W52P1J-21-R0033 Final RFP.pdf

PDF 281 KB Posted

Attached to
Solicitation for Modular Handgun System Ammunition (MHSA) and Pistol Family Ammunition (PFA)
Solicitation number
W52P1J-21-R-0033
Issued by

About this file

This request for proposal solicits ammunition production and delivery for the U.S. Army. The solicitation seeks a supplier to produce .38 caliber, .45 caliber, 9mm M882, and 9mm MHS cartridges over five ordering periods. Production will include 13 Department of Defense Identification Codes, with a guaranteed minimum of 2 billion rounds and maximum of 500 billion rounds total. Pricing will utilize firm fixed prices and fixed prices with economic adjustment. Proposals are due on July 23, 2021, and award will result in a five-year indefinite delivery/indefinite quantity contract to a single offeror. Packaging, marking, and delivery requirements are specified.

View the file

Other files

File Type Posted
W52P1J21R0033-Amendment 0004.pdf PDF
Attachment 0001 - Price Matrix - Revised 26 Jul 2021.xlsx XLSX spreadsheet
W52P1J21R0033-Amendment 0003.pdf PDF
W52P1J21R0033-0002.pdf PDF
RFP W52P1J21R0033-Amendment 0001.pdf PDF
Attachment 0009 - Contract Delivery Schedule Template.xlsx XLSX spreadsheet
Attachment 0004 - NATO Production Test Statement of Work.pdf PDF
Attachment 0006 - Sensitive Arms Ammunition Explosives Classifications.pdf PDF
Attachment 0011 - Cal 38 45 9mm M882 Program Receiving and Weekly Reports.xlsx XLSX spreadsheet
Attachment 0013 - Contractor Owned Contractor Operated Security Statement of Work.pdf PDF
Attachment 0003 - OPSEC Plan Sample.pdf PDF
Attachment 0012 - 9mm MHS Program Receiving and Weekly Reports.xlsx XLSX spreadsheet
Attachment 0007 - Ammunition Data Card Component Listings.pdf PDF
Attachment 0001 - Price Matrix.xlsx XLSX spreadsheet
Attachment 0005 - EPA Material Content Factors.pdf PDF
Attachment 0008 - Contract Production Delivery Report SOW.pdf PDF
Attachment 0002 - CDRL Guidance.pdf PDF
Attachment 0014 - Small Business Participation Plan.pdf PDF
Attachment 0010 - Receiving and Weekly Report Instructions.xlsx XLSX spreadsheet
Exhibit A - PFA MHS Contract Data Requirements List (CDRLs).pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W52P1J-21-R-0033 X

2021JUN23

2021JUL2305:00pm

DOA6

2021JUN23 SEE SCHEDULE

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

MARK D. STEVENS

(309)782-2082

CCRI-AB

MARK.D.STEVENS.CIV@MAIL.MIL

1 109

X 1

X 6 X 8

X 11 X 25 X 43

X 51

X 53

X 54

X 83

X 84

X 95

X 103

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MARK D. STEVENS

Buyer Office Symbol/Telephone Number: CCRI-AB/(309)782-2082

Type of Contract 1: Fixed Price with EPA - Established Prices

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

EXECUTIVE SUMMARY_________________

(a) Request for Proposal (RFP) W52P1J-21-R-0033 is for a Pistol Family Ammunition (PFA) and Modular Handgun System (MHS) Ammunition supplier to produce .38 Caliber Cartridges, .45 Caliber Cartridges, 9mm M882 Cartridges, and 9mm MHS Cartridges.

(b) This RFP is issued on a Full and Open Competitive basis. The resulting award will be a five-year Indefinite Delivery Indefinite

Quantity (IDIQ) contract to a single Offeror. A combination of firm fixed prices (FFP) and fixed prices with Economic Price Adjustment

(EPA) will be utilized.

(c) Manufacture of the following 13 PFA/MHS Department of Defense Identification Codes (DODICs) will be required for this acquisition.

