This document includes a solicitation for a five-year Indefinite Delivery Indefinite Quantity contract to produce ammunition for the U.S. Army. The solicitation seeks proposals for the production of .38 caliber, .45 caliber, 9mm M882, and 9mm Modular Handgun System ammunition. The guaranteed minimum order is 2 million rounds of any combination of the listed ammunition DODICs, with a maximum total quantity of 500 million rounds over the life of the contract. Pricing will utilize a combination of Firm Fixed Price and Fixed Price with Economic Price Adjustment terms. The closing date for proposals is July 23, 2021. The contracting agency is the U.S. Army Contracting Command, Rock Island on behalf of the Office of the Program Manager, Maneuver Ammunition Systems.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rec Report Status Instructions

Attachment 0010 RFP W52P1J-21-R-0033 May 20, 2021RECEIVING REPORT STATUS - 9mm MHS
DD-MMM-YY1
DATEDATEDATEDD250'sDD250'sDD250's
DODIC2DD250#3LOT #4QUANTITY5PRODUCED6PRESENTED7SIGNED8CLIN9MILSTRIP10SUPP ADD11COMMENTS12PRODUCEDPRESENTEDSIGNED
The contractor shall keep a running total throughout the month, then clear the file for the subsequent month. If more rows are needed for a DODIC(s), the contractor shall copy the formulas in Columns N, O, and P.

1. Enter date of report in DD-MMM-YY Format.

2. DODIC as indicated on contract. Do not change/edit this field

3. Enter DD250 number as indicated on WAWF.

4. Enter lot number using the 13 alpha-numberic format.

5. Enter the lot quantity.

6. Date Produced: The date in which the government lot has been packed out (canned, crated, palletized).

7. Date Presented: The date in which the lot has been preseneted to the Governmnet for signature..

8. Date Signed: The date in which the Government signs the DD250 and is in USG ownership.

9. CLIN: Enter the 6-character CLIN as it appears in the contract.

10. MILSTRIP: Enter the 14-character MILSTRIP as it appears in the contract.

11. SUPPADD: Enter the 6-character supplementary address as it appears in the contract.

12. Comments: Enter remarks with respects to the ammunition lot if needed.

13. The DD250 Produced, Presented and Signed columns are calculations. Do not enter anything into these cells.

AC20

AC20 TOTALTargetProducedPresentedSigned
000

AC21

AC21 TOTALTargetProducedPresentedSigned
000

AC22

AC22 TOTALTargetProducedPresentedSigned
000

AC23

AC23 TOTALTargetProducedPresentedSigned
000

AC24

AC24 TOTALTargetProducedPresentedSigned
000

AC60

AC60 TOTALTargetProducedPresentedSigned
000
9MMMHSTOTALTargetProducedPresentedSigned
0000

a

Weekly Production Instructions

Weekly Production Status Report - 9mm MHS
DD-MMM-YY1
Monthly Plan2Actual3Cum Variance4Monthly PlanActualCum Variance
22-Apr022-Oct0
The contractor shall keep a running total throughout the month, then clear the file for the subsequent month.

1. Enter date of report in DD-MMM-YY Format.

2. Monthly Plan: Enter the monthly plan for the entire Governmnet Fiscal Year (GFY) that is on contract.

3. Actuals: Enter the monthly actuals at the end of each month throughtout the GFY

4. Cum Variance: Automated field.

5. Monthly Plan: This field is a DODIC breakout for the current month of production. The total quantity should match the monthly plan above under the month of production, i.e., if Jan '21 monthly plan is 10M rounds, the monthly plan DODIC breakout should total 10M.

6. Current Target: The total quantity the contractor estimates will be DD250'd in the current month.

7. Carryover: Quantity produced from prior month(s) that did not get signed, but will get signed in the current month.

(If there is carryover product on hold for an extended period of time, only put the carryover on the chart for the month it is anticipated to be DD250’d)

8. Produced: The quantity that has been packed out (canned, crated, palletized) in the current month.

9. DD250 Presented: The quantity that has been preseneted to the Governmnet for signature, but not signed.

10. Total Accepted: The quantity that the Government has signed in the current month.

11. Remarks: Any remarks the contractor would like to enter for the Government's awareness.22-May022-Nov0
22-Jun022-Dec0
22-Jul023-Jan0
22-Aug023-Feb0
22-Sep023-Mar0
6-Mth Period006-Mth Period00
MONTHLY PLAN5CURRENT TARGET6CARRYOVER7PRODUCED8DD250 PRESENTED9TOTAL
SIGNED10COMMENTS11
AC20M1152 Ball (Military Pack)
AC21M1153 Spc Purpose (Military Pack)
AC22M1152 Ball (Commercial Pack)
AC23M1153 Spc Purpose (Comm Pack)
AC24M1156 Dummy Drilled Inert
AC60XM1157 Blank

Total 0 0 0 0 0 0