Attachment 2 Proposed Pricing Sheet (Updated per Amendment 0002).xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Natural Gas Pipeline Service Contract Federal contract opportunity
- Solicitation number
- W51AA124R0030
- Issued by
- Department of the Army
About this file
This document is an Attachment 2 - Proposed Pricing Sheet for Solicitation W51AA1-24-R-0030 for a Natural Gas Pipeline Preventative Maintenance/Repair Service Contract. The solicitation is for a non-personal services contract to provide natural gas pipe operation and maintenance to Tobyhanna Army Depot.
The pricing sheet outlines Contract Line Items (CLINs) for the base year and four option years. The CLINs include: Firm Fixed Price (FFP) for preventative maintenance, Time and Materials (T&M) labor rates for scheduled and emergency repairs, FFP for valve/meter/diaphragm removal and replacement, and FFP for utility locating services. Offerors are instructed to enter pricing for each CLIN, with the total evaluated price to be used for evaluation purposes only. The solicitation states the Service Contract Labor Standards apply to this acquisition.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 2 - Pricing Table for Solicitation W51AA1-24-R-0030 |
| Natural Gas Pipeline Preventative Maintenance/Repair Service Contract |
| **This attachment shall be submitted as part of the offeror's proposal. | |||||||||
| Contract Line | |||||||||
| Number (CLIN