Caliber .38 Cartridges______________________

Contract Line Item Number (CLIN): X001

DODIC: A403

National Stock Number (NSN): 1305-00-810-8250

Nomenclature: Caliber .38, Special Blank

Top Cartridge Drawing: 12952155 (Detail Specification: DTL13041815)

CLIN: X002

DODIC: A404

NSN: 1305-00-123-0548

Nomenclature: Caliber .38, Special Match Wad-Cutter

Top Cartridge Drawing: 10521459 (Detail Specification: MIL-DTL-32653)

Caliber .45 Cartridges______________________

CLIN: X003

DODIC: A475

NSN: 1305-00-301-1685

Nomenclature: Caliber .45, Ball M1911

Top Cartridge Drawing: 6000503 (Detail Specification: MIL-DTL-1311)

CLIN: X004

DODIC: A482

NSN: 1305-00-892-4230

Nomenclature: Caliber .45, Wad-Cutter

Top Cartridge Drawing: 10521458 (Detail Specification: MIL-DTL-32579)

CLIN: X005

DODIC: A483

NSN: 1305-00-892-2526

Nomenclature: Caliber .45, Ball M1911 Match Grade

Top Cartridge Drawing: 8596136 (Detail Specification: MIL-DTL-46482)

9mm M882 Cartridges___________________

CLIN: X006

DODIC: AA49

NSN: 1305-01-470-2090

Nomenclature: Caliber 9mm Ball, M882 NATO (Commercial Pack)

Top Cartridge Drawing: 9345211 (Detail Specification: MIL-DTL-70508)

2 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CLIN: X007

DODIC: A363

NSN: 1305-01-172-9558

Nomenclature: Caliber 9mm Ball, M882 NATO (Military Pack)

Top Cartridge Drawing: 9345211 (Detail Specification: MIL-DTL-70508)

9mm MHS Cartridges__________________

CLIN: X008

DODIC: AC20

NSN: 1305-01-663-9409

Nomenclature: MHSA Caliber 9mm, M1152 Ball (Military Pack)

Top Drawing: 13068215 (Detail Specification: MIL-DTL-32658)

CLIN: X009

DODIC: AC21

NSN: 1305-01-663-9680

Nomenclature: MHSA Caliber 9mm, M1153 Special Purpose (Military Pack)

Top Drawing: 13068220 (Detail Specification: MIL-DTL-32657)

CLIN: X010

DODIC: AC22

NSN: 1305-01-663-9470

Nomenclature: MHSA Caliber 9mm, M1152 Ball (Commercial Pack)

Top Drawing: 13068215 (Detail Specification: MIL-DTL-32658)

CLIN: X011

DODIC: AC23

NSN: 1305-01-663-9617

Nomenclature: MHSA Caliber 9mm, M1153 Special Purpose (Commercial Pack)

Top Drawing: 13068220 (Detail Specification: MIL-DTL-32657)

CLIN: X012

DODIC: AC24

NSN: 1305-01-663-9712

Nomenclature: MHSA Caliber 9mm, M1156 Dummy Drilled Inert (Military Pack)

Top Drawing: 13068225 (Detail Specification: MIL-DTL-3498)

CLIN: X013

DODIC: AC60

NSN: 1305-01-691-4003

Nomenclature: MHSA Caliber 9mm, XM1157 Blank

Top Drawing: 13068230 (Performance Specification: MIL-PRF-0032670)

(d) The resulting five-year IDIQ contract will consist of the following Ordering Periods.

Ordering Period 1: Date of Award - September 30, 2023

Ordering Period 2: October 1, 2023 - September 30, 2024

Ordering Period 3: October 1, 2024 - September 30, 2025

Ordering Period 4: October 1, 2025 - September 30, 2026

Ordering Period 5: October 1, 2026 - Five Years From Date of Award

A unique Delivery Order number will be assigned to each Ordering Period upon the initial quantity award within that Ordering Period timeframe. The Delivery Order format will be W52P1J-XX-F-XXXX. Any contractual actions associated with a specific Delivery Order after the establishment of that Delivery Order will be accomplished through Modifications (W52P1J-XX-F-XXXX, Modification PXXXXX).

