacture, or purchase of AA&E; or

(2) When AA&E will be provided to the subcontractor as Government-furnished property.

(g) Nothing in this clause shall relieve the Contractor of its responsibility for complying with applicable Federal, state, and local laws, ordinances, codes, and regulations (including requirements for obtaining licenses and permits) in connection with the performance of this contract.

(End of clause)

4 5

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0016 M82E3 PERCUSSION PRIMER DRAFT SPEC (FOAM WASHER) FINAL 20-JUN-2017 050

DRAFT 2017 06 20

Attachment 0020 SOW PHYSICAL SECURITY STANDARDS 15-JUN-2017 003

5 5

SECTION A
SECTION I
SECTION J

File details come from the government source that posted it. Updated .