W52P1J17R0007.pdf
PDF 204 KB Posted
- Attached to
- M82 Percussion Primers Federal contract opportunity
- Solicitation number
- W52P1J-17-R-0007
About this file
W52P1J-17-R-0007 Solicitation M82 Percussion Primer
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W52P1J-17-R-0007 X
2017MAY24
2017JUN2604:00pm
DOA6
2017MAY24 SEE SCHEDULE
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
MATTHEW KOPEL
(309)782-7888
CCRC-AC
MATTHEW.J.KOPEL.CIV@MAIL.MIL
1 78
X 1
X 5 X 8
X 13 X 14 X 26
X 30
X 32
X 35
X 54
X 55
X 63
X 73
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MATTHEW KOPEL
Buyer Office Symbol/Telephone Number: CCRC-AC/(309)782-7888
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Executive Summary:__________________
A.1. This Executive Summary is provided as a synopsis of important and relevant features of this solicitation. If conflict exists between this summary and the provisions of the solicitation, the provisions of the solicitation govern.
Acquisition Strategy:_____________________
A.2. The Army Contracting Command Rock Island (ACC-RI), Rock Island, IL has a requirement to procure M82 Percussion Primer, and M82
Percussion Primer- Foam Washer (FW).
A.3. The solicitation will be awarded using a Lowest Priced Technically Acceptable (LPTA) approach. Please refer to Section L and
Section M for further information on how proposals will be evaluated.
A.4. This acquisition is restricted to the United States and Canada in accordance with 10 U.S.C. 2304(c)(3).
A.5. The United States Government intends to award up to two (2) Indefinite Delivery Indefinite Quantity (IDIQ) contracts. Awardees will receive a contract for the following Contract Line Item Numbers (CLINs). The number of awards will be based on the United States
Governments requirements and the need to mitigate risk. However, the United States Government reserves the right to make a single award if determined to be in the best interest of the United States Government. The offeror shall propose Firm Fixed Price (FFP) unit prices for all quantity ranges, First Article Testings (FATs), Ordering Periods, and CLINs. Offerors will be provided fair opportunity to compete for future delivery orders. Delivery Order prices shall not exceed contract prices.
CLIN 1: NSN: 1390-01-648-3692_____________________________
CLIN 0001: M82 Percussion Primer
CLIN 2: NSN: TBD________________
CLIN 0002: M82 Percussion Primer- Foam Washer (FW)
A.6. Each IDIQ contract will consist of five, twelve-month ordering periods from date of award, a total of 60 months as follows:
Ordering Period 1: Date of Award (DOA) + 365 Days After Award (DAA)
Ordering Period 2: 366 DAA - 730 DAA
Ordering Period 3: 731 DAA - 1095 DAA
Ordering Period 4: 1096 DAA - 1460 DAA
Ordering Period 5: 1461 DAA - 1825 DAA
Guaranteed Minimum:___________________
A.7. The guaranteed minimum(s) will be awarded concurrently with the basic IDIQ contract(s) on Delivery Order 0001 to each offeror receiving an award.
A.8. The guaranteed minimum for this procurement is $5,000 for two Process Maps, one each for CLIN 0001 and CLIN 0002. All proposed prices shall be entered in Attachment 0001, Price Matrix, which includes FAT and unit prices for all the ordering period ranges. Each offeror awarded a guaranteed minimum will be eligible to compete for future Delivery Orders.
A.9. The total maximum for all CLINs, all contracts, resulting from this solicitation is $49,500,000.
Delivery Orders:________________
A.10. As requirements are identified FFP delivery orders will be competed among the offerors. The United States Government intends to award delivery orders based on price, schedule, and past performance. However, the United States Government reserves the right to utilize other factors in the evaluation of delivery orders as determined necessary to meet requirements.
Quantities and Delivery Schedules:__________________________________
A.11. Prices should not be entered in Section B. All FAT and unit prices for all ordering period ranges should be entered in Attachment
2 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
0001, Price Matrix. Prices not entered on the Price Matrix will not be considered. FAT costs are required to be included for each ordering period; however, the average of the FAT costs for the five ordering periods will be utilized to evaluate the total evaluated price on Attachment 0001, Price Matrix. If continuous production can be achieved, FAT may be waived by the Government. Offerors should not assume FAT will be waived and must provide FAT costs as required to be considered for award. Estimated quantities for the M82
Percussion Primer and M82 Percussion Primer - FW are listed in Section B.
The total contract will not exceed beyond the Period of Performance as listed in Section B and as noted in paragraph six (6) above.
Ordering Information:_____________________
A.12. When a requirement arises, the Procuring Contracting Officer (PCO) will issue contemplation letters for the award of FFP delivery orders. The order placement procedures that will be used are set forth in Section H of the solicitation. Offerors are directed to
Section I clause Federal Acquisition Regulation (FAR) 52.216-19 for order limitations. However, the Government retains the right to place a follow-on order after any award within 30 days for a quantity less than the most recent award. The contractor shall honor the same unit prices for that same item as in the previous award, and deliveries shall commence immediately after delivery of the original award at the same monthly rate.
Only Army Contracting Command - Rock Island, is authorized to issue delivery orders under this contract.
Hazard Classifications:_______________________
A.13. The M82 series primers are determined to be hazardous. Please refer to Hazard Classification Data Sheets located on the Technical
Data Package CDs for further information.
Instructions to Offerors and Evaluation for Award:__________________________________________________
A.14. Offerors are advised to carefully read Section L and Section M before submitting their proposals. Offerors must ensure that their proposals are fully complete, including all fill-ins and blanks within the Request for Proposal (RFP). Failure to provide any information in accordance with this RFP may result in the proposal not being considered for award. In addition, the offeror is responsible for understanding all requirements of the solicitation.
A.15. Offerors should note the provision at FAR 52.215-1, "Instructions to Offerors-Competitive Acquisition". The United States
Government intends to award up to two (2) contracts resulting from this RFP without discussions with offerors. However, the United
States Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.
Additional Information:_______________________
A.16. The offerors proposal shall be made valid for 250 days after the close of the solicitation instead of the 60 days as stated on page one of this solicitation, block 12.
A.17. All contractors who provide goods/services to the Department of Defense (DoD) must be registered in the System for Award
Management (SAM). The Internet site for registering in SAM is http://www.sam.gov. Failure to register in SAM will preclude a contractor from receiving a contract award resulting from this RFP.
A.18. All contractors must have current, accurate, and complete Representations and Certifications at SAM prior to RFP closing. Please refer to http://www.sam.gov.
A.19. Contractors must utilize the Wide Area Work Flow - Receipt and Acceptance system which can be found on page 31 of this RFP. This is the United States Government's electronic process for receipt and acceptance documents as well as contractor payment.
A.20. Offerors shall submit a Small Business Subcontracting Plan in accordance with FAR 52.219-9, Alternate 2 for each proposal submitted. One (1) electronic copy of the Small Business Subcontracting Plan is required per proposal. The Small Business Subcontracting
Plan will be reviewed in accordance with Army Federal Acquisition Regulation Supplement (AFARS) 5119.705-4. The requirement to submit a
Small Business Subcontracting Plan does not apply to small business concerns.
A.21. The Procuring Contracting Officer may request that a Pre-Award survey be done. The Pre-Award survey will be conducted by Defense
Contract Management Agency (DCMA) as prescribed in Defense Federal Acquisition Regulation 209.106, Pre-Award Surveys.
A.22. Ballistic testing of fully assembled primers is required for First Article Only
A.23 The date/time for receipt of the proposals is established as 4 p.m. CT on 5 July 2017. Proposals shall be submitted electronically
(emailed) to Mr. Matthew Kopel at matthew.j.kopel.civ@mail.mil. Any other type of submission will not be accepted. Any proposal received after 4 p.m. CT on 5 July 2017 will be handled in accordance with FAR 52.215-1.
A.24. This RFP should not be discussed with any United States Government employee except the Contracting Officer, Ms. Katelyn Coon or her representative, Mr. Matthew Kopel. Potential offeror's comments and/or questions should be directed in writing by email to Mr.
Matthew Kopel at matthew.j.kopel.civ@mail.mil, and Ms. Coon, katelyn.m.coon.civ@mail.mil. Please indicate the RFP number, W52P1J-17-R-
0007, in the subject line of all email correspondence pertaining to this RFP. The United States Government intends to respond to all potential offeror's comments and questions in writing via solicitation amendment.
3 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A.25. The United States Government anticipates holding post-award conference(s) for the contract(s) resulting from this solicitation. It is expected that the contractor will be responsible for hosting a post-award conference. Hosting is defined as securing meeting facilities for up to approximately 20 participants, and ensuring adequate presentation equipment is available.
*** END OF NARRATIVE A0001 ***
4 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
Prices submitted on the Price Matrix (Attachment 0001) will be the ceiling prices for future requirements.
The United States Government intends to conduct a competition among the awardees for each future requirement; however, the United States
Government reserves the right to issue a unilateral delivery order if it is determined to be in the United States Government's best interest.
The United States Government reserves the right to split future requirements among awardees based on the Government's discretion.
Do not submit pricing information in Section B for any CLIN. All pricing shall be included on the Price Matrix, Attachment 0001.
*** END OF NARRATIVE B0001 ***
5 78
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001 M82 PERCUSSION PRIMER _____________________
NOUN: M82 Percussion Primer
NSN: 1390-01-648-3692
PART NR: 13060848
Ordering Period 1: Date of Award (DOA) + 365 Days
After Award (DAA)
Ordering Period 2: 366 DAA - 730 DAA
Ordering Period 3: 731 DAA - 1095 DAA
Ordering Period 4: 1096 DAA - 1460 DAA
Ordering Period 5: 1461 DAA - 1825 DAA
Estimated Maximum Total Quantity for CLIN 1:
2,830,000 each
First Article Test (FAT) samples are due 270 days after award. The United States Government response time to determine FAT approval is 75 days
(345 days after date of award). Production deliveries are due 120 Days after approval of
First Article at a rate of up to 40,000 per month.
For production quantities without FAT deliveries are due 120 days after date of award at a rate of up to 40,000 per month. Offerors must complete the
Price Matrix (See Attachment 0001).
Only Army Contracting Command - Rock Island is authorized to issue delivery orders under this contract.
(End of narrative B001)
0002 M82 PERCUSSION PRIMER FOAM WASHER (FW) ______________________________________
NOUN: M82 Percussion Primer Foam Washer (FW)
NSN: TBD
PART NR: TBD
Ordering Period 1: Date of Award (DOA) + 365 Days
After Award (DAA)
Ordering Period 2: 366 DAA - 730 DAA
Ordering Period 3: 731 DAA - 1095 DAA
Ordering Period 4: 1096 DAA - 1460 DAA
Ordering Period 5: 1461 DAA - 1825 DAA
Estimated Maximum Total Quantity for CLIN 2:
2,830,000 each
First Article Test (FAT) samples are due 270 days after award. The United States Government response time to determine FAT approval is 75 days (345 days after date of award). Production deliveries are due 120 Days after approval of First Article
6 78
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
at a rate of up to 40,000 per month. For production quantities without FAT deliveries are due 120 days after date of award at a rate of up to 40,000 per month. Offerors must complete the Price Matrix
(See Attachment 0001).
Only Army Contracting Command - Rock Island is authorized to issue delivery orders under this contract.
(End of narrative B001)
0003 CLIN FOR CDRLS ______________
The contractor will prepare and deliver data submissions in accordance with the requirements, quantities, and schedules set forth in the Contract
Data Requirements List (DD Form 1423).
(End of narrative B001)
7 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
DRAWINGS/SPECIFICATIONS
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) Drawings and Specifications in accordance with Technical Data Package Listing 13060848:19200, with revisions in effect as of
08/01/2016, are applicable to this procurement.
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the section titled
"Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND DESTRUCTION OF RESTRICTED TECHNICAL DATA
(a) Army Contracting Command - Rock Island (ACC-RI) will no longer make Technical Data Packages (TDPs) available for order via CD-
ROMS. TDPs will be obtained electronically via the link(s) below which will direct you to the Federal Business Opportunities (FBO) website. You must have an FBO account prior to accessing any TDP(s). To register for an account in FBO, please visit http://www.fbo.gov/index and click on Register Now under Vendors/Citizens. The toll free FBO helpdesk phone number is (866) 606-8220 and for international (334) 206- 7828. Vendors are responsible for placing correct information in FBO.
(b) You may need to use special software to view the documents that we post to the FBO. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require Lucent Viewer to view the TDP(s) which is available as freeware at: http://www.ec-edi.com/.
(c) The TDP(s) for this solicitation will be accessible via the FBO website (as described below) from the date of issue through the time specified in the solicitation for receipt of offers.
(d) FOR UNRESTRICTED TDPs:
(1) TDPs for this solicitation are unrestricted and can be accessed electronically via the FBO website. The URL will take you to that CLINs web-located TDP. You must have an FBO account prior to accessing the TDP.
(2) To access the TDP(s), click directly on the link provided below to be directed to the TDP. You may also copy and paste the link into your browser and hit the Enter key. You will be prompted for your FBO username and password prior to gaining access to the
TDP.
CLIN: NA
TDP Link (URL): NA
(e) FOR RESTRICTED TDPs:
TDPs and any other related documents, if applicable, for this solicitation are restricted and can be accessed electronically via the
FBO website, with valid contractor login credentials. TDPs and any other related documents are posted with various options, such as
Restricted and Export Control. These additional controls are described below:
(1) Access to RESTRICTED TDPs
Technical Data Packages that have been marked as 'Restricted' can be accessed electronically via the FBO website, with valid contractor login credentials. TDPs that have been marked as 'Restricted' will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the packages sub-tab and then click on the request explicit access button. Completion of a Use and Non-Disclosure Agreement may be required prior to gaining access to the TDP. Please allow 2-3 working days to process your request. You will receive a system generated email from FBO stating you have been granted permission for viewing or downloading the TDP items.
(2) Access to EXPORT CONTROL TDPs
(i) TDPs that have been marked as 'Export Control' can be accessed electronically via the FBO website, with valid contractor login credentials. In addition, to obtain access to these TDPs, vendors and contractors must have a current DD 2345, Militarily
Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Militarily Critical Technical Data Agreement on file with DLIS then you will not be able to access the TDP. To obtain certification, 8 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
go to http://www.logisticsinformationservice.dla.mil/jcp/ click on documents and follow instructions provided. Processing time is estimated at five working days after receipt.
(ii) TDPs that have been marked as Export Control will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the packages sub-tab, enter your Marketing Partner Identification Number (MPIN) and click on the request explicit access button. The requestor must be the "data custodian" that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes the user will be required to verify the MPIN again to gain access to Export Control TDP(s). Completion of a Use and Non-Disclosure Agreement may be required prior to gaining access to the TDP. You will receive a system generated email from FBO stating you have been granted permission for viewing or downloading the TDP items.
(iii) If multiple individuals in your company need access to the Export Control TDP for a solicitation, it can be obtained from your data custodian that is listed on the DD 2345.
(iv) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.
CLIN: 0001 and 0002
TDP Link (URL): https://www.fbo.gov/notices/ab88196ed99a9129724d0c0ea6c3786c
(3) Further dissemination of Restricted TDPs must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(4) Upon completion of the purposes for which the Restricted technical data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
(f) Questions related to registration in FBO should be directed to http://www.fbo.gov/index The FBO helpdesk phone number is (866) 606-
8820. Vendors are responsible for placing correct information in FBO. A user guide for FBO can be found at http://www.fbo.gov/index -on the right of the screen is User Guides - click on Vendor.
AMMUNITION DATA CARDS AND REPORT OF CONTRACTOR BALLISTIC TESTING
(a) Ammunition Data Cards shall be prepared in accordance with MIL-STD-1168 and shall follow the format required by the world wide web application identified as WARP or Worldwide Ammunition-data Repository Program. Information provided in paragraphs 6.7 through 6.16 of
MIL-STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall." This shall also include, if required on the DD Form 1423, a Report of Contractor Lot Acceptance/Ballistic Testing and Acceptance and Description Sheets (for Propellants and Explosives). WARP will reside within the Munitions History Program (MHP).
Additional details on these WARP applications are provided below.
(b) MHP-WARP Access Procedures
(1) Government or Contractor employee with CAC and AKO account:
(a) Click on the MHP hyperlink which is https://mhp.redstone.army.mil/
(b) Enter CAC PIN when prompted
(c) Click on WARP (ADC)
(d) Click on Help
(e) Click on WARP Request Access and follow instructions
(2) Contractor or Government employee without CAC and AKO account: MHP-WARP uses PKI authentication requiring a DoD approved digital certificate as a security measure to protect the integrity of stored data. There are three vendors that have been approved to issue DoD approved certificates per an External Certification Authority (ECA) program. You are required to use one of the approved vendors listed on the following DISA website: http://iase.disa.mil/pki/eca/index.html
A nominal fee is charged for each certificate. The Contractor, including any subcontractors, shall assume the responsibility for all costs of obtaining each digital certificate needed.
(3) After the required certificate is obtained:
(a) Click on the MHP-WARP hyperlink: https://mhpwarp.redstone.army.mil/
9 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) Enter ECA password
(c) Click on Help and follow the instructions for obtaining the necessary access
(c) HELP Numbers are as follows:
MHP Access (256)313-2143; DSN 897-2143
JMC Quality Administrators for WARP issues (309)782-2697 or (309)782-7107
(d) Worldwide Ammunition-data Repository Program (WARP)
An online user's manual will provide additional help in the development of an ammunition data card. It is recommended that you download and read the user's manual prior to inputting your initial data card. The user's manual also contains screen shots, which depict what the inputter will see during the ADC input process.
(e) Ammunition Data Card Input
ADC input allows current contractors and government facilities the capability to create, and submit for approval, ADCs which meet the format requirements of MIL-STD-1168. ADCs are automatically forwarded to the respective Government Agency Responsible for
Acceptance (GARA). The GARA in most cases is the Defense Contract Management Agency (DCMA) Quality Assurance Representative (QAR), who reviews contractor input for accuracy and completeness, and after updating the disposition code for the specific lot, submits the
ADC to the database. The inputter is granted access only to ADCs identified with its specific manufacturing code. The use of previously inputted ADCs through the TEMPLATE option significantly reduces input effort, while increasing accuracy and consistency of data.
(f) Email Notification
WARP provides immediate, automated notification to process participants when actions are required. When the contractor has completed an ADC submission, an email message is routed to the GARA advising that an ADC awaits review and approval. If the GARA approves the
ADC as submitted, the ADC is released to the base and an email, with approved data card, is routed back to the originator. If the ADC requires modification or correction to conform with MIL-STD-1168 and contract requirements, an email is provided to the ADC originator advising that corrective action is required prior to approval.
(g) Information Updates
It is important that the System Administrators are apprised when a contractor receives a new contract. The contractor shall notify mail to:usarmy.ria.jmc.mbx.warp@mail.mil within 30 days after receipt of a new contract. Information to be included shall be the contract number, item, GARA, Manufacturer's identification symbol and the names of the individuals who will be inputting ADCs into the system. If you are a new contractor and do not have a Manufacturer's identification symbol, you can obtain one by sending an email to mail to: usarmy.ria.jmc.mbx.warp@mail.mil. The email must contain manufacturer's name, address where performance of the contract will take place, and a point of contact.
Report of Contractor Ballistic/Function Testing Module
(1) In addition to its ADC function, WARP also serves as a repository for reports of contractor ballistic (or functional) testing.
Whenever the contract requires contractor performance of ballistic testing, the results of such testing shall be captured by you, the performing contractor, within a specially designed Lot Acceptance Test Report (LATR) module.
(2) Within the LATR module, you are required to provide a report of any contractor ballistic/function testing and to submit the report in electronic format via the World Wide Web. The report must be a .pdf file for the upload process to work.
(i) Acceptance and Description Sheets (for Propellants and Explosives) Module: The WARP application now contains an area for on-screen data entry capturing requirements per MIL-STD-1171 for Acceptance and Description Sheets with respect to contract specified
Propellant, Chemical and Explosive constituents.
STATEMENT OF WORK - 2-D BAR CODING VERIFICATION
(a) As a logistics measure to improve inventory, accountability, security and control, the supplier is required to provide 2-D Bar
Codes in accordance with MIL-STD-129 and MIL-PRF-61002 and as further detailed in Section D of the contract.
(b) An approval of the supplier's 2-D Bar Code Label is required before each product with a unique national stock number (NSN) or federally recognized number (FRN) shall be presented for acceptance to the Government Quality Assurance Representative. Prior to formal submission of product to the Government for acceptance, a first time sample of the supplier's initial 2-D Bar Coding Label, comprising of two (2) each of the exterior pack label and two (2) each of the pallet label, shall be submitted for approval to HQ, US
Army Joint Munitions Command, 1 Rock Island Arsenal, ATTN: AMSJM-QAP, Rock Island, IL 61299-6500 to be read by a High Performance Bar
10 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Code Verification system.
(c) Within fifteen calendar days, the supplier will be notified electronically of the approval, conditional approval, or disapproval of the submitted 2-D Bar Code Label. A notice of conditional approval shall state any further actions required of the supplier. A notice of disapproval shall cite reasons for the disapproval.
(d) Once approval of the 2-D Bar Code Label is received, the supplier may begin presenting product to the Government for acceptance.
(e) During life cycle management of the product, the Government may randomly perform checks of the integrity and conformity of the 2-D
Bar Code labeling that is affixed to the supplier's product.
(f) The supplier is responsible for all costs associated with correcting 2-D Bar Code labels that do not meet contractual requirements.
PHOSPHATE COATING REQUIREMENT (LIGHT)
The following requirements regarding phosphate coating are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification TT-C-490.
(a) Paragraph 3.2.1 of TT-C-490 refers to "Procedure approval". The written procedure, along with the panel submission requirements of paragraph 3.2.2, shall be sent to the designated contracting officer. The procedure shall include product names and manufacturers of all chemicals/materials to be used. All processes, equipment, and controls, along with the testing and test frequencies used for phosphating including the application of supplemental finishes.
(b) Paragraph 3.2.2 of TT-C-490 refers to "Preproduction validation panels". For parts requiring epoxy primer and urethane/epoxy topcoat finishes (CARC paint system), the preproduction panels shall include three phosphated only, three panels with phosphate and epoxy primer and three panels with phosphate, primer and topcoat. For parts requiring topcoat only (ammunition items), the preproduction panels shall include three phosphated only and three panels with phosphate and paint.
CONFIGURATION MANAGEMENT DOCUMENTATION
(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, Notices of Revision (NORs), and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR (or equivalent) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or postproduction and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested
11 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
*** END OF NARRATIVE C0001 ***
12 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
PACKAGING REQUIREMENTS
(a) Packaging shall be in accordance with 12977515 revision A, dated 18 Dec 2015.
(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
(c) Marking shall be in accordance with 12977515, Revision A, dated 18 Dec 2015. 2-D Barcodes are required in accordance with 12999545, Revision H, dated 02 April 2015.
EXCEPTION: The following shall apply to drawing 12977515, revision A, dated 18 Dec 2015:
DI-PACK-81059 does not apply to this contract.
HEAT TREAT WOOD QUALITY MARKING:
"In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material
(WPM). Boxes/pallets and any wood used as inner packaging made of nonmanufactured wood shall be heat-treated. All WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection
Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.
PALLETIZATION INSTRUCTION
Palletization shall be in accordance with 19-48-4116/158G, revision NA, dated Feb 2011.
19-48-4116, Revision 12, dated DEC 2011, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with ACV00561, Revision F, dated 02 DEC 2008. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D barcodes are required.
*** END OF NARRATIVE D0001 ***
13 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Section E Information:________________________
Please note - M82 Percussion Primer- Approval of Statistical Process Control (SPC) General Plan is required prior to First Article Test
(FAT). Approval of SPC Detailed Plan is required prior to the start of production. Sample Ammo Data Cards shall be submitted into
WARP system and approved prior to FAT. Approval of Measurement System Evaluation / Acceptance Inspection Equipment is required prior to
FAT. Conditional Approval of Critical Characteristic Control is required prior to start of production (Critical Plan of Action is optional). Approval of phosphate procedure is required prior to FAT. Approval of FAT plan is required prior to FAT. Approval of 2D barcodes is required prior to shipment of product.
FIRST ARTICLE TEST (GOVERNMENT TESTING)
(a) The Government first article test shall consist of: MIL-DTL-46610 revision F (dated 12 December 2009), MIL-P-46296, and MIL-P-46297 for M82 Percussion Primer (NSN 1390-01-648-3692) or MIL-DTL-46610 revision F (dated 12 December 2009) and MIL-DTL-M82-FW for M82
Percussion Primer Foam Washer (FW); which shall be examined and tested in accordance with contract requirements, the item specification(s), the Quality Assurance Provisions (QAPS) and drawings listed in the Technical Data Package.
(b) The first article shall be delivered to See Below. The first article shall be delivered by the Contractor Free on Board (FOB) destination except when transportation protective service or transportation security is required by other provision of this contract. If such is the case, the first article shall be delivered FOB origin and shipped on Government Bill of Lading.
Transportation Officer
U.S. Army Yuma Proving Ground
ATTN: Quentin Sorenson
Bldg 3740 KOFA Firing Range on Aberdeen Road Yuma, AZ 85365-9498
DODAAC: W61P4X
(c) The first article shall be representative of items to be manufactured using the same processes and procedures as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the
Contractor (including subcontractors) using the technical data package provided by the Government.
(d) Prior to delivery, each of the first article assemblies, subassemblies, and components shall be inspected by the Contractor for all contract, drawing, QAP and specification requirements except for any environmental or destructive tests indicated below: NA. The
Contractor shall provide to the Contracting Officer at least 15 calendar days advance notice of the schedule date for final inspection of the first article. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected. Results of contractor inspections (including supplier's and
Vendor's inspection records when applicable) shall be verified by the Government Quality Assurance Representative (QAR). The QAR shall attach to the contractor's inspection report a completed DD Form 1222. One copy of the contractor's inspection report with the DD Form
1222 shall be forwarded with the first article; two copies shall be provided to the Contracting Officer. Upon delivery to the
Government, the first article may be subjected to inspection for all contract, drawing, specification, and QAP requirements.
(e) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in the place of performance, manufacturing process, material used, drawing, specification or source supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting
Officer so that a determination can be made concerning the need for an additional first article sample or portion thereof, and instructions provided concerning the submission, inspection and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the Contractor.
(f) Rejected first articles or portions thereof not destroyed during inspection and testing will be held at the government first article test site for a period of 30 days following the date of notification of rejection, pending receipt of instructions from the Contractor for the disposition of the rejected material. The Contractor agrees that failure to furnish such instructions within said 30 day period shall constitute abandonment of said material by the Contractor and shall confer upon the Government the right to destroy or otherwise dispose of the rejected items at the discretion of the Government without liability to the Contractor by reason of such destruction or disposition.
MEASUREMENT SYSTEM EVALUATION (MSE)
(a) Definitions. This paragraph defines specific terms utilized throughout the rest of this section and in the accompanying Contract
Data Requirements List (CDRL) and Data Item Description (DID) (DI-QCIC-81960). This aids in clarifying the MSE requirements to
Government and contractor personnel.
14 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).
(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.
(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.
(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:
(i) Standard Test Equipment. Multiusage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.
(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.
(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic
Particle, and Liquid Penetrant.
(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.
(b) Scope. This section establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this section establishes requirements for the preparation, submission, and approval of AIE documentation.
(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIEs ability to test, verify, and/or measure the applicable characteristics or parameters (see DI-QCIC-81960).
(d) AIE Designs & Government Furnished Gages. AIE designs are of two types Government designs (see (d)(1)) and contractor designs (see
(d)(2)). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.
(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the AIE.
Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.
(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME Y14.43 and may include commercial inspection equipment. [Commercial inspection equipment is defined as shown in paragraph (a)(4) above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used.
Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME Y14.43, Absolute Tolerancing (Pessimistic
Tolerancing).
(3) Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.
(e) AIE Package Submittals. The contractor shall prepare the AIE package submittal in accordance with DI-QCIC-81960 in the applicable
Contract Data Requirements List (CDRL DD Form 1423). In addition, the contractor shall adhere to the following requirements:
(1) Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the
Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.
(2) Correspondence in English. The contractor shall ensure all AIE correspondence and documentation are submitted in English.
15 78
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(3) Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the Technical Data Package (TDP).
(4) AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.
(f) Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to the Government for approval in accordance with (IAW) the CDRL (DI-QCIC-81960). AIE for Minor characteristic inspections shall be submitted to the Government for approval IAW CDRL (DI-QCIC-81960) and as required below:
(1) [ ] Listed Minor (characteristics displayed on specifications and/or drawings
(2) [ ] Government selected list (as attached…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .