Attachment 0007 - pRFID III - Ordering Guide

View the file

Other files

File Type Posted
W52P1J-16-R-0139-0004.pdf PDF
Attachment_0009_-_pRFID_III_Price_Model_rev_2.xlsx XLSX spreadsheet
W52P1J-16-R-0139-0003.pdf PDF
Attachment_0009_-_pRFID_III_Price_Model_rev_1.xlsx XLSX spreadsheet
W52P1J-16-R-0139-0002.pdf PDF
Attachment_0006_-_pRFID_III_Product_Demonstration_Requirements_-_Rev_1.pdf PDF
Attachment_0008_-_Past_Performance_Questionnaire_-_Rev_1.docx DOCX document
Attachment_0014_-_pRFID_III__-_Questions_and_Answers.pdf PDF
W52P1J-16-R-0139-0001.pdf PDF
Attachment_0013_-_ACC-RI_Contracting_POC_Information_2016.pdf PDF
Attachment_0011_-_Contract_Participation_Matrix_Instructions.pdf PDF
Attachment_0005_-_Labor_Category_Descriptions.pdf PDF
Attachment_0004_-_pRFID_III_Hardware_ _Software_Table.xlsx XLSX spreadsheet
Attachment_0003_-_Exhibit_B__pRFID_III_Contract_Status_Report.pdf PDF
RFP_W52P1J-16-R-0139.pdf PDF
Attachment_0002_-_Exhibit_A__Safe_Separation_Distance.pdf PDF
Attachment_0008_-_Past_Performance_Questionnaire.pdf PDF
Attachment_0009_-_pRFID_III_Price_Model.xlsx XLSX spreadsheet
Attachment_0012_-_DD-254__pRFID_III.pdf PDF
Attachment_0001_-_pRFID_III_Contract_Data_Requirements_List.pdf PDF
Attachment_0006-_pRFID_III_Product_Demonstration_Requirements.pdf PDF
Attachment_0010_-_Contract_Participation_Matrix.xlsx XLSX spreadsheet
DRAFT_Attachment_0005_-_Labor_Category_Descriptions.pdf PDF
DRAFT_Attachment_0008__Past_Performance_Questionnaire.pdf PDF
DRAFT_Attachment_0007_pRFID_III_Ordering_Guide.pdf PDF
DRAFT_Attachment_0004_-_pRFID_III_Hardware_ _Software_Table.xlsx XLSX spreadsheet
DRAFT_Attachment_0009__pRFID_III_Price_Model.xlsx XLSX spreadsheet
DRAFT_Attachment_0011__Contract_Participation_Matrix_Instructions.pdf PDF
DRAFT_Attachment_0002_-_Exhibit_A__Safe_Seperation_Distance.pdf PDF
DRAFT_Attachment_0003_-_Exhibit_B__pRFID_III_Contract_Status_Report.pdf PDF
DRAFT_Attachment_0012_-_DD-254__pRFID_III.pdf PDF
DRAFT_RFP___W52P1J16R0139.pdf PDF
DRAFT_Attachment_0001_-_pRFID_III_Contract_Data_Requirements_List.pdf PDF
DRAFT_Attachment_0006-_pRFID_III_Product_Demonstration_Requirements.pdf PDF
DRAFT_Attachment_0010__Contract_Participation_Matrix.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i

PASSIVE RADIO FREQUENCY IDENTIFICATION III (pRFID III)

GOVERNMENT CONTRACTING OFFICER’S

ORDERING GUIDE

3 June 2016

Army Contracting Command ii

Foreword

These mandatory ordering procedures cover all the information needed to use the Passive Radio

Freqency Identification III (pRFID III) contract to obtain hardware, software, and services worldwide.

The contract is structured as a single award Indefinite Delivery Indefinite Quantity (IDIQ) contract vehicle, using delivery/task orders for acquisition of specified systems.

Questions regarding these guidelines and procedures for placing orders against the contracts should be directed to Contracting Officer’s Representative (COR):

Bryan Keys (COR)

Automated Movement and Identification Solution (PL AMIS)

Email: bryan.d.keys.civ@mail.mil

Telephone: 703-806-0541

Mailing Address: ATTN: SFAE-PS-AE-AMIS

9350 Hall Rd, Suite 206

Fort Belvoir, VA 22060-5526

Questions of a contractual nature should be directed to the Procuring Contracting Officer (PCO):

Amanda Struve

Army Contracting Command – Rock Island (ACC-RI)

Email: amanda.k.struve.civ@mail.mil

Telephone: 309-782-1150

Mailing Address: Army Contracting Command-Rock Island

Information Technology Division, CCRC-TB

3055 Rodman Ave.

Rock Island, IL 61299-8000

These guidelines will be revised, as needed, to improve the process of awarding and managing orders under the pRFID III contract.

mailto:bryan.d.keys.civ@mail.mil mailto:amanda.k.struve.civ@mail.mil

TABLE OF CONTENTS

CHAPTER 1 – GENERAL INFORMATION

I. Overview

II. Purpose

III. Applicability

IV. Scope

V. Decentralized IDIQ Contract

VI. Ordering Period

VII. Period of Performance (POP) for Task Orders/Delivery Orders (TOs/DOs)

VIII. Program Ceiling

IX. Authority to Place TOs/DOs

X. Fee for Use

XI. Prime Contractor

XII. Protests

CHAPTER 2 – ROLES AND RESPONSIBILITIES

I. Contracting Officer (KO)

II. Delegated Procuring Contracting Officer (DPCO)

III. Defense Contract Management Agency (DCMA)

IV. Contracting Officer’s Representative (COR)

V. IDIQ Contractor

VI. Task and Delivery Order Ombudsman

VII. Requiring Activity

A requiring activity is defined as any organizational element within the Army and other Federal and DoD Agencies that has a requirement appropriate for pRFID II

CHAPTER 3 – REQUIREMENTS PROCESS

I. Acquisition Planning

II. Competition in Contracting Act (CICA) Bundling and Contract Consolidation

III. Socio-Economic Goals and Small Business Participation

IV. North American Industry Classification System (NAICS) Selection

V. Product and Service Codes (PSC)

VI. Brand Name

CHAPTER 4 – PLACING TOs/DOs

I. Performance Work Statement (PWS)

II. Funding

III. Metrics

CONTRACT LEVEL METRICS

TASK ORDER LEVEL METRICS

IV. TO/DO Types

V. Contract Line Item Number (CLIN) Structure

VI. Task Order Request (TOR)/Delivery Order Request (DOR)

VII. Teaming Arrangement & Changes in Contractor Team Members

VIII. Ordering Limitations

IX. Past Performance

X. TO/DO Pricing

XI. TOP/DOP Technical Evaluation and Documentation

CHAPTER 5 – ADDITIONAL TOR/DOR CONSIDERATIONS

I. Contract Manpower Reporting

II. Organizational Conflict of Interest (OCI) at TO/DO Level

III. Addition of Clauses at TO/DO Level

IV. Government Property. Government Property

V. Security Requirements

VI. Other Direct Costs

VII. Travel

CHAPTER 6, TO/DO PROCESS

I. TOR/DOR Preparation

II. TOP/DOP Evaluation

III. TOR/DOR Award and Administration

CHAPTER 7- TO/DO MONITORING AND CONTRACT ADMINISTRATION

I. On/Off Ramps

II. Exercise of Contract Options

ATTACHMENTS

TASK ORDER CHECK LIST

CHAPTER 1 – GENERAL INFORMATION

I. Overview. The objective of the pRFID III acquisition is to provide a state-of-the-art, common, integrated structure for logistic identification, tracking, locating, and monitoring of commodities and assets. In addition, Item Unique Identification (IUID) marking, data collection, storage information, retrieval methods, information processing, and transmission of

Tag data will greatly enhance systems within the Department of Defense (DoD), United States

Coast Guard, other Federal Agencies, North Atlantic Treaty Organization (NATO), Coalition

Partners and, other Foreign Military Sales (FMS). Passive RFID technology will provide standardization and interoperability amongst Government Users of Passive RFID equipment and incidental services acquired from the pRFID III Contract.

The Passive Radio Frequency Identification III (pRFID III) acquisition will result in one (1) indefinite delivery, indefinite quantity (ID/IQ) contract. North American Industry Classification

System (NAICS) code 334111, Electronic Computer Manufacturing (size standard is 1,000 employees). The contract will be a three (3) year ID/IQ, with two (2) option years for Service and Maintenance Support. This contract will be Firm-Fixed Price, with reimbursable ODC and travel CLINs. The total ceiling value of the ID/IQ contract is $24.5 million. Performance is both CONUS and OCONUS.

II. Purpose. This IDIQ Ordering Guide establishes mandatory procedures for ordering against the Passive Radio Frequency Identification III (pRFID III) IDIQ contract. All applicable terms, conditions, requirements, ceilings, periods of performance, types of task orders (TO) or delivery orders (DO), ordering procedures, options, competition thresholds, basis for award of

TOs/DOs, funding, quality assurance and metrics are provided in this guide. This guide does not replace the mandatory elements of the FAR and its supplements. In the event of a conflict between this guide and the mandatory elements of the FAR and its supplements, the FAR and its supplements take precedence.

III. Applicability. This Ordering Guide is applicable to all Contracting Officers within the

Army, Department of Defense, other Federal agencies. Ordering will be open to the Army, other DOD agencies, all other Federal Agencies, NATO partners and authorized Government contractors supporting these agencies.

IV. Scope. The Mission of Automated Movement and Identification Solutions (AMIS) is to provide a single point of contact for procurement and technical expertise across the suite of

Automatic Identification Technology (AIT) enabling technologies that support focused logistics, Total Asset Visibility (TAV), and the integration of global supply chains. The

Passive Radio Frequency Identification (pRFID) III Contract will provide hardware, software, documentation, and, incidental services to authorized users worldwide. Incidental services include training, warranty and maintenance services, and technical engineering services (TES).

All Passive RFID hardware will conform to the EPC Global Standards / Specifications for each

Class of Tags. In addition, future requirements involving portal readers, extended memory

Tags, sensor enabled Tags, and smart fixed readers will be reviewed on a biannual basis to determine applicability with regard to Government use and implementation. Hardware and software delivery and installation, as well as performance of associated training and warranty and maintenance services, will be required at CONUS and OCONUS Government sites.

Performance of TES will be required at CONUS and OCONUS Government sites, and the

Contractor facility.

V. Decentralized IDIQ Contract. The pRFID III IDIQ contract is decentralized for ordering purposes. Any Federal warranted Contracting Officer can place Delivery Orders and Task

Orders against this contract.

VI. Ordering Period. The IDIQ contract provides for a five-year ordering base period from time of contract award. There are two one year option periods for maintenance support during ordering periods 4 and 5. All ordering after the Base Period is subject to the Government's

Option to Extend the Term of the Contract. Also, any period during which there is a suspension of performance as a result of a bid protest shall not constitute part of the Ordering Period.

1. Hardware, software, documentation, consumables, training, and TES may be ordered for 60 months from the date of contract award.

2. Maintenance may be ordered from the date the warranty expires during the remaining life of the contract

Base Period Date of Award – 5 Years After Date of Award

Option Maintenance Period - Ordering Period 4 Not to Exceed 12 months

Option Maintenance Period - Ordering Period 5 Not to Exceed 12 months

VII. Period of Performance (POP) for Task Orders/Delivery Orders (TOs/DOs).

Awarded task orders can include one base year and up to a one year option. No performance period can exceed 6 years from the initial date of award of the original IDIQ.

VIII. Program Ceiling. Passive Radio Frequency Identification III (pRFID III) has a ceiling value of $24.5 million. The contractor shall report to the ACC-RI Contracting Officer the orders placed on a quarterly basis. Moreover, the contractor will report in Monthly Status

Reports of the total value of all task and delivery orders sent to the COR for verification.

IX. Authority to Place TOs/DOs. All Federal Contracting Officers are delegated procurement authority to place TOs/Dos against pRFID III IDIQ contract. All Contracting

Officers seeking to place orders against the IDIQ contract shall agree to comply with the terms and conditions of the contract and Ordering Guide.

Point of Contact for questions regarding the Ordering Guide should be addressed to:

Amanda Struve, Contracting Officer, amanda.k.struve.civ@mail.mil, 309-782-1150

Timothy Volkert, Contract Specialist, timothy.w.volkert.civ@mail.mil, 309-782-1956 mailto:timothy.w.volkert.civ@mail.mil

X. Fee for Use. There is no fee to use the contract by any activity or agency delegated authority to solicit, award and administer TOs/DOs under the IDIQ contract. There are no exceptions.

XI. Prime Contractor. The prime conract holder is as follows:

TBD

XII. Protests. In accordance with FY08 Authorization Act, Section 843, GAO will entertain a protest filed on or after May 27, 2008, for delivery orders valued at more than $10M.

Procedures for protest are found at 4 CFR Part 21(GAO Bid Protest Regulations) IAW FAR

33.104.

CHAPTER 2 – ROLES AND RESPONSIBILITIES

I. Contracting Officer (KO). ACC-RI individual (Amanda Struve, Contracting Officer, amanda.k.struve.civ@mail.mil, 309-782-1150) who is duly appointed and designated with specific authority to enter into, administer, and terminate contracts and to make related determinations and findings on behalf of the U.S. Government. This KO is the only individual authorized to make any changes to the basic pRFID III IDIQ contract. Detail responsibilities, e.g.:

Administration of IDIQ contract.

POC for IDIQ customers for scope questions; makes in-scope/out-of-scope determinations etc.

Establish administrative procedures for placing orders.

Administer contracts and issue contract modification to the IDIQ contract.

Make changes to this IDIQ/Ordering Guide.

Establish and maintain central contract files and databases, as appropriate.

Gather quarterly usage data from the Contractor for all Services and report upward.

Track and report contract level metrics.

Monitor effect of protests on metrics and fair opportunity.

Reviewing Monthly Contract Status Reports

Monitor IDIQ ceiling by reviewing TO/DO and TO/DO modifications submitted by

DPCO’s.

Close-out of IDIQ.

II. Delegated Procuring Contracting Officer (DPCO). A warranted DPCO can place orders against the pRFID III IDIQ contract. The DPCO responsibilities and common duties are listed below:

Serves as the local contracting focal point for coordination and awarding TOs/DOs for customers.

Ensures TO/DO requirements are within the IDIQ contract scope.

If the Performance Work Statement (PWS) is not performance-based, ensures approval by the designated authority as specified in DFARS 237.170-2, etc. Approvals are obtained through the DPCO approval chain, not the KO approval chain.

Coordinates DD 2579 through the Small Business Administration (SBA) Local

Procurement Center Representative (SBA PCR).

Keeps Contractor submission requirements to a minimum.

Uses streamlined procedures, including oral presentations.

Establishes the TOR/DOR time IAW established milestone procedures. The length of time between release of the TORs/DORs and submission of Task Order

Proposals/Delivery Order Proposals (TOPs/DOPs) shall be commensurate with the complexity of the requirement.

Submits packages requiring Technical Engineering Services (TES) for a technical review of proposed contractor hours and costs.

Ensures Contractor Manpower Reporting (CMR) requirement is part of the TOR requirements package and that the requirement is included in the PWS/SOW/SOO of the resultant TO.

Performs all administrative functions: modifications, cure notices, terminations, ect.

Notifies KO regarding any significant issues such as terminations, suspicion of fraud, or

OCIs.

Ensures Quality Assurance Surveillance Plans (QASPs) and TO/DO metrics are part of the TOR/DOR and that the requirements are included in the award

Coordinates TORs/DORs with the ordering agency’s Principal Assistant Responsible for Contracting (PARC) at the appropriate threshold, and obtain approvals prior to execution.

Issues TORs/DORs.

Receives TOPS/DOPS; convenes evaluation boards; conducts negotiations; writes Task

Order/Delivery Order Decision Documents (TODD/DODD).

Coordinates award of TORs/DORs with the PARC at the appropriate threshold, and obtains approvals prior to execution.

Awards TOR/DOR; provides a copy of the award (and any subsequent modifications) to the IDIQ KO and the Program Management Office (PMO).

Appoints Contracting Officer’s Representative (COR) IAW Army Regulation (AR) AR

70-13 and ACC Pamphlet 70-1.

Monitors TO/DO metrics.

Authorizes travel

Prepares a Contractor Performance Assessment Report (CPAR), if required.

Closes out TOs/Dos.

III. Defense Contract Management Agency (DCMA). DCMA can participate in contract administration if the DPCO determines approporiate. DCMA roles include, but not limited to the inspection and acceptance of supplies on delivery orders at origin, quality assurance, and

Earned Value Management System (EVMS) surveillance, if required by a TO/DO.

IV. Contracting Officer’s Representative (COR). Bryan Keys, (bryan.d.keys.civ@mail.mil, Ph. (703-806-0541), is the Passive Radio Frequency Identification III (pRFID III) IDIQ COR.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars237.htm http://armypubs.army.mil/epubs/pdf/r70_13.pdf http://armypubs.army.mil/epubs/pdf/r70_13.pdf https://acc.aep.army.mil/Official%20Documents/Command%20Pamphlets/(ACC%20Pamphlet%2070-1)%20Interim%20Army%20Contracting%20Command,%20Contracting%20Officers%20Representative%20Policy%20Guide.pdf

The DPCO shall appoint a COR at the TO/DO level when required by FAR 1.602-2(d).

Different CORs are assigned for the IDIQ and the TOs.

A COR shall be appointed prior to the award of task orders as required by FAR 1.602-2(d) and

ACC Pam 70-1. The appointment letter shall designate a detailed description of COR responsibilities. The appointment letter will include a description of the requirement, instructions for maintaining COR qualifications, and roles and responsibilities such as:

COR at IDIQ Level:

Assist the KO and customer in developing the PRS, PWS/SOW/SOO, QASP, surveillance checklists with measureable outcomes, etc.

Prepare CPARS bi-annually for Contractor’s performance,.

Recommend to KO whether contract is still needed and provide information and documents to exercise option.

COR at Task Order Level:

Provides day-to-day surveillance of contractor performance.

Prepares TO performance report.

Assists the DPCO and customer in developing the PRS, PWS/SOW/SOO, QASP, surveillance checklists with measurable outcomes, ect.

Ensures reporting under the Contractor Manpower Reporting System is loaded on the prescribed web sites IAW the terms of the basic contract and TO.

Authorizes travel.

Reviews invoices in comparison to actual performance accomplished.

Interfaces with contractor personnel.

Submits CPAR input annually (services with an aggregate value of <$1M).

The DPCO should consider the nomination submitted by the requiring activity that identifies a

Government employee who is technically qualified and has completed the mandatory training to become a COR. The COR nomination letter should outline the authority sought from the

KO/DPCO. Task order COR delegations should require CORs to ensure that contractor performance is properly documented and that required reports are provided to the contracting activity for contract administration, monitoring and official contract file. The CORs shall use the measures and standards set forth in the Performance Requirement Summary (PRS) and

QASP to assess contractor performance, thereby ensuring the quality of services required by the

TO is met.

V. IDIQ Contractor. The contractor is highly technically qualified and has satisfied the full competition and past performance requirements of the IDIQ award process. Duties include:

Ensures performance and deliverables meet the requirements set forth in the basic contract and individual TOs/DOs.

Performs work and provides the services/supplies in accordance with the terms and conditions of the TO/DOs and prescribed levels of quality control.

Segregates cost data by TO/DO and within each TO/DO pursuant to the terms of the

TO/DO.

Submits a TOP/DOP IAW the request from the DPCO.

Contractor is required to submit Technical and Cost proposal for all requests for quotations or requests for proposals.Collect and report data for the Contractor

Manpower Reporting requirement.

VI. Task and Delivery Order Ombudsman.

The ombudsman is responsible for reviewing complaints from the contractors and ensuring that the contractor is afforded a fair opportunity to be considered, consistent with applicable procedures and established guidelines. The designated ombudsman for the pRFID III contract is:

Army Contracting Command – Rock Island (ACC-RI)

1 Rock Island Arsenal

Bldg 390 Rock Island, IL 61299

(309) 782-5379

AMC.LIST.ROCK-AMSAS-GCB@mail.mil

VII. Requiring Activity.

A requiring activity is defined as any organizational element within the Army, other Federal and DoD Agencies, and NATO partners that has a requirement appropriate for pRFID III.

Defines requirements and justifies to the DPCO that the requested work is within scope of the IDIQ. Justifies all Brand Name requirements.

Prepares Task Order Requirements packages.

Funds the work to be performed under pRFID III Orders.

Nominates a qualified Task Order Contracting Officer’s Representative (TO COR)

Assists the DPCO and customer in developing the PRS, PWS/SOW/SOO, QASP, surveillance checklists with measureable outcomes, etc

CHAPTER 3 – REQUIREMENTS PROCESS.

I. Acquisition Planning. The Passive Radio Frequency Identification III (pRFID III) IDIQ includes an approved Acqusition Strategy. DPCO needs to comply with their local policies and regulations regarding acquisition planning.

II. Competition in Contracting Act (CICA) Bundling and Contract Consolidation.

The pRFID III IDIQ is not a consolidated requirement. If TO/DO is a bundled or consolidated requirement provide an explanation IAW DFARS 207.170 and give a brief description of the consolidation. Include narrative to indicate whether appropriate approval for consolidation has already been obtained Army Federal Acquisition Regulation Supplement (AFARS) (AFARS

5107.170-3(S-90)). If not, a determination and finding is required to be prepared and approved through the DPCO chain, prior to the TOR/DOR being sent to the contractor.

mailto:amy.j.vansickle.civ@mail.mil http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars207.htm http://farsite.hill.af.mil/reghtml/regs/other/afars/5107.htm http://farsite.hill.af.mil/reghtml/regs/other/afars/5107.htm

III. Socio-Economic Goals and Small Business Participation. TOR/DORs must include specific requirements for Small Business participation applicable to both large and small businesses. State percentage goal for Small Business participation and include a specific minimum. TOP offering less than the minimum Small Business participation requirement may be excluded from further consideration for a TO award IAW ACC Policy .

If the requirement is performed OCONUS, recommend TORS include language to stimulate the designated categories below. If the acquisition strategy/plan and DOR/TOR discuss this, then include in Acquisition Strategy/Plan, e.g.: All Offerors are required to complete a U.S.

Small/Local Foreign Business Participation Plan. The offeror shall articulate how the offeror intends to meet the local foreign business and U.S. small business objectives for the contract in the aggregate. Offerors will be evaluated on the extent of participation of these concerns in performance of this contract opportunity. Offeror’s TOP must meet the Total U.S. Small/Local

Foreign Business Participation goal of 23%. This goal may be met through the participation by either U.S. small business, local foreign business, or both.

Note: Individual Task Order Addendums do not have to meet the minimum Total U.S.

Small/Local Foreign Business Participation goal of 23%. The goal is applicable only to the basic contract.

Designated Categories of Local Foreign Business are applicable to the country in which each task order is located and are as follows:

a. Afghan First – In accordance with DFARS provision 252.225-7023 & DFARS clause

252.225-7024.

b. Central and South Asian (CASA) First - Applicable when the task order is located in any one of the CASA states, which include Afghanistan, Pakistan, Kazakhstan, Kyrgyzstan, Tajikistan, Turkmenistan, and Uzbekistan. The Afghan First policy listed above takes precedence over this CASA First policy, which does not have a corresponding DFARS clause.

The CASA First policy encourages offerors to utilize CASA supplies and services (including sub contracting) when the TO is in one of the CASA states.

c. Other Host Nation Firms - Applicable when the TO/DO is not located in any one of the countries listed above. Offerors are encouraged to utilize firms from the host country where the

TO/DO performance occurs for supplies and services (including sub contracting).

V. North American Industry Classification System (NAICS) Selection. NAICS code

334111, Electronic Computer Manufacturing, size standard 1,000 employees was selected for pRFID III.

VI. Product and Service Codes (PSC). PSC Code D304, Automatic Data Processing

Telecommunications and Transmission Services was selected for pRFID III. If there are other codes that may be used, they must be identified at the TO/DO level. Ordering offices may use any appropriate PSC code that relates to the individual task areas required at that time.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_220.htm

The U.S. General Services Administration, Office of Government-wide Policy published the

Product and Services Codes Manual, which provides codes to describe products, services, and research and development (R&D) purchased by the federal government. The PSCs are 4-position codes, with products having a digit in the first position and services and R&D having a character in the first position. The product codes are managed by the DLA Logistics

Information Service and have been incorporated into the manual based on the list of Federal

Supply Classes (FSC) obtained from DLA Logistics Information Service in July 2011.

For predominantly services acquisitions, the Director for Defense Procurement and Acquisition

Policy (DPAP) issued a memo on 23 Nov 2010, subject: Taxonomy for the Acquisition of

Services (DFARS 237.102-74), that is useful in narrowing the selection of applicable PSCs by first categorizing the acquisition into one of six services portfolio groups.

VII. Brand Name. If a certain brand name is needed then this item needs to be justified in accordance with FAR Part 16.505.

CHAPTER 4 – PLACING TOs/DOs.

I. Performance Work Statement (PWS). The DPCO shall ensure that the task is within the general scope of the IDIQ contract (e.g., task areas, contract maximums, ordering limits). The contract shall be performance-based unless approved by the designated authority as specified in

DFARS 237.170-2 and AFARS 5137.170-2(a). A performance-based PWS shall identify the customer’s entire needs and address those needs with statements describing the required services in terms of output. The requiring activity should not impose requirements that are not specifically required to ensure successful satisfaction of the task order requirements. The requirements should be stated in clear, concise, easily understood and measurable terms.

Detailed procedures should not be included that dictate how the work is to be accomplished;

rather, the requirements should allow the Contractor the latitude to work in a manner suited for innovation and creativity.

At a minimum, the PWS should address the work to be performed, location of the work, period of performance, delivery schedule, applicable standards, acceptable criteria, and any special requirements (i.e., security clearances, travel, reports, unique or professional qualifications, special knowledge, etc). See FAR 37.6 for additional requirements for Performance-Based

Contracting.

Performance based metrics will be used to the greatest extent possible to ensure that the required performance quality levels are achieved. Metrics at the TO level should be clear, unambiguous and linked to incentives and penalties, and should be provided to the DPCO.

II. Funding. Funding for the TO/DO shall be authorized at the TO/DO level and shall be the type deemed appropriate for services/products to be acquired. Unfunded TOs/DOs are not authorized. Full funding shall be provided with each TO/DO.

https://acquisition.gov/PSC%20Manual%20-%20Final%20-%2011%20August%202011.pdf https://acquisition.gov/PSC%20Manual%20-%20Final%20-%2011%20August%202011.pdf http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars237.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars237.htm http://farsite.hill.af.mil/reghtml/regs/other/afars/5137.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/37.htm

III. Metrics. Metrics shall be captured at both the IDIQ and TO/DO levels. Program Level metrics measure the success of the entire program, across all task orders issued and are stated in the basic contract. TO/DO metrics measure success against performance in a specific TO/DO, and are included in each task order. Ensure metrics are value-added, achievable, measureable, and effective in meeting end-user needs in terms of cost, schedule, performance, small business participation and customer satisfaction

CONTRACT LEVEL METRICS.

a. Small Business Participation: Data will be collected on an annual basis that illustrates the degree to which small businesses (and subcategories) are utilized as subcontractors.

METRIC: Small business subcontracting.

TARGET/GOAL: 80% of large business contractors will meet or exceed small business subcontracting goals.

b. Quality of Work: Data will be collected on an annual basis that illustrates the degree of satisfaction of the clients for overall performance of the work as well as the quality of services performed.

METRIC: DCPO shall request a copy of the QASP from the COR, Bryan Keys, 703-

806-0541, bryan.d.keys.civ@mail.mil.

TARGET/GOAL: 80% of comments express overall satisfaction. Feedback may be obtained via customer satisfaction survey.

c. Quality of Documentation: Data will be collected on an annual basis that illustrates the degree of satisfaction of the project managers for overall acceptance for deliverables submitted as part of all task orders awarded to a particular contractor. Documentation is critical to the completion of a successful project and shows competency to our stakeholders (customers, regulatory agencies, etc.)

METRIC: Quality of Final Deliverables.

TARGET/GOAL: 80% of all final deliverables received are accepted within 2 submissions.

TASK ORDER LEVEL METRICS.

Task Order level metrics will be determined by the QASP (Quality Assurance Survailance

Plan) at the order level.

IV. TO/DO Types. Passive Radio Frequency Identification III (pRFID II) is firm-fixed-price

(FFP), with cost reimbursable ODC and Travel line items. Individual TOs will use contractor’s fixed labor rates for labor categories for each contract type. T&M type TOs/DOs are not allowed in this contract, and the DPCO should not treat any individual TO/DO as such.

Incidental T&M/LH CLINs are not allowed.

If the customer requests Technical Engineering Services (TES) the contractor shall propose a fixed amount of hours calculated times the established hourly rate. The Ordering Office will provide technical input to the ordering Contracting Officer on the quantity of hours proposed.

If determined acceptable by the contracting officer the amount is place on a TO/DO order on a

FFP basis.

The pRFID III contract is not authorized to procure a “level of effort” whereby a fixed number of hours of contractor labor are procured, as this is a type of T&M or Labor Hour contract which is not permitted. The acquisition of services must be done on a FFP basis where the contractor is performing services to meet a defined PWS which can be objectively measured.

Most TOs/DOs will be solicited, negotiated, and awarded as bilateral orders. The Government or DPCOs reserves the right to issue unilateral TOs/DOs on an undefinitized basis (DFARS

252.217-7027), utilizing a not-to-exceed ceiling amount provided by the Contractor in the

TO/DO.

V. Contract Line Item Number (CLIN) Structure. CLIN structure shall follow DFARS

204.71 Uniform Contract Line Item Numbering guidance and shall be in accordance with the format of the basic contract. In order to obtain better visibility of the Contractor service workforce from Contractors supporting the Army, TOs (services only) must include a separate

Contract Line Item Number for Contractor Manpower Reporting. Numbering of task/delivery orders shall be IAW DFARS 204.7004.

VI. Task Order Request (TOR)/Delivery Order Request (DOR). The KO/DPCO may solicit responses to requirements from the IDIQ contractor in written or oral format. The nature of the requirement and detail of response required may serve as guides to determine which medium is most appropriate. For example, urgent requirements that can be clearly articulated may be solicited orally, but must be followed up with detailed written correspondence.

A TOR/DOR should be prepared and issued for each TO/DO requirement conveyed in writing.

The TOR/DOR and supporting documents should clearly define:

a. The requirement;

b. The task/function area;

c. The anticipated TO/DO type;

d. Instructions for completing submissions in response to the request and for order placement procedures;

e. Additional clauses/provisions unique to the TO/DO;

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_215.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_215.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars204.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars204.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars204.htm

f. Period of performance and CLIN structure instructions;

g. The order placement procedures defining the method in which the TO/DO award will be made;

KO/DPCOs are encouraged to review the limitations for use of other than fixed-price contract types and to ensure adequate surveillance and contract administration is available to support the contract type selected. When selecting the TO/DO type, consider the contract administration requirements and ensure the contract administration team is capable of executing required administration requirements.

VII. Teaming Arrangement & Changes in Contractor Team Members. Teaming arrangements should be disclosed in potential contractors Management Support Plan Factor and the role of subcontractors should be disclosed i.e., provider of equipment or SW or TES.

Management Team will evaluate the Teaming arrangements. The changes in Teaming arrangements and subcontractors during the contract administration period shall be reported to the IDIQ KO and COR.

VIII. Ordering Limitations.

The IDIQ has a ceiling amount of $24,500,000.00. There is no guarantee that the Government will order the maximum value under this procurement.

ACC-RI will meet the minimum guaranteed dollare value of $25,000.00 with the award of

Delivery Order 0001 (awarded 19 December 2016).

IX. Past Performance. Contracting Officers should not require submission of past performance information under an IDIQ. This is because past performance of IDIQ contractor was evaluated at the time of awarding the basic IDIQ and found to be acceptable and present a low to moderate risk of failure. Past Performance information can be retrieved from databases such as the Past Performance Information Retrieval System (PPIRS).

X. TO/DO Pricing. Each TO/DO will be priced individually. The pRFID III Price Catalog can be found in Attachment 004 to the basic contract titled “Section B Pricing Guide/SLIN

Structure”. The attachment can be found at http://www.ait.army.mil. If pricing information is blocked, please contact SRA International directly (Huma A. Anwar, Sr. Contracts

Administrator, Huma.Anwar@CSRA.Com).

The contractor can not exceed prices listed for hardware, software, or labor categories listed in the catalog. Travel and Other Direct Costs (ODC’s) are on a cost reimbursable basis. Rates are inclusive of prime labor, subcontract labor, overhead and other burdens, fee and profit. All

TOP/DOP cost/price proposals shall be evaluated for price reasonableness.

http://www.ppirs.gov/ http://www.ait.army.mil/ mailto:Huma.Anwar@CSRA.Com

XI. TOP/DOP Technical Evaluation and Documentation.

a. The evaluation team designated by the DPCO will evaluate the TOPs/DOPs submitted

IAW the evaluation criteria set forth in the TOR/DOR and determine the Contractor awardee

IAW the specified evaluation criteria. The DPCO should ensure all evaluators have no conflicts of interest or preconceived outcomes. Documentation should directly relate to the evaluation criteria provided in the TOR/DOR.

b. Technical support to assist in the evaluation procedure must be provided by the requiring activity. Technical evaluators must be capable of providing knowledge and expertise required to accurately determine adequacy of the TOPs/DOPs. Technical evaluation shall be conducted on each TOR IAW the terms of the TOR. Evaluation of price will be based upon price reasonableness determination. In-depth price analysis or cost evaluation is not typically required, but depends on the TO/DO contract type. To support a fair and reasonable price/cost finding, the price/cost analysis should include feedback from the technical evaluators that the skills mix and level of effort proposed appropriately represent the Contractor’s proposed approach and is adequate to successfully satisfy the TO/DO requirements (if this is part of your

TOR /DOR instructions). The DPCO shall evaluate the proposed price/cost as stated in the evaluation criteria in the TOR/DOR.

c. The KO/DPCO shall control all exchanges with Contractors. The DPCO may conduct negotiations to finalize order terms, conditions and price/cost.

Task Order/Delivery Order Decision Document (TODD/DODD). This is the single record that details the DPCO’s or other designated selection official’s integrated assessment and decision supporting selection of the best value proposal consistent with the stated evaluation criteria.

d. The PARC, of the applicable ordering agency, will provide reviews and approvals prior to award of TO/DO, if required.

e. The DPCO is required under FAR 16.505 to provide notifications to unsuccessful awardees and debriefings for orders IAW FAR 15.503 and 15.506 for all orders exceeding $5 million dollars. The debriefings may be provided orally, in writing or by any other method deemed appropriate to the DPCO. A best practice is to provide debriefings in writing.

f. The Contractor is not authorized to commence performance without a signed TO/DO or direction by a DPCO. Notwithstanding any of the other provisions of the IDIQ contract, a

DPCO shall be the only individual authorized on behalf of the Government to:

Accept nonconforming work; Waive any requirement of the TO/DO; or, Modify or waive any term or condition of the TO/DO.

g. The official TO/DO file will be maintained and administered at each Ordering Office, to include close-outs.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/16.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/15.htm

h. Upon release of the initial TO/DO award, a copy of the document shall be forwarded to the IDIQ KO.

CHAPTER 5 – ADDITIONAL TOR/DOR CONSIDERATIONS.

I. Contract Manpower Reporting. The Contract Manpower Reporting (CMR) requirement was established by the Assistant Secretary of the Army, Manpower and Reserve Affairs through memorandum dated March 8, 2005 , and implemented by PARC Policy Alert 08-29, dated 13 June 2008 & PARC Policy Alert 08-29-R1, dated 11 August 2008, Subject: Contractor

Manpower Reporting. The IDIQ contract includes the required provisions. However, all TOs, regardless of dollar amount, shall include a separate Contract Line Item Number for CMR in order to obtain better visibility of the Contractor service workforce from Contractors. The

CMR was designed to collect and report data regarding labor costs associated with the contract workforce and the organizations and missions that the contract workforce support. The CMR will ensure that the Army is getting full value from our contract workforce. Therefore, requiring activities shall add accounting for contract services to their requirement packages that are submitted to the Contracting Officer.

II. Organizational Conflict of Interest (OCI) at TO/DO Level. Due to the work to be performed under this Contract the Contractor is required to submit signed non-disclosure forms for all personnel working under this Contract.

(a) Organizational Conflicts of interest. Per FAR 9.5, organizational conflicts of interest may result when factors create an actual or potential conflict of interest on a contract, or when the nature of the work to be performed on the contract creates an actual or potential conflict of interest on a future acquisition. In this procurement, the Army has particular concerns that any proposal received from an offeror which would have the potential to perform services on any implementation contract to which that offeror is organizationally connected, is likely to result in an impermissible “Impaired Objectivity”, “Unequal Access to Information” or “Biased Ground

Rules” OCI (one or more), and thus be ineligible for award under FAR 9.5. Therefore, with respect to this Contract and subsequent TO/DOs, the contractor agrees that, in consideration of the award of this contract, the contractor, any subcontractor, consultant, or employee of the contractor, any joint venture involving the contractor, any entity with which it is or becomes affiliated by common ownership or with or into which it merges, or any successor or assignee of the contractor, shall not provide services as a prime, sub-Contractor or consultant under any systems integrator contract for current or future Army PEO EIS programs. The contractor shall include this requirement in subcontracts at all tiers. The contractor agrees that this restraint shall extend throughout this contract/task order period of performance, including any exercised options. The contractor agrees and acknowledges that compliance with this restraint at all tiers is a material requirement of this task order and the contract IAW FAR 9.505-1. The only exception to these restrictions will be if the contractor submits a comprehensive mitigation plan that, at the sole discretion of the DPCO, gives the Government confidence that any current or potential OCIs will be satisfactorily neutralized.

The Contractor agrees that if it assists in the preparation of non-developmental specifications or of work statements for a system or services under this Contract, or assists in the development of http://www.asamra.army.mil/scra/documents/SA%20Memo%2007JAN05%20-%20Accounting%20for%20Contract%20Services.pdf http://www.asamra.army.mil/scra/documents/SA%20Memo%2007JAN05%20-%20Accounting%20for%20Contract%20Services.pdf https://www.alt.army.mil/portal/page/portal/oasaalt/SAAL-ZP?_piref69_639563_69_639562_639562.tabstring=Procurement%20Policy%20and%20Support https://www.alt.army.mil/portal/page/portal/oasaalt/SAAL-ZP?_piref69_639563_69_639562_639562.tabstring=Procurement%20Policy%20and%20Support acquisition strategies or evaluation criteria or otherwise provides acquisition support under this

Contract, it will not be allowed to furnish these items or services, either as a prime Contractor, a sub-Contractor or as a consultant (FAR 9.505-2).

The Contractor agrees that if it gains access to proprietary data of other companies, it will protect such data and it will not use such proprietary data in supplying systems or components in future competitive procurements (FAR 9.505-4). In addition, the Contractor agrees to protect the proprietary data and rights of other organizations disclosed to the Contractor during performance of this Contract with the same caution that a reasonably prudent Contractor would use to safeguard highly valuable property. The Contractor also agrees that if it gains access to the proprietary information of other companies, that it will enter into an agreement with the other companies to protect their information from unauthorized use or disclosure for as long as it remains proprietary and refrain from using the information for any purpose other than that for which it was furnished.

The Contractor agrees that it will not distribute reports, data or information of any nature arising from its performance under this Contract, except as provided by this Contract or as may be directed by the Contracting Officer.

The Contractor agrees that it will include the above provisions, including this paragraph, in agreements with teaming partners, consultants or sub-Contractors at any tier which involve access to information covered above. The use of this clause in such agreements shall be read by substituting the word "teaming partner," "consultant," or "subcontractor" for the word

"Contractor" whenever the latter appears.

(b) Personal Conflicts of Interest. In the course of performance pursuant to this contract, Contractor employees will be participating personally and substantially in duties that have a direct and predictable effect upon other non-Federal entities. The Contractor agrees to use its best efforts to ensure those employees and others performing services under this contract avoid conflicts of interest or the appearance thereof. To that end, the Contractor agrees that its employees and others performing services under this contract will, prior to the commencement of performance, sign the Certificate of No Conflict of Interest set forth in (TBD at TO/DO level).

(c) Personal and Substantial. To participate personally means to participate directly. It includes the direct and active supervision of the participation of a subordinate in the matter. To participate substantially means that the employee's involvement is of significance to the matter.

Participation may be substantial even though it is not determinative of the outcome of a particular matter. However, it requires more than official responsibility, knowledge, perfunctory involvement, or involvement on an administrative or peripheral issue. A finding of substantiality should be based not only on the effort devoted to a matter, but also on the importance of the effort. While a series of peripheral involvements may be insubstantial, the single act of approving or participating in a critical step may be substantial. Personal and substantial participation may occur when, for example, an employee participates through decision, approval, disapproval, recommendation, investigation or the rendering of advice in a particular matter.

(d) Non-Disclosure. In the course of performance pursuant to this Contract, the Contractor will access nonpublic information, including acquisition sensitive information. The Contractor agrees that it will not use or disclose any such information unless authorized by the COR.

Contractor further agrees that it will use its best efforts to ensure that its employees and others performing services under this Contract will not use or disclose any such information unless authorized by the COR. To that end, the Contractor agrees that its employees and others performing duties under this Contract will, prior to the commencement of performance, sign the

Certificate of Non-Disclosure set forth in (TBD TO/DO level).

III. Addition of Clauses at TO/DO Level. Clauses may be added at the TO/DO level as long as they do not conflict with clauses included in the basic contract at IDIQ level. For example, Option Clauses 52.217-8, Option to Extend Services, and 52.217-9, Option to Extend the Term of the Contract, may be included and tailored at the TO/DO level as well as clauses related to government-furnished property.

IV. Government Property. Government Property means all property owned or leased by the

Government. Government property includes both Government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software (FAR 45.101). Contractors are ordinarily required to furnish all property necessary to perform Government contracts. DPCOs shall provide property to contractors only when it is clearly demonstrated (1) To be in the Government’s best interest, (2)

That the overall benefit to the acquisition significantly outweighs the increased cost of administration, including ultimate property disposal, (3) That providing the property does not substantially increase the Government’s assumption of risk; and (4) That Government requirements cannot otherwise be met. If the Government anticipates that Government

Property will be provided for use by the contractors under the contract, the DPCO shall incorporate all appropriate clauses and provisions into the resulting TOs/DOs in accordance with FAR Part 45, 52.245-1, and DFARS 252.211-7003, and DFARS 252.245-7002. Each order requiring the use of government property shall include a complete list of all property to be provided to the contractor .

V. Security Requirements. Ensure that security requirements have been coordinated with the customer and the Security Specialist. Ensure that the requirements of PGI 204.403, Responsibilities of contracting officers, are met. Contractors shall conform to all security requirements as specified in the DD Form 254 included in each order. If a security clearance is required, interim coverage may be obtained from the Department of Defense. Surveillance of

DD Form 254 requirements will be executed at the TO/DO level.

VI. Other Direct Costs. Other Direct Costs (ODC) may be included at the order level should conditions warrant. The solicitation stated this cost element is non-fee bearing. ODCs shall be authorized IAW FAR 31.202.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_215.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/45.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/45.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_237.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_000.htm http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_237.htm http://farsite.hill.af.mil/reghtml/regs/FAR2AFMCFARS/FARDFARS/DFARS/PGI%20204_4.htm?zoom_highlight=dd+254 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/31.htm

VII. Travel. The pricing model has established a travel CLIN on a Cost Reimburable basis.

The solicitation stated this cost element is non-fee bearing. The basis for allowable travel costs will comply with FAR 31.205-46.

CHAPTER 6, TO/DO PROCESS.

I. TOR/DOR Preparation.

a. Ideally, the DPCO will have coordinated with the customer in advance to discuss the requirement with regard to issues such as funding and contract type. The advanced coordination is highly recommended to establish realistic milestones, especially for situations requiring additional documentation and approval prior to issuance of the TOR/DOR, e.g.

bundling analysis, etc. The DPCO is responsible for ensuring required approvals are obtained timely.

b. The Customer submits the procurement package to the Ordering Office and provides documents to the KO/DPCO, e.g. Independent Government Cost Estimate; Funding Document;

Performance Work Statement/Statement of Work/Statement of Objective (PWS/SOW/SOO);

Evaluation Criteria consistent with the basic contract; Quality Assurance Surveillance Plan

(QASP); TO/DO metrics; and COR nomination IAW AR 70-13 and ACC Pamphlet 70-1.

Examples of other documents that may be applicable are: Service Contract Approval/Inherently

Governmental Function determination, within-scope statement, and Workload Data.

c. The DPCO (with assistance from the KO, as needed) determines whether the TO/DO requirement is within the IDIQ scope. The DPCO conducts market research to determine whether the IDIQ is the appropriate vehicle to satisfy the customer’s requirement.

d. Small Business Participation. The DPCO will evaluate how best to achieve compliance with the IDIQ Small Business participation goal of 23% by establishing a minimum order requirement for Small Business participation.

e. The DPCO prepares TOR/DOR to include applicable attachments, e.g.

(PWS/SOW/SOO), Workload Data, etc, due date for TOP/DOP return, period of performance and CLIN structure, discussion of TO/DO type, technical evaluation and basis for TO/DO award.

f. The DPCO submits TOR/DOR and attachments for appropriate reviews depending on applicable thresholds, e.g. to local legal office, PARC, etc.

II. TOP/DOP Evaluation.

a.