The unit prices contained in the Price Matrix (Section J, Attachment 0001) will be the unit prices used for all quantity awards.

Ordering Period unit prices will be based on the cumulative quantity awarded in each Ordering Period within a 120 day window. The initial quantity award within an Ordering Period starts the 120 day clock. After the expiration of that 120 days, the cumulative quantity starts back at zero. The next order within that Ordering Period will then restart the next 120 day clock. The beginning of a new Ordering Period will also cause the cumulative quantity to start back at zero. At the time of a quantity award, the unit price for the applicable DODIC/CLIN will be determined by adding the quantity awarded by that action to any previous awards for that applicable

DODIC/CLIN within 120 days prior. The Government will adjust unit prices for DODICs/CLINs previously awarded within an Ordering Period if the change in cumulative quantity results in a reduced unit price so long as the award is within the 120 day timeframe.

3 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

For example, assume the Ordering Period 1 unit price for the lowest quantity range for a particular DODIC/CLIN is $0.50 each, and the unit price for the next range for that particular DODIC/CLIN in Ordering Period 1 is $0.40 each. The initial Ordering Period 1 awarded quantity was within the lowest range and therefore was awarded at a unit price of $0.50 each. If the subsequent Ordering Period 1 award moves the cumulative quantity to the next range and is within 120 days of the initial award, the subsequent quantity being awarded will be priced at the $0.40 each unit price and the quantity previously awarded will have the unit price adjusted from $0.50 each to $0.40 each. NOTE: These unit prices are for illustration purposes only.

(e) The guaranteed minimum quantity for the resulting contract is 2,000,000 each (EA) in any combination of the 13 DODICs outlined above. This guaranteed minimum quantity shall be ordered/awarded by the first Delivery Order under Ordering Period 1 at the time that the Base IDIQ Contract is awarded. After the minimum guaranteed quantity has been ordered/awarded by the Government, the Government will not have any obligation to purchase additional quantities under the contract.

(f) During the life of resulting contract, the Government is entitled to order a maximum total quantity of 500,000,000 EA in any combination of the above listed DODICs.

(g) An EPA for Copper and Lead (see Section I Narrative I0001, Economic Price Adjustment (EPA) for Copper and Lead) will be included for ___________________________________________________ specific DODICs and will apply to Ordering Periods 2 through 5 only.

(h) Any components/supplies obtained OCONUS shall be shipped using U.S. Flag Vessels per DFARS 252.247-7023, Transportation of Supplies ___________________________ by Sea. The process to obtain a U.S. Flag Vessel for transportation may result in delays and U.S. Flag Vessels are typically more______ expensive. The U.S. Flag Vessel requirement is normally not waived, so an Offeror's proposal must not be based upon an expected waiver of the U.S. Flag Vessel requirement.

(i) As outlined in Sections L and M of this RFP, a best value subjective tradeoff approach will be used to evaluate proposals submitted in response to this RFP. The Government reserves the right to make award to other than the lowest priced Offeror for non-price factors.

The Government anticipates receiving adequate price competition under this RFP; therefore, certified cost or pricing data is not required to be submitted with proposals. However, in the event the Procuring Contracting Officer (PCO) determines that adequate competition does not exist, the Government reserves the right to require that certified cost or pricing data be submitted.

(j) The Government intends to award without discussions; therefore, each proposal should contain the Offeror's best terms for award of a contract under this RFP. The PCO may contact Offerors for clarifications, as described in FAR 15.306(a) and Section L, FAR 52.215-1, Instructions to Offerors - Competitive, without opening discussions. However, the Government reserves the right to conduct discussions______________________________________ and to permit Offerors to revise their proposals if determined necessary by the PCO.

(k) Offerors shall propose pricing using the Price Matrix (Section J, RFP Attachment 0001) as outlined in Section L of this RFP. Prices entered anywhere other than this Price Matrix will not be considered. The pricing ranges are provided for the purpose of establishing reasonable quantities against which to provide unit prices. The weights established in the Price Matrix are for evaluation purposes only. They are not a guarantee of quantities to be awarded.

(l) Offerors are to submit prices on a Free On Board (F.O.B.) Origin basis. The Government is only responsible for the costs associated with the shipment of the deliverable end item. The contractor is responsible for all other shipping.

(m) Deliveries will be in accordance with the schedules set forth in Section F Narrative F0002, Required Delivery Schedule. __________________________

(n) Technical documents included in this RFP are marked with Distribution Statement D and F. To obtain the Technical Data Packages

(TDPs) for this RFP, Offerors must request explicit access through "Contract Opportunities" in the SAM.gov website. Search for W52P1J-21-

R-0033 and choose the "Attachments/Links" tab . Request access to the document titled "TDP Request W52P1J-21-R-0033". When prompted for

"Reason for Request", Offerors shall enter the following: "I am requesting access to the .zip file for the TDPs under RFP W52P1J-21-R-

0033. My CAGE Code is XXXXX". Successful completion of this will prompt a Government point of contact to send the TDPs to the requesting data custodian via the DoD SAFE website. In accordance with the Section C Narrative C0002, Special License Agreement, Offerors will be _________________________ required to sign a Non-Disclosure Agreement in order to access the TDPs for DODICs AC20, AC21, AC22, AC23, AC24 and AC60.

Offerors must have an approved DD Form 2345, Military Critical Technical Data Agreement, on file with the Joint Certification Program __________________________________________

(JCP) in order to be granted access to the TDPs. Restricted technical data will not be available to an Offeror who has not been certified. NOTE: The TDP requestor must be the Data Custodian in the JCP database or the TDP request will be denied.

To verify who your data custodian is, please log into:

https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/www.dlis.dla.mil/jcp/ and use the Cage Code search function.

(o) Program Reviews and Teleconferences are a requirement of this contract. See Section C Narrative C0003, Program Reviews and ____________________

Teleconferences, for details._______________

(p) Submission of representative production samples to the North Atlantic Treaty Organization (NATO) North American Regional Test Center

4 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(NARTC) is a requirement of this acquisition. See Section C Narrative C0007, NATO Production Testing, and the NATO Production Test _______________________

Statement of Work (Section J, RFP Attachment 0004) for further details.

(q) All contractual provisions specified are obligatory for the prime contractor. The prime contractor is responsible for enforcing contractual provisions upon any subcontractors/suppliers/vendors.

(r) These items are considered to be sensitive ammunition/explosives that require a Pre-Award Survey, which at a minimum shall address safety and security considerations, to be completed at the applicable place(s) of performance.

(s) Note for Other Than Small Businesses ONLY. Separate from Small Business Participation, Other Than Small Business Offerors shall also submit a Small Business Subcontracting Plan as required by FAR 19.7 (FAR Clause 52.219-9, Small Business Subcontracting Plan). The Small __________________________________

Business Subcontracting Plan will be reviewed when the apparent awardee is determined. In accordance with Army Federal Acquisition

Regulation Supplement Appendix DD, the Small Business Subcontracting Plan must correlate with the percentages of small business utilization identified in the Offeror's Small Business Participation Plan in order to be eligible for award. For Offerors utilizing a

Commercial Subcontracting Plan, the Offeror shall also provide an explanation showing how the percentages of small business utilization identified in the Offeror's Small Business Participation Plan correlate to the goals in its Commercial Subcontracting Plan in order to be eligible for award.

The Government has established the following goals for this procurement based on total contract value (including all Ordering Periods).

Small Business (SB) - 13%

Small Disadvantaged Business (SDB) - 1%

Women-Owned Small Business (WOSB) - 1%

HUBZone Certified Small Business (HUBZone) - 1%

Veteran-Owned Small Business (VOSB) - 1%

Service Disabled Veteran-Owned Small Business (SDVOSB) - 1%

(t) Offerors must ensure their proposals are fully complete, including all fill-ins within the RFP. Proposals shall be submitted no later than the date specified in Block 9 of the Standard Form (SF)33 and shall remain valid for 240 days from the closing date of this

RFP. Please ensure Page 1, Block 12 is completed with 240 days. Receipt of an Offeror's proposal in response to this RFP is an affirmation that the Offeror has had access to and received adequate information to prepare a proposal.

(u) Offerors must have an active registration in the System for Award Management (SAM) in order to be considered for award. Offerors are required to be registered in SAM at the time of proposal submission. The website for SAM registration is www.SAM.gov .

(v) Pursuant to FAR 9.103, a contract will only be awarded to a contractor that the PCO determines to be responsible. Offerors must be able to demonstrate that they meet the standards of responsibility set forth in FAR 9.104.

(w) The successful Offeror's proposal in response to this RFP may be incorporated in whole or part as a material term of the resultant contract and failure to fully implement it may result in termination. No revisions or changes to the Offeror's proposal may be made after award without prior approval from the PCO. The contract requirements take precedence over the incorporated proposal should a conflict exist.

(x) Government Furnished Test Equipment (GFE) will be supplied for performance of the resultant contract. See Section E Narrative

E0005, Government Furnished Test Equipment (GFE), for further details for the types and quantities of test weapons to be provided. _________________________________________

Reference rounds/cartridges will not be provided by the Government for this acquisition. See Section E Narrative E0011, Sporting Arms ______________ and Ammunition Manufacturers' Institute (SAAMI) Reference Cartridges, for further details.____________________________________________________________________

(y) The cognizant ACC-RI PCO is the only individual authorized to issue awards, modifications, and changes under the resultant contract.

In the event a configuration change should materialize after contract award, it will be negotiated in accordance with the Changes clause

(FAR 52.243-1, Changes-Fixed Price). ___________________

(z) This RFP should not be discussed with any Government employee except the PCO, Ms. Lana Graw, or her representative, Mr. Mark

Stevens. Ms. Lana Graw can be contacted by email at lana.r.graw.civ@mail.mil. Mr. Mark Stevens can be contacted by email at mark.d.stevens.civ@mail.mil. Failure to adhere to this restriction may be grounds to declare your firm ineligible for consideration of award resulting from this RFP.

*** END OF NARRATIVE A0001 ***

5 109

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PRODUCTION QUANTITY ___________________

All proposed unit prices for production quantities shall be entered into the Section J, RFP Attachment

0001, Price Matrix. ____________

Production Quantities:

Inspection at Origin

Acceptance at Origin

F.O.B. Origin

(End of narrative B001)

6 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

FIRST ARTICLE_____________

All proposed prices for First Article Tests shall be entered into the Section J, RFP Attachment 0001, Price Matrix. ____________

See Section E Narrative E0006, First Article Test (Contractor Testing), for First Article Test requirements. _______________________________________

First Article Test Report:

Inspection at Origin

Acceptance at Destination

*** END OF NARRATIVE B0001 ***

CONTRACT DATA REQUIREMENTS LIST (CDRLs)_______________________________________

***** CDRLs shall not be separately priced *****

Information required by the individual CDRL shall be delivered as specified in the Section J, RFP Exhibit A, Contract Data Requirements ___________________________

List (CDRLs).____________

*** END OF NARRATIVE B0002 ***

DELIVERY SCHEDULE_________________

See Section F Narrative F0002, Required Delivery Schedule, for details. __________________________

*** END OF NARRATIVE B0003 ***

ORDERING________

See Section I clauses 52.216-19, Order Limitations; 52.216-22, Indefinite Quantity; and 52.216-18, Ordering, for details. _________________ ___________________ ________

*** END OF NARRATIVE B0004 ***

7 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

CONTRACTUAL BASELINE REPORT___________________________

The Technical Data Packages (TDPs) issued through "Contract Opportunities" in the SAM.gov website in conjunction with this RFP will serve as the TDP baseline at the time of contract award. After contract award, Engineering Change Proposals (ECPs) and/or Requests for

Variations (RFVs) may be incorporated via contract modification. Reference Section J, Exhibit A, CDRL A018 regarding a requirement for a

Contractual Baseline Report which would annotate the baseline TDP for each DODIC supplemented with any ECPs/RFVs subsequently incorporated. The contents of the Baseline Report shall be for informational purposes only. The contract and any subsequent modifications shall take precedence.

*** END OF NARRATIVE C0001 ***

SPECIAL LICENSE AGREEMENT_________________________

In accordance with DFARS 252.227-7013, Rights in Technical Data--Noncommercial Items, all data related to the MHS Cartridges are subject _____________________________________________ to the Special License Agreement for Modular Handgun System Intellectual Property between the U.S. Government and Sig Sauer dated

January 2019. The aforementioned agreement grants the U.S. Government "MHS Purpose Rights" which allows the disclosure of the MHS

Technical Data outside of the Government for this procurement but does not include the rights to use, modify, reproduce, release, perform, display, or disclose technical data for commercial purposes or authorize others to do so. In order to obtain the MHS Technical

Data, it is required that the offeror first execute a Non-Disclosure Agreement that protects the interests of the Sig Sauer and each of its Team Members as provided in the Special License Agreement.

*** END OF NARRATIVE C0002 ***

PROGRAM REVIEWS AND TELECONFERENCES___________________________________

(a) Program Reviews: Upon request by the PCO, the prime contractor shall hold Program Reviews, generally on a quarterly basis, at a location and time to be established by the Government. Responsible and cognizant contractor personnel shall attend these reviews to provide cognizant Government personnel with a status update, accomplishments during the previous period, and a review of any technical and administrative issues associate with the program. Program Review briefing charts shall be submitted to the PCO, PM MAS Program Lead, and Joint Munitions Command (JMC) Production Leads at least five working days in advance of the scheduled Program Review.

(b) Teleconferences: Teleconferences shall be conducted by the PFA/MHS Integrated Product Team (IPT), consisting of Government and prime contractor personnel. These teleconferences will be held at mutually agreed to times or at the discretion of the PCO. Their purpose is to ensure that pertinent program issues are addressed in a timely manner. The contractor shall provide an action item list for the teleconference at least one working day in advance of the teleconference. The Government reserves the right to require IPT teleconferences for each individual PFA/MHS cartridge family and an overarching contract IPT.

*** END OF NARRATIVE C0003 ***

OPERATIONS SECURITY (OPSEC) REQUIREMENTS________________________________________

(a) As defined in Army Regulation (AR) 530-1, Operations Security (OPSEC), sensitive information is information requiring special protection from disclosure that could cause compromise or threat to our national security, an Army organization, activity, family member, DA civilian or DoD contractor. Critical Information is defined as information important to the successful achievement of U.S.

objectives and missions, or which may be of use to an adversary of the United States. It consists of specific facts about friendly capabilities, activities, limitations (includes vulnerabilities), and intentions needed by adversaries for them to plan and act effectively so as to degrade friendly mission accomplishment. All critical information is sensitive, but not all sensitive information is critical.

(b) The contractor shall not release sensitive information to the general public without prior written approval from the Contracting

Officer (PCO). All contractor requests to release sensitive information shall be in writing and clearly explain the necessity for release of the information and consequences if approval is not granted. Contractor employees who are U.S. citizens shall be provided access to sensitive information on a "need to know" basis required to fulfill the terms and conditions of the contract. Foreign

8 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

National (FN) employees' access to information will be limited to non-sensitive information. FN access to sensitive information will be approved in writing by the PCO on a case-by-case basis, and will be strictly limited to the information that the employee must know in order to fulfill the terms and conditions of the contract.

(c) The PCO will provide the contractor with a list of known Critical Information (CI) pertinent to contract requirements as soon as possible after contract award. Critical Information shall be used by the contractor's appointed OPSEC Manager to prepare an OPSEC Plan.

For an OPSEC Plans sample, see Section J, RFP Attachment 0003, Operations Security (OPSEC) Plan Sample. _______________________________________

(d) The contractor shall be responsible for establishing and maintaining an OPSEC program to adequately manage, protect and control sensitive information that has been provided or generated under the contract. The contractor shall prepare and submit a written OPSEC

Plan to the PCO for approval IAW DD 1423/DI-MGMT-80934C within 30 calendar days after receipt of the CI information addressed in

Paragraph 3 above to be reviewed and approved by the responsible Government OPSEC officer. The contractor shall implement OPSEC measures as ordered by the Government. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.

This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. The PCO will coordinate with the Government OPSEC Officer and advise the contractor in writing of the approval, conditional approval or disapproval of the plan within 20 days of receipt.

(e) The contractor shall conduct annual self-assessments of their OPSEC program and submit annual written assessments to the PCO in the anniversary month of contract award. OPSEC Assessment checklists and sample assessment responses will be provided in advance by the

Government as tools to aid the contractor in assessing their OPSEC program.

(f) The contractor's Level II certified OPSEC Officer/Coordinator shall provide OPSEC training to all employees regarding the safeguarding of sensitive information prior to employees being allowed access to such information, and annually thereafter.

(g) The contractor shall destroy all sensitive program material at the completion of the contract so as to ensure the information cannot be accessed or utilized for any purpose and notify the PCO in writing of its destruction.

(h) These same requirements will flow down to all subcontractors working on or provided any sensitive information related to the contract.

*** END OF NARRATIVE C0004 ***

CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION_____________________________________________

(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the

Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, NORs, and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notices of Revision (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the

Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form

1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the

ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated

9 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

*** END OF NARRATIVE C0005 ***

CONTRACT PRODUCTION, DELIVERY, AND GOVERNMENT FURNISHED EQUIPMENT/MATERIAL REPORTING____________________________________________________________________________________

The contractor will be required to submit recurring reports of varying frequency pertaining to production and delivery progress/status, and Government Furnished Equipment/Material status. The contractor is responsible for executing the Section J, RFP Attachment 0008, Contract Production, Delivery, and Government Furnished Equipment/Material Reporting Statement of Work. The applicable report templates______________________________________________________________________________________________________ are included in Section J, RFP Attachments 0009 through 0012. Reports will be submitted for all items procured under this contract unless specifically excluded by the PCO.

*** END OF NARRATIVE C0006 ***

NATO PRODUCTION TESTING_______________________

The contractor shall be responsible for the delivery of representative sample(s) of ammunition to the North Atlantic Treaty Organization

(NATO) North American Regional Test Center (NARTC) located at the Lake City Army Ammunition Plant (LCAAP) in Independence, Missouri, for

NATO Production Testing. This is required in order to determine if the U.S. ammunition designs, that are currently qualified to be used by NATO Member Forces, continue to meet the NATO standards for battlefield interchangeability, and merit the application of the NATO

Symbol of Interchangeability. There is also a requirement to submit a respresentative sample for NATO Qualification of the M1152 9mm

MHS design. See Section J, RFP Attachment 0004, NATO Production Test Statement of Work, for further details. ______________________________________

*** END OF NARRATIVE C0007 ***

10 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

PACKAGING REQUIREMENTS______________________

CLIN: X001

DODIC: A403

NSN: 1305-00-810-8250

NOMENCLATURE: Caliber .38, Special Blank

(a) Packaging shall be in accordance with F00-810-8250 revision K, dated 14 MAY 1993.

(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

(c) Marking shall be in accordance with F00-810-8250, revision K, dated 14 MAY 1993. 2-D barcodes are required in accordance with 12999545, rev J, dated 26 January 2018.

(d) The following shall apply to drawing F00-810-8250, revision K, dated 14 MAY 1993:

(e) PERFORMANCE ORIENTED PACKAGING (POP)

(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented

Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. For multi-year contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.

(f) EXCEPTION TO POP MARKINGS

(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

(g) POP VERIFICATION

(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.

(h) Palletization shall be in accordance with 19-48-4116/12C, revision 2, dated 01 JUL 1986. 19-48-4116, Revision 14, dated 01 DECEMBER

2019, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with

ACV00561, Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D barcodes are required.

CLIN: X002

DODIC: A404

NSN: 1305-00-123-0548

NOMENCLATURE: Caliber .38, Special Match Wad-Cutter

(a) Packaging shall be in accordance with 9396206 revision AT, dated 21 DEC 2020.

(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

(c) Marking shall be in accordance with 9396206, revision AT, dated 21 DEC 2020. 2-D barcodes are required in accordance with

12999545, rev J, dated 26 January 2018.

(d) The following shall apply to drawing 9396206, revision AT, dated 21 DEC 2020:

(e) PERFORMANCE ORIENTED PACKAGING (POP)

(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented

Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will

11 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. The POP test report shall be generated by the Manufacturer/Laboratory following the test. The report must be kept on file by the contractor and submitted as required by the Contract Data Requirement List. For multi-year contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.

(f) EXCEPTION TO POP MARKINGS

(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

(g) POP VERIFICATION

(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.

(h) HEAT TREAT WOOD QUALITY MARKING

(1)In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM shall be constructed from heat-treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(i) MARKING

(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.

(j) Palletization shall be in accordance with 19-48-4116/12, revision 1, dated 01 JUL 1985. 19-48-4116, Revision 14, dated 01 DECEMBER

2019, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with

ACV00561, Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D barcodes are required.

CLIN: X003

DODIC: A475

NSN: 1305-00-301-1685

NOMENCLATURE: Caliber .45, Ball M1911

(a) Packaging shall be in accordance with 9396206 revision AT, dated 21 DEC 2020.

(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

(c) Marking shall be in accordance with 9396206, revision AT, dated 21 DEC 2020. 2-D barcodes are required in accordance with

12999545, rev J, dated 26 January 2018.

(d) The following shall apply to drawing 9396206, revision AT, dated 21 DEC 2020:

(e) PERFORMANCE ORIENTED PACKAGING (POP)

(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented

Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. For multi-year contracts, the contractor shall re-perform POP testing at a certified

12 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.

(f) EXCEPTION TO POP MARKINGS

(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

(g) POP VERIFICATION

(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.

(h) HEAT TREAT WOOD QUALITY MARKING

(1)In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM shall be constructed from heat-treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(i) MARKING

(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.

(j) Palletization shall be in accordance with 19-48-4116/13, revision 3, dated 01 OCT 2018. 19-48-4116, Revision 14, dated 01 DEC 2019, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with ACV00561, Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D barcodes are required.

CLIN: X004

DODIC: A482

NSN: 1305-00-892-4230

NOMENCLATURE: Caliber .45, Wad-Cutter

(a) Packaging - Preservation, packaging, packing, unitization and marking furnished by the supplier shall provide protection for a minimum of one year, provide for multiple handling, redistribution and shipment by any mode and meet or exceed the following requirements.

(1) Cleanliness - Items shall be free of dirt and other contaminants which would contribute to the deterioration of the item or which would require cleaning by the customer prior to use. Coatings and preservatives applied to the item for protection are not considered contaminants.

(2) Preservation - Items susceptible to corrosion or deterioration shall be provided protection such as preservative coatings, volatile corrosion inhibitors, desiccants, water-proof and/or water-vapor-proof barriers.

(3) Cushioning - Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, critical material) or which could cause physical damage to other items, shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration and prevent damage during handling and shipment.

(b) Packing

(1) Unit packages and intermediate packages meeting the requirements for a shipping container may be utilized as shipping containers.

13 109

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

All shipping containers shall be the most cost effective and shall be of the minimum cube to contain and protect the items. A unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), and with minimal damage to the unit pack during shipment and storage in the shipping container, and will allow subsequent handling.

(2) Bulk Packaging - Items packaged directly in shipping containers shall be separated with pads, liners, partitions or dividers as required to protect the parts, strengthen the container and to distribute the load.

(3) Unit Package Quantity - Unless otherwise specified, the unit package quantity shall be one each part, set, assembly, kit, etc.

(4) Shipping Containers - The shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. The shipping container shall be capable of multiple handling, stacking at least ten feet high, and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.

(c) Unitization

(1) Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred commercial expendable pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(d) Marking

(1) All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R with change 2, Dated: 21 Sep 2019 including 2-D bar coding on outer shipping container and the unitized load. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, shelf-life markings, structural markings, and transportation special handling markings.

(e) Hazardous Materials

(1) A hazardous material is defined as a substance which has been determined by the Department of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Title 49 CFR and other applicable modal regulations effective at the time of shipment.)

Ammuniti…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .