Attachment 0008 - Contract Production Delivery Report SOW.pdf

PDF 163 KB Posted

Attached to
Solicitation for Modular Handgun System Ammunition (MHSA) and Pistol Family Ammunition (PFA)
Solicitation number
W52P1J-21-R-0033
Issued by

About this file

This statement of work outlines production and delivery reporting requirements for a solicitation seeking ammunition production. The contractor must submit monthly receiving reports and weekly production status reports utilizing government templates. Delivery schedules are required at the DODIC level in six-month increments with planned monthly quantities. The contractor must also submit weekly ammunition shipment reports and conduct semi-annual physical inventories of government furnished material and equipment with documentation. Inventory must be maintained for ballistics testing of government cartridge lots using government furnished weapons and spare parts.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT PRODUCTION, DELIVERY, AND GOVERNMENT FURNISHED

EQUIPMENT/MATERIAL REPORTING

STATEMENT OF WORK (SOW)

1. OBJECTIVE: To identify contractor production progress and status reporting requirements.

2. REQUIREMENTS: The contractor shall submit production progress and status reports for all items procured under this contract in accordance with the requirements herein. The contractor shall utilize the Contract Data Requirements List (CDRLs) and corresponding templates for identification of the required elements/format, frequency, and distribution for each production report.

2.1. Production Status Report for Family of Items – The contractor shall maintain and submit Production Status Reports utilizing the Government provided Excel templates (see CDRL A025 and Section J, RFP Attachments 0011 and 0012 with instructions provided in RFP Attachment 0010). Each of the requirements in paragraphs 2.1.1 and

2.1.2 is a separate tab within each Excel workbook. The contractor shall submit each requirement utilizing the formats provided.

2.1.1. Receiving Report Status – The contractor shall report all production acceptances entered into Wide Area Workflow. The report will contain DD250 data only for the current month of production.

2.1.2. Weekly Production Status – The contractor shall report weekly production status.

The report will contain production data only for the current month of production.

2.2. Contract Delivery Schedule – The contractor shall submit a contract delivery schedule (see CDRL A024 and Section J, RFP Attachment 0009), at the DODIC level and in 6-month increments known as delivery periods with planned monthly quantities and for all undelivered quantities in accordance with Section F Narrative F0002 of the

RFP.

2.3. Ammunition Shipment Report – The contractor shall submit a weekly report providing all shipments of Government-owned materiel (see CDRL A027).

2.4. Government Furnished Material (GFM) and Government Furnished Equipment (GFE) – Use of GFE (weapons and spare parts) shall be used solely for the purpose of testing Government cartridge lots per the Technical Data Package (TDP) requirements.

Government cartridge lots, identified with the manufacture identification symbol as any cartridge lots that are submitted and accepted as Government product.

2.4.1. The contractor shall maintain an inventory for all GFM and GFE and be responsible for 100 percent physical inventory and reconciliation on a semi-annual basis. The contractor shall certify completion and submit all documentation to the

ATTACHMENT 0008 / RFP W52P1J-21-R-0033

Government in accordance with CDRL A026. Additional inventories may be requested as necessary by the Government.

2.4.2. GFE Weapon and Spare Parts.

2.4.2.1. The contractor shall maintain a minimum of six months of weapons and spare parts inventory for ballistics testing in support of Government production.

2.4.2.2. The contractor shall consult the JMC Weapons Manager to verify obsolescence of any GFE before disposition (reached end of useful life, out of specification to the Technical Data Package (TDP), etc.). For any GFE that does not meet specifications in the TDP, the contractor shall issue a Production Quality Deficiency Report (PQDR) or Supply Deficiency Report (SDR) as appropriate. If deemed unserviceable, the contractor shall coordinate all disposition actions with the JMC Weapons Manager.

May 20, 2021