Q&A
| ADDITIONAL QUESTIONS/COMMENTS AND ANSWERS - REQUEST FOR PROPOSAL (RFP) UC SOFT CLIENT (W52P1J-16-R-0172) | |||||||
| RFP SECTION | VOLUME | ATTACHMENT | PAGE | PARAGRAPH | QUESTION/COMMENT | RESPONSE | |
| 1 |
Clarification: Thank you for answering industry's questions. After thorough examination of Amendment 002 additional questions and clarifications have arisen that materially impact our solution approach and security compliance proposal activities. Industry requires sufficient time to digest the new security requirements and evaluate alternative solutions that can best meet the Army requirements.
Would the Government Consider?
1) Extending the due date to Friday December 9th. in order to allow sufficient time for Industry to review the new critical elements in the RFP and develop a compliant, competitive offer, with acceptable risks for bidders, and a reasonable probability of success for the Government?
2) Establishing new milestone target for IL-5/NIPRNet. We recommend C+270 days to allow for maximum competition for all solutions in this procurement. This will reduce the financial risk of pre-award investment for all Bidders.
| Answer Question 1: Please see Amendment 0003 and Amendment 0004. Answer Question 2: The Government has considered this and the gate will be changed to C+180 days to obtain PA IL 5. IOC date for NIPR will change from 350 days after contract award to 440 days after contract award.SIPR will change from 410 days after contract award to 500 days after award. PA IL 6 will have to be obtained by NIPR IOC. | |||
| 2 | CLIN 0009 - TASK 1 | ||
| CLIN 0009 - TASK 2 | UC Soft Client Pricing Model | Attachment 5 | Summary |
Base Year OY1 - OY4 There is only a CLIN for SIPRNet tactical system interoperability integration.
| Question: Would the Government please confirm tactical system interoperability integration is only required for the IL-6 system on SIPRNet and that it is not needed for the IL-5 system on NIPRNet? | CLIN 0009 is related to XMPP interfaces. Price model dated 25 October 2016 on Amendment 0002 updated this CLIN title. | ||
| 3 | CLIN 0009 - TASK 1 | ||
| CLIN 0009 - TASK 2 | UC Soft Client Pricing Model | Attachment 5 | Summary |
Base Year OY1 - OY4 CLIN 0009 - TASK ONE - SIPRNet Tactical Interoperability Integration Price (ONE TIME FOR ENTIRE USER BASE)
CLIN 0009 - TASK TWO - SIPRNet Tactical Interoperability Sustainment Price Base and Option Years One thru Four Total The Base Year worksheet and all four option year worksheets (OY1 - OY4) have an entry labeled "TASK ONE - SIPRNet Tactical Interoperability Sustainment Price". This appears to be an error, as task 1 relates to the one-time integration price.
Question 1: Would the Government please correct the task 1 entries to reflect the stated purpose of task 1?
From the formulas on the Summary worksheet, it appears the Government's intent was to have the entries labeled "TASK ONE - SIPRNet Tactical Interoperability Sustainment Price" to select the TASK ONE - SIPRNet Tactical Interoperability Integration Price". The total presented on the summary sheet is the sum of each worksheets TASK ONE value. This does not match the indication that it is a one-time charge for the entire user base and conflicts with how some (but not all) one-time charges are calculated.
Question 2: Would the Government please clarify its intent regarding the one-time charge for task 1 and how the Offeror is to represent this one-time charge on the Base Year worksheets and the worksheets labeled OY1 through OY4?
| Similar issues exist with CLIN 0010 and CLIN 0011. | Please refer to Attachment 0003, Paragraph 1.1 j which explains these CLINS and the execution of. Also this is contained in Section B of the RFP. | ||
| 4 | CLIN 0009 - TASK 1 | ||
| CLIN 0009 - TASK 2 | UC Soft Client Pricing Model | Attachment 5 | Summary |
Base Year OY1 - OY4 CLIN 0009 - TASK ONE - SIPRNet Tactical Interoperability Integration Price (ONE TIME FOR ENTIRE USER BASE)
CLIN 0009 - TASK TWO - SIPRNet Tactical Interoperability Sustainment Price Base and Option Years One thru Four Total Also, there are statements in the SoO that indicate "Tactical Enclave migration to the Contractor XMPP Gateway will be executed as Individual XMPP Interface CLINs due to the specific configurations and testing needed for each of the different tactical configurations"; however, only a single CLIN is used for the tactical interoperability integration activities.
| Question: Would the Government please clarify how the Offeror is to address the specific configurations and testing needed for each of the different tactical configurations when only one CLIN is provided for this, CLIN 0009? | CLIN 0009 is related to XMPP interfaces. Price model dated 25 October 2016 on Amendment 0002 updated this CLIN title. The Government is unclear what the question is referring to for this CLIN, further information is needed to properly address the Offeror's concerns. | ||||
| 5 | Question 33 | Questions/Comments and Answers - Request for Proposal (RFP) UC Soft Client (W52P1J-16-R-0172) | Attachment 10 | Question 1: Will the trouble ticketing function provided by the Army Enterprise Service Desk (AESD) be accessible by the Offeror's SCSS operations staff (Offeror employees or subcontractors)? |
Government's response: 1) Direct connections to existing Army ticketing/SMS will not be required. The Government's response seems to address a direct system-to-system connection between a contractor's ticketing system and a Government ticketing system. This response does not address the question posed, which relates to the Offeror's SCSS operations staff having user-level access to the ticketing system used by AESD as a means of passing information between the two organizations.
| Question: Will the Government grant the UC SCSS contractor's staff user-level access to the Government's AESD ticketing system as a means of communication between AESD and the contractor's UC SCSS Tier 3 Service Desk? | The UC contractor shall use the AESD Federation business-to-business interface to exchange real-time relevant ticket information to/from the UC contractor's internal ticketing system with the Government. The UC contractor shall not rely on access to Government ticketing systems in order to obtain information or make updates. Per Section 2.6 of the SOO: "The contractor shall propose the workflow and key interface processes to take advantage of the AESD Business to Business (B2B) relationship. The contractor shall coordinate a B2B interface with the AESD during the first 90 days of contract execution." | |||||
| 6 | 2.1.1 On Premise Hosting | Unified Capabilities Soft Client Subscription Services Statement of Objectives (SOO) | Attachment 1 | p. 7 | 2.1.1 On Premise Hosting | |
| On premises includes DoD data centers or other facilities located on a DoD Base/Camp /Post/Station (B/C/P/S) under the direct control of DoD personnel and DoD security policies. This option requires the contractor to obtain and maintain a DoD Provisional Authorization (PA) at level 5 (NIPRNet) and level 6 (SIPRNet). If a non cloud on-premise solution is proposed, the infrastructure must meet security standards and controls within DoDI 8500.01 and 8510.01 Risk Management Framework (RMF). If a hybrid solution is proposed (cloud and non cloud), any part of the solution which is cloud based must meet the IL 5 and IL 6 requirements; any portion that is non-cloud will have to meet DoDI 8500.01 and 8510.01 RMF. | Question 1: Will the Government please confirm the DoD Provisional Authorization (PA) referenced in the requirement is a DoD Cloud Provisional Authorization? |
Question 2: Will the Government please confirm the requirement to maintain a DoD Cloud PA applies only to UC SCSS cloud-based solutions or cloud-based solution components?
Question 3: Will the government please confirm Level 5 and Level 6 PA requirements refers to DoD Cloud PAs granted for demonstrated compliance to Impact Level 5 and Impact Level 6 criteria as defined in the DoD Cloud Computing Security Requirements Guide (SRG), Version 1, Release 2?
Question 4: Will the Government please confirm UC SCSS non-cloud based solutions or solution components must meet the requirements described in DoDI 8500.01 and DoDI 8510.01, including complying with the control and control extension (C/CE) set defined by CNSSI 1253 for a system categorization of (M, M, H):RMF IATO at (C)+90, followed by RMF ATO at (C)+180.
| Question 5: Would the Government please confirm the Impact Level 5 and Impact Level 6 criteria defined in the Cloud Computing SRG does not apply to UC SCSS non-cloud solutions or non-cloud solution components? | Question 1.: PA refers to DoD Provisional Authorization see SRG v1r2. Question 2: An awardee would have to maintain its UC PA's during performance of a contract resulting from this solicitation. Question 3: PA refers to DoD Provisional Authorization see SRG v1r2. Question 4: Please refer to the SOO for this requirement which is outlined under General Requirements for IOC, 2.2.10. Question 5: As stated in the SOO, PA applies to the cloud portion of solutions and RMF applies to the non-cloud portion of solutions. | ||||||
| 7 | 3.1.1. Gate 1 - Unified Capabilities (UC) Approved Products List (APL) | Evaluation Factors for Award | Attachment 3 | p. 7 | The Offerors proposal and documentation submitted will be evaluated to determine that the proposed solution is listed on the DoD UC APL as an approved UC Collaboration Product (UCCP). The USG will use the Defense Information Systems Agency Approved Products List Integrated Tracking System and the supporting date provided in the Offeror’s proposal to verify that the Offeror’s solution is UC APL UCCP approved. If a solution is proposed that does not meet the UC APL Certification, it will be determined unacceptable. Only solutions meeting the UC APL Certification will be determined acceptable. | The solution is comprised of vastly more than just an UCCP product, or existing suite that have functioned as a SUT under the UCCO’s process –currently only 5 systems/designs satisfy this requirement. |
Question- For Gate 1, we are presuming that if a solution is built with separate UCCO APL compliant component products the gate 1 requirements will be met. Is this presumption correct? If no, must the entire solution be submitted as an all-inclusive UC Collaboration Product (UCCP)? The UCR does not preclude cloud-based solutions. Unified Capabilities Certification Office (UCCO) test interoperability and security to these requirements based on system regardless of hosting/connection. Proposals are limited to the products in the APL. However, the offeror may propose delivery and implementation architectures for those products that differ from what was tested for the APL, so long as functionality and security are not degraded.
| 8 | 3.1.2. Gate 2 - DoD Provisional Authorization (PA) | Evaluation Factors for Award | Attachment 3 | p. 7 | For Non-Cloud Based Solutions: If the Offeror submits Risk Management (RMF) authorizations/accreditations for its NIPR and SIPR solution, the proposal will be deemed acceptable. If the proposed solution has not obtained RMF authorizations/accreditations the Government will evaluate the Offeror’s proposed approach and schedule for obtaining these authorizations/accreditations within 90 days of contract award for NIPR and by IOC for SIPR. The proposed approach and schedule will be evaluated to ensure that the Offeror has included all the dependencies, events, and workflows to include all 6 steps to accomplish RMF and review timeframes. | |
| Proposals and/or schedules which demonstrate the Offeror’s ability to achieve appropriate RMF authorizations/accreditations within 90 days of contract award for NIPR and by IOC for SIPR, will be deemed acceptable. Proposals and/or schedules which cannot demonstrate that the Offeror has the ability to achieve appropriate RMF authorizations/accreditations within 90 days of contract award for NIPR and by IOC for SIPR, will be deemed unacceptable. | Question- |
Section 3.12 speaks to Non-Cloud Based Solutions obtaining "RMF authorizations/accreditations within 90 days of contract award for NIPR and by IOC for SIPR."
| Will achievement of an Interim Authority to Operate (IATO) be sufficient to meet the deadline? | An ATO with caveats would be sufficient to meet this deadline. However, the awardee would still be required to obtain a full ATO in a timeframe to ensure IOC is met. | ||||||
| 9 | 3.2.1.1 Sub-factor I System Architecture: | Evaluation Factors for Award | Attachment 3 | pp. 10-11 | If Offeror has proposed an on-premise hosting solution, the USG will evaluate the NIPRnet and SIPRnet requirements for floor space, rack space, physical security/separation, high-density compute/cooling environments, per rack power requirements, bandwidth requirements, physical access requirements, remote management, and networking environment to determine if it is feasible, realistic, and what risks it brings to the USG as far as price and availability to accommodate within a USG facility and if the proposed solution is feasible and meets the security requirements. The proposal will be evaluated for off premise and on premise hosting solutions on how the hosting environment will operate within the Cloud Access Point (for cloud based and hybrid solutions), if the approach is feasible, and what risks it presents. The Offeror's proposal will be evaluated on how the proposed service levels will be maintained during performance while being hosted in either off-premise or on-premise solutions as proposed, it will be looked at for feasibility, benefit and risks it brings to the USG. | Question: If a non-cloud solution installed upon DoD premises, will the system have to adhere to the DoD ICAP connection requirements? If the non-cloud solution does not have to comply with the ICAP requirements, will the system be treated as a tenant system, subject to the requirements of the hosting data center’s Tenant Security Plan (TSP) and attaching inline to the upstream hosting enclave. |
| All solutions installed upon DoD premises will be subject to the hosting center's security requirements, connection agreements, and TSP. | ||||||
| 10 | 3.1.1 Gate 1: Unified Capabilities - Approved Products List (UC APL) | Instructions, Conditions, and Notices to Offerors | Attachment 2 | p. 9 | 3.1.1 Gate 1: Unified Capabilities - Approved Products List (UC APL) | |
| The Offeror shall submit UC APL documentation for the proposed UC Soft Client Solution. The solution must have completed the Joint Interoperability Test Command (JITC) UC APL Certification, Process (detailed in the “Unified Capabilities Approved Products List (UC APL) Process Guide, version 2.3, December 2014 (or current version). | In attachment 10, several of the Government’s responses to questions indicate commercial cloud services that appear as part of an offeror’s solution will face the same gate 1 criteria as those solutions that are built specifically for Unified Capabilities (UC) Soft Client Subscription Services (SCSS). In particular, the following questions directly address the UCR compliance issue: |
#78: The question recommends commercial cloud solutions be excluded from gate 1 requirements.
#87: The question requests a similar exclusion from gate 1 requirements based on an assertion that the commercial cloud services are not “in” the DoD network, being hosted in non-DoD premises and connecting via a CAP.
#88: The question requests a similar exclusion from gate 1 requirements based on being granted an exception to DoDI 8100.04 based on connections to the DISN through the CAPs.
#89: The question requests a similar exclusion from gate 1 requirements based on being granted an exception to DoDI 8100.04 based off-site hosting of the commercial cloud service.
#90: The question requests similar exclusion from gate 1 requirements based on three justifying reasons: 1) no cloud services on the APL; 2) No JITC process for cloud services; and 3) no JITC APL requirement was applied to similar cloud services, such as Collaboration Pathfinder.
For all the listed questions, the Government has declined to grant the exceptions requested and to provide any changes to the gate 1 criteria.
Question 1: Will the Government please confirm that commercial UC as a Service (UCaaS) cloud services, such as those provided by Microsoft and Cisco will be subject to gate 1 criteria when included as part of a UC SCSS cloud-based solution or a hybrid solution?
Question 2: Given cloud services are not tested by JITC as a unified product, thus have no listing on the UC APL, what documentation will the Government accept for demonstrating compliance with gate 1 requirements?
| The Government will not modify Gate 1. The Unified Capabilities Requirements 2013 (UCR 2013) drives this gate requirement. Unified Capabilities Certification Office (UCCO) test interoperability and security to these requirements based on system regardless of hosting/connection. Gate 2 will be updated as provided above. The SOO will be changed to add that the successful offeror shall provide the latest version of its solution in contract performance, if it has been JITC tested and certified. | |||||
| 11 | 2.3 Cybersecurity Requirements | Unified Capabilities Soft Client Subscription Services Statement of Objectives (SOO) | Attachment 1 | p. 13 | 2.3 Cybersecurity Requirements |
The Contractor shall maintain administrative, technical, and physical safeguards and controls required for the security level and services being provided in accordance with(IAW) the Cloud Computing Security Requirements Guide (SRG) Version 1 Release 2 found at http://iase.disa.mil/cloud_security/Pages/index.aspx. For non-cloud on DOD premise solutions, the solution must meet security standards and controls specified in DoDI 8500.01 and 8510.01 (RMF). For hybrid on premise solutions, any part of the solution which is cloud based, will have to be provided IAW SRG v1r2; any portion that is non-cloud will have to meet DoDI 8500.01 and 8510.01 RMF.
- The proposed solution shall possess an approved DoD Provisional Authorization (PA) for Impact level(IL) 5 (NIPRNet) 90 days after contract award and IL 6 (SIPRNet) no later than IOC.
- The contractor will be responsible for generating and providing RMF required accreditation related documentation and artifacts to the Army UC Soft Client Service Information System Security Manager (ISSM). RMF artifacts must be submitted for IL 5 systems Authority to Operate (ATO) NLT 180 days after contract award. IL 6 RMF artifact submission, inclusive of IL 5 controls and classified overlay shall be done in a timeframe to allow the Offeror to achieve IL 6 by IOC. For non-cloud or hybrid solutions, all security artifacts shall be submitted in the same timeline outlined above for cloud based solution. The Government seems to be blending cybersecurity requirements for cloud-based solutions with those for non-cloud-based solutions, not only in the referenced section, but also within other portions of the RFP attachments. This is introducing ambiguity as to the applicable authorization processes and schedules for each type of solution or solution component. Our understanding of the applicable authorization processes and schedules for cloud-based and non-cloud-based solutions is as follows:
Cloud-based solutions or solution components:
- IL-5: DoD Cloud Provisional Authorization (PA) at (C)+90, followed by RMF ATO at (C)+180
- IL-6 + Classified Overlay: DoD Cloud Provisional Authorization (PA) at (C)+350, followed by RMF ATO at (C)+410
Non-cloud solutions or solution components:
- NIPRNet CNSSI 1253 (M, M, H): RMF IATO at (C)+90, followed by RMF ATO at (C)+180
- SIPRNet CNSSI 1253 (M, M, H) + Classified Overlay: RMF IATO at (C)+350, followed by RMF ATO at (C)+410
| Question: Will the Government please confirm our understanding reflects the Government's intent? If not, will the Government please provide clarification of the specific authorization processes and schedules for cloud-based and non-cloud-based solutions and solution components? Please provide the clarification as separate presentations for cloud-based and non-cloud-based solutions, and within each presentation, individually address each security level (NIPRNet or IL-5, SIPRNet or IL-6). | Please refer to section 2.3 Cybersecurity Requirements of the SOO. The Governments intent is to receive RMF related artifacts and documentation from the contractor NLT (C)+180 for cloud, non-cloud, or hybrid solutions. | |||||
| 12 | 3.1.2 Gate 2: DoD Provisional Authorization (PA) Impact Level 5 and 6 Certifications | Instructions, Conditions, and Notices to Offerors | Attachment 2 | p. 9-10 | The Government defines two different authorization processes for an Offeror's solution: one based on the Cloud Computing Security Requirements Guide (SRG) for cloud-based solutions and one based on the DoD Risk Management Framework (RMF) for non-cloud-based solutions. Under the Cloud Computing SRG, the cloud service provider provides the 3PAO assessor, and the 3PAO may be engaged at any time by the cloud service provider. Under RMF, the Government provides the assessor, and the assessor is engaged after the system is listed in eMASS. |
Question 1: Is it the Government's intent to follow this structure for UC SCSS? If not, will the Government please clarify how and where assessors will be engaged for UC SCSS?
Question 2: Given eMASS registration may only occur after contract award, will the Government provide an alternate means of engaging RMF assessors to ensure they are available in time to meet the (C)+90 IATO date? Question 1: Please refer to section 2.3 Cybersecurity Requirements of the SOO. The Government intends to follow the DoD PA process for cloud based solutions and RMF for non-cloud based solutions. Both PA and RMF will be followed for hybrid solutions.
Question 2: Please refer to section 2.3 Cybersecurity Requirements of the SOO. The Governments intent is to receive RMF related artifacts and documentation from the contractor NLT (C)+180 for cloud, non-cloud, or hybrid solutions.
13 UC Soft Client Pricing Model VI 0005 Summary Tab CLIN 0002
CLIN 0003
| CLIN 0004 | In reviewing the updated price sheet and the formulas, it appears there are some missing links. For the summary of CLIN 0002, it's missing one of the OY2 cells. For CLIN 0003, it's missing one of the OY1 cells and one of the OY3 cells. For CLIN 0004, it's missing one of the OY1 cells in the calculation. | The price model has been updated. | ||||||
| 14 | UC Soft Client Pricing Model | VI | 0005 | Base Year and Option Year tabs | CLIN 0001 and 0002 | This is a follow-up to question 48 from Attachment 0010 Questions and Answers Amendment 0002. For the Implementation CLINs 0001 and 0003, we are trying to better understand how the billing will work for these CLINs. As an example, if 250,000 are implemented in the base year and 100,000 in Option Year 1, which band and what quantity will be billable in Option Year 1 for CLIN 0001 and 0002? For CLIN 0001, would the 100,000 implemented in OY1 fall under the 75,000 - 150,000 band or in the 150,001 - 500,000 band since 250,000 were implemented in the Base Year? | Question 2: Please refer to section 2.3 Cybersecurity Requirements of the SOO. The Governments intent is to receive RMF related artifacts and documentation from the contractor NLT (C)+180 for cloud, non-cloud, or hybrid solutions. | |
| 15 | UC Soft Client Pricing Model | VI | 0005 | Base Year and Option Year tabs | CLIN 0001 | This is a follow-up to question 48 from Attachment 0010 Questions and Answers Amendment 0002. In reviewing the percentages in the Base Year and Option Year tabs for CLIN 0001, it appears that using the same percentages in each year results in overvaluing the evaluated case around Implementations. The percentages used indicate 697,500 users implemented per year. Is the intent to implement 3,487,500 users over five years (697,850 x 5)? | The price model has been updated. | |
| 16 | UC Soft Client Pricing Model | VI | 0005 | Base Year and Option Year tabs | CLIN 0010 | This is a follow-up to question 44 from Attachment 0010 Questions and Answers Amendment 0002. CLIN 0010 is defined as Sustainment for both Task 1 and 2 on the price sheets. What's the difference between these CLINs? Should Task 1 be defined as Integration, and Task 2 be considered sustainment? In the base year, if users are integrated during the year, should there be sustainment CLINs in the Base Year or is the intent that the Base Year covers both Integration and Sustainment? | The base year covers both integration and sustainment. Updated price model states integration and sustainment consistently. | |
| 17 | Instructions to Offerors, Phase 1, Gate 3 Experience | Volume I - Security and Experience | Attachment 0002 | Page 10 of 18 | 3.1.3 The offeror shall describe its experience in providing and deploying UC Soft Client Subscription Services to a minimum of 100,000 users in a 36 month period, in blocks of 10,000 to 40,000 users. The Offeror shall submit documentation of contracts which demonstrates the Offeror's corporate capability and its partners which may include; management and oversight of, engineering of, funishing of, installation of, securing of, testing of, and experience in performing or providing services required under this effort. | Is Gate 3 a reference in addition to the references required for Volume IV - Factor 2 Past Performance? Can the same references/contracts be utilized for both Volumes? | If an offeror chooses to utilize the same references ,as it believes meets the criteria for Gate 3 and/or Past Performance, that is at its discretion. However, the Offeror must follow the instructions for that Gate 3 and Past Performance on how the information/references are to be submitted or it could be determined unacceptable. | |
| 18 | Volume I - Security and Experience | Attachment 0002 | Page 10 of 18 | 3.1.3 The offeror shall describe its experience in providing and deploying UC Soft Client Subscription Services to a minimum of 100,000 users in a 36 month period, in blocks of 10,000 to 40,000 users. The Offeror shall submit documentation of contracts which demonstrates the Offeror's corporate capability and its partners which may include; management and oversight of, engineering of, funishing of, installation of, securing of, testing of, and experience in performing or providing services required under this effort. | May the offeror utilize past performance of it's teaming or subcontractor partner for Gate 3: Experience? | As provided in Attachment 0002 " The Offeror shall submit documentation of contracts which demonstrates the Offeror's corporate capability and its partners which may include; management and oversight of, engineering of, furnishing of, installation of, securing of, testing of, and experience in performing or providing services required under this effort." | ||
| 19 | Volume I - Security and Experience | Attachment 0002 | Page 10 of 18 | 3.1.3 The offeror shall describe its experience in providing and deploying UC Soft Client Subscription Services to a minimum of 100,000 users in a 36 month period, in blocks of 10,000 to 40,000 users. The Offeror shall submit documentation of contracts which demonstrates the Offeror's corporate capability and its partners which may include; management and oversight of, engineering of, furnishing of, installation of, securing of, testing of, and experience in performing or providing services required under this effort. | May the offeror utilize an individual's past performance, who is now employed by the Prime for Gate 3: Experience? | Gate 3 refers to a corporates capability and experience. The Government is unclear how an individuals performance would meet this gate. | ||
| 20 | General | We respectfully request an extension of 2 weeks from time of the current due date. | Please see amendment 0003 and amendment 0004 | |||||
| 21 | We have been actively working with various OEMs and multiple small businesses to assemble our proposal for the UC Soft Client opportunity. We have received amendment 2 of the solicitation and given the number of questions answered and the significant changes to the RFP, we would like to respectfully request an additional 2 weeks to respond and provide the Government with complete and accurate proposal, that is also cost competitive | Please see amendment 0003 and amendment 0004 | ||||||
| 22 | In the Amendments issued on October 26th, the Government answered several vendor questions and made several changes to the solicitation documents that will impact offerors’ solutions. In light of these changes, vendor respectfully requests a 30 day extension of the current proposal due date to December 14, 2016, in order to prepare a fully compliant solution and proposal. | Please see amendment 0003 and amendment 0004 | ||||||
| 23 | 2.1.1 On Premise Hosting | ATTACHMENT 0001- STATEMENT OF OBJECTIVES (SOO) (CORRECTED) | 7 of 55 | For on-premise hosting, candidate data center locations are: |
etc...
Camp Humphreys, Korea Camp Walker, Korea Kaiserslautern, Germany Grafenwoehr, Germany Camp Zama, Japan
| Fort Shafter, Hawaii | Offeror is evaluating camps Walker and Humphreys in Korea as candidates for "On Premise" data center hosting. Imports into Korea could be challenging to offerors due to "homologation" certification approval. This certification approval requires the equipment’s manufacturer to obtain a specific testing/certifications for the equipment from an independent laboratory. Is it the government’s intention to follow this approach for importing equipment or is there an alternate method / solution that may be available to offerors? | If an offeror chooses to provide its OCONUS solution from a Korea based Army Data Center, it must process its equipment through Camp Market. | |||||
| 24 | General Instructions | 0002 | 19 | Section 3.1.2 Gate 2 | "If the proposed solution does not have an RMF authorization/accreditations for NIPR or SIPR, the Offeror shall provide a milestone schedule which reflects the processes/milestones to account for how it will accomplish all 6 steps of the RMF process to include authorization. The schedule submitted shall provide detailed dependencies (contractor and |
USG), events in order to meet the required dates (within 90 days of contract award for NIPR and 410 days for SIPR), and shall provide a workflow of how it will be obtained."
Q1: Can the government clarify the task reference implied that is due within 90 days of contract award for NIPR and 410 days for SIPR?
Q2: Is the government's intent to have the offeror obtain an ATO within 90 days if a Non-Cloud based solution is proposed?
Q1: PA IL 5 has changed from 90 days after award to 180 days after award. The offeror shall provide a schedule which demonstrates the appropriate tasks and events that is required to meet this PA in this timeframe for cloud and hybrid solutions. For non-cloud solutions, the schedule shall provide how it will meet RMF process to accomplish the 6 steps in a timeframe to meet the requirements. Q2: ATO has been addressed in questions above.
| 25 | SOO Section 2.4 and Attachment 005 Pricing Model | Attachment 005 Pricing Model | 14 | SOO Section 2.4 and Attachment 005 CLINs X001 - X004 | Section 2.4 of the SOO provides the fielding objectives for the UCaaS solution over time. It states that for the time frame that coincides with the contract base year 150K NIPR and 15K SIPR users are to be fielded. The CLIN structure, however, calls for pricing for NIPR users up to 1,000,000 and SIPR up to 100,000 users. According to the SOO Section 2.4 the Army is not planning on any SIPR users during the base year. The current CLIN structure does not at all mirror the stated fielding objectives and as structured would require vendors to provide pricing that should not be evaluated. Will the Government revise the Attachment 005 CLIN Pricing to more closely reflect the stated fielding objectives or provide clarification thereof? | CLIN 0001 and CLIN 0003 is to capture the price associated with onboarding users, not actual services. Over the course of the base year and option years the Government can onboard up to 1,000,000 users under CLIN 0001 and 100,000 under CLLIN 0003. Once on boarded, the cost of services will be funded under CLIN 0002 and 0003. Please read attachment 0003 and Section B of the RFP, which clearly outlines how CLINS will be funded and executed. | |
| 26 | Attachment 003 - Evaluation, Attachment 1 - SOO | Volume 1 | 0005 | Page 7 of Attachment 3; Page 5 - 1. Overview | 3.1.1 Gate 1 | In the SOO Section 1. Overview it states that it includes option for "cloud-based (Software-as-a Service (SaaS) service solution". However, the Phase 1 Gate pass/fail requirements in Attachment 3 requires the product to be on the DoD UC APL. Since the Unified Capabilities Requirements 2013 Change 1 dated June 2015 does not accommodate testing of cloud service offerings at this time, is the Army intending on purchasing an on premise solution only? | That is not the USG intent, except for where it is required or mandated per the SOO> The UCR does not preclude cloud-based solutions. Unified Capabilities Certification Office (UCCO) test interoperability and security to these requirements based on system regardless of hosting/connection. Proposals are limited to the products in the APL. However, the offeror may propose delivery and implementation architectures for those products that differ from what was tested for the APL, so long as functionality and security are not degraded.. |
The word "cloud-based" will be removed from the SOO Section 1. Overview.
27 Attachment 003 - Evaluation, Attachment 1 - SOO Volume 1 0005 Page 7 of Attachment 3; Page 5 - 1. Overview 3.1.1 Gate 1 Per the Statement of Objectives, if the Army intends to procure “Unified Capabilities (UC) Subscription services” on premise or off premise, cloud-based (Software-as-a-Service (SaaS)) service solution”, please modify Gate 1 to apply only to on premise components of the UC solution. If the Army intends to include cloud service offerings, please modify Gate 1 to remove the requirement for "cloud based service solutions". Gate 1 does not currently specify "cloud based service solutions" therefore the Gate does not need to be modified.
28 Attachment 003 - Evaluation, Attachment 1 - SOO Volume 2 0006 Page 7 of Attachment 3; Page 5 - 1. Overview 3.1.1 Gate 2 The DoD UC APL appears to be product centric list and not a cloud-based service offerings. The Unified Capabilities Requirements 2013 Change 1 dated June 2015 does not accommodate testing of cloud service offerings at this time. Also, the nature of a cloud-based service offerings is the service provider evolves the technology and provides new features making it an "evergreen service". Will the government modify the gate 1 to reflect for cloud services solution that it is acceptable for the cloud services to be based on products originally derived from the DoD UC APL that may have evolved as part of a "cloud service"? Gate 1 does not currently specify "cloud based service solutions" therefore the Gate does not need to be modified. The UCR does not preclude cloud-based solutions. Unified Capabilities Certification Office (UCCO) test interoperability and security to these requirements based on system regardless of hosting/connection. Proposals are limited to the products in the APL. However, the offeror may propose delivery and implementation architectures for those products that differ from what was tested for the APL, so long as functionality and security are not degraded.
29 Evaluation Factor for Award Attachment 3 7 3.1.1
3.1.1 states that the offerors proposal and documentation submitted will be evaluated to determine that the proposed solution is listed on the DoD UC APL as an approved UC Collaboration Product (UCCP). However, for the scope of this procurement UCCP does not appear to be the proper UCR category. Additionally, UCCP is only mentioned in the Evaluation section, and not in the SOO. The Army’s objectives and requirements to provide worldwide accessible Unified Capabilities (UC) Subscription services, which includes voice, video, instant messaging/chat, presence and desktop sharing capabilities delivered from a Contractor Owned and Contractor Operated (COCO), on premise or off premise, cloud-based (Software-as-a-Service (SaaS)) service solution is an Enterprise solution. Additionally, under the current DISA UCR UCCP requirements, 911/E911 are listed as "optional" capabilities which is a direct violation of the VVoIP STIG published this past June 2016. The STIGs apply to this solicitation. The Voice/Video over Internet Protocol (VVoIP) STIG includes the computing requirements for Voice/Video systems operating to support the DoD. The Voice/Video Services Policy STG must also be applied for each site using voice/video services. 911/E911 requirements in the Army are mandatory and are also captured in both Federal and DoD policy. XMPP is also listed as an optional capability under the UCR UCCP category and not a mandatory requirement of UCCP. UCCP should require XMPP to support IM, Chat, and Presence. UCCP was never intended as an Enterprise Solution. As a result, the proper DoD APL category to support the Army Enterprise voice requirement should be ESC. ESC covers everything being requested and much more. We respectfully request a change from UCCP to ESC.
UCCP is not a requirement in the SOO only mentioned in Attachment 0002 & 0003. Under UCCP 911 is optional, therefore is 911 required at FOC when voice is turned on, (because according to DoD/FED STIG 911/E911 is required every 30-50 feet) and the SOO currently has no clear statement that E911 is required. If the goal is to move towards an IP based network, how will the USG deploy E911 if it is not included in this requirement, given the goal is to deploy 900,000 voice users? Is it the army's intention to replace existing hard phones with a soft client as part of an offerors solution? Why is IM/Presence not UCCP compliant and voice ESC?
It is not the Army's intention to provide E911 as part of this service. E911 will be provided as it currently is. This is a non-assured service. It is the Army's intention to use this service as a compliment to VOIP. The Army intends this to be a bridge to assured services, in the future that moves most users off of hard phones and provides assured and C2 users services via hard phone. If PSTN is exercised as an option the Army will use this service to get rid of some hard phones. This is a non-assured service.
| 30 | Evaluation Factor for Award | Attachment 3 | 7 | 3.1.1 | In ATTACHMENT 0003- EVALUATION FACTORS FOR AWARD, it states in Section 3.1.2 a requirement for Gate 2 – DoD Provisional Authorization (PA) or RAR. Why is this certification or a RAR required within 90 days of contract award for a capability the Army has stated will not be procured until FOC(years away). The inclusion of this requirement is significantly limiting competition to only 1 vendor who is certified today. This solicitation does not allow for proper competition of the voice requirements in the Army. As an integrator, we cannot evaluate the multiple voice solutions available today with this constraint. In order to create a level playing field so all UC solutions can be considered, it is requested the Army remove the PA IL timeframe requirement or remove the PSTN/DSN CLIN for another procurement where your requirements can be properly competed. | PA IL5 is required for other requirements at IOC, therefore is applicable to have in a timeframe to meet IOC. | |
| 31 | SOO | Attachment 1 | 5,8,9 | 1.1/1.2/2.2.2 | Section 2.2.2 states the NIPRNET Solution shall be fully interoperable with the Public Switched Telephone Network and the Defense Switched Network to enable Non-Assured Voice and Video for DoD and Commercial access. Section 1.1 states transitioning to the UC Soft Client Subscription Service will enable the Army to move towards modernized IP-based services, move away from legacy infrastructure, and allow for circuit decommissioning. Section 1.2 states assured voice subscription services and extension of the subscription services to coalition networks are not within scope of this effort. Why doesn't the Army have a complete strategy to migrate their TDM switch base to VoIP/UC? This solicitation will not reduce the support costs for the legacy systems or allow any of them to be decommissioned. The inclusion of the LSC paragraph 2.1.3 was a good start but needs to go further. This requirement appears to be fragmented and does not take advantage of JITC certified APL products that exist today from at least 3 vendors that support C2 users, non C2 users, hard phones, soft clients, UC features, as well as military unique features on the same platform. The current approach requires multiple networks and a much higher cost to the Army. We respectively request that the voice requirement be amended to properly reflect the voice environment that exists in the Army and does not limit functionality to favor one vendor. At a minimum, the voice requirement should be an ESC. An alternate approach would be to delete voice from this procurement until the Army's requirements can be properly identified and competed. | The Government stategy is to acquire a non-assured service to meet the objectives stated in the SOO. | |
| 32 | Amendment 2 SOO -Gate 1 | Vol I | 2 | Gate 1 | if the Army intends to procure “Unified Capabilities (UC) Subscription services” on premise or off premise, cloud-based (Software-as-a-Service (SaaS)) service solution” | if the Army intends to procure “Unified Capabilities (UC) Subscription services” on premise or off premise, cloud-based (Software-as-a-Service (SaaS)) service solution”, please modify Gate 1 to apply to what can be tested and placed on the DISA UC APL today --- on premise components of the UC solution. If the Army intends to receive bids with cloud service offerings, Gate 1 requires modification since a process for testing cloud services is currently not available through DISA/JITC. | Gate 1 does not currently specify "cloud based service solutions" therefore the Gate does not need to be modified. The UCR does not preclude cloud-based solutions. Unified Capabilities Certification Office (UCCO) test interoperability and security to these requirements based on system regardless of hosting/connection. Proposals are limited to the products in the APL. However, the offeror may propose delivery and implementation architectures for those products that differ from what was tested for the APL, so long as functionality and security are not degraded. |
33 Guidance in Amendment 2 10 attachment 10, Questions/Comments and Answers, Q&A response makes it difficult for commercial cloud services to meet gate 1 requirements. This is because it applies UCR testing requirements to products that have not traditionally undergone JITC testing for UCR compliance (i.e., cloud service offers tested as a single unified product). Further:
a)The Government has no cloud service offer testing program, nor has any published intention of addressing this.
b) The ambiguous requirements within the RFP have led to confusion as to what would be needed to satisfy the gate 1 criteria.
c) If the Government provides additional guidance, most or all of the existing UCaaS cloud services offers would still not be able to pass gate 1. This is due in part to the products used to implement the services not being on the APL or deployed in a manner conforming to the tested configuration. It is also due in part to the Government’s proposal submission and accreditation schedules, which do not support rectification of the APL listing issue or the deployed configuration issue.
d) The criteria in the amended gate 1 requirements will cause bidders to either drop existing cloud service offers from their solution design or to bid cloud solutions that risk not passing Gate 1 and being deemed unacceptable. Those bidders that do not want to take on the risk or cannot develop alternate solutions in time to meet the proposal submission deadline will choose not to participate. This will limit competition and increase risk to the Government. a) Unified Capabilities Certification Office (UCCO) test interoperability and security to these requirements based on system regardless of hosting/connection.
b) Gate 1 does not currently specify "cloud based service solutions". see above question for detailed answer.
c) Proposals are limited to the products on the APL. However, the offeror may propose delivery and implementation architectures for those products that differ from what was tested for the APL, so long as functionality and security are not degraded.
d) Gate 1 does not currently specify "cloud based service solutions" therefore the Gate does not need to be modified.
34 Guidance in Amendment 2 Vol I Gate 2 Phase One and Phase Two Requirements (amendment 2) changed the requirements in such a way that has helped rectify some problems within portions of the RFP; however, has not addressed overall issues of risk and limited competition. For example, the amended gate 2 requirements make it easier to propose non-cloud solutions. It also eliminated IL-6 requirements from gate 2 and the relaxed IL-6/SIPRNet authorization schedule all of which have helped reduce risk, however, a number of critical issues remains.
a) The Government’s categorization structure, splitting solutions into cloud-based and non-cloud-based groups have no clear definition, and their unique requirements have made it difficult for bidders to assess the impact to their solutions, much less address them in the time allotted before submitting their binding proposals.
b) In addition, the categorization structure has made it much easier for non-cloud-based solutions to generate the documentation required for gate 2, as only a milestone schedule is needed to minimally comply with the documentation requirements. The Government is entirely dependent on the information the bidder presents in that milestone schedule to assess the schedule risk associated with the authorization requirement. Cloud-based solutions still must have a DoD PA or undergo a readiness assessment and provide a 3PAO-generated RAR.
c) The retention of the (C)+90 timeline for the IL-5 PA/NIPRNet IATO leads bidders to look towards cloud solutions to minimize the financial and schedule risks, with commercial UCaaS services that already have a DoD PA being particularly desirable. The effects of the gate 1 requirement changes have increased the likelihood that solutions based on these UCaaS services would need to change due to the reasons described above. This forces bidders to look for other UCaaS services that do not have issues with the gate 1 criteria or to switch to solutions based cloud infrastructure services, all in an effort to address the authorization timeline. This now forces bidders to follow the readiness assessment path, with the same challenges present in the original gate 2 requirements, but now with an entirely new solution imposed on them shortly before their proposal is due.
| d)The IL-5/NIPRnet C+90 day milestone schedule does not address the difficulties that were present in the pre-amendment 2 RFP. Specifically, bidders will have increased pre-award investment and financial risks This will limit competition in our opinion. | IL 5 requirements will be changed to obtain PA IL 5 within 180 days of award from 90 days from award. Please see question 1 which outlines these changes. | |||||||
| 35 | SOO -Section 2.1.1 | 1 | 7 | On Premise[s] Hosting-The offeror will be afforded the opportunity to conduct a site survey at the locations identified in the offerors solution. The site survey will be attended by the USG and the offeror. The site survey shall be conducted no later than 30 days after award. | a) While the changes to gate 1 and gate 2 requirements may lead bidders to non-cloud, on-premises solutions in order to be deemed acceptable in Gates 1 and 2, bidders are taking on additional risk, as the site surveys will not be conducted until after contract award, and any issues that arise cannot be addressed in time to maintain adherence to the implementation schedule to attain a DoD provisional authorization (PA) within 90-days after contract award. | |||
| b) Even if pre-award site surveys are offered, it is unlikely they can be completed in time to support the DoD PA schedule, much less the proposal submission schedule. This substantially increases the financial and schedule risks for both bidders and the Government, as any impact cannot be assessed until after proposal submission and possibly only after contract award. Bidders not willing to take on this risk will likely decline to participate, leading to reduced competition. | Please provide how site surveys apply to the timeline of PA. Site Surveys are to ascertain if the data center can support the proposed solution. | |||||||
| 36 | RFP | There appears to be confusion in the Industry around the FEDRAMP and JITC requirements of the solutions that would be compliant with the Army’s UC RFP requirements. A leading solution that is being considered is JITC certified as well as IL 5 approved, however the JITC certification of the product platform only allows it to support a single Community of Interest (COI), interconnecting to the DoD network via a COI ASLAN or non-ASLAN network to a SBC that can be provided by the COI or by DISA. It is not certified as an Enterprise solution to be extended over the DoD WAN (i.e. NIPRnet). “The SUT was also not tested for inter-enclave video over IP via the SBC so that capability is not covered under the JITC certification. Very simply, just because a solution is JITC certified and also has IL 5 approval does not give the Army the ability to deploy the solution in a manner that is not in accordance with the SUT and conditions of fielding of the JITC letter. Please confirm that any IL 5 approved solution proposed would have to deployed in a manner that is in accordance with the SUT and JITC conditions of fielding. | Proposals are limited to the products in the APL. However, the offeror may propose delivery and implementation architectures for those products that differ from what was tested for the APL, so long as functionality and security are not degraded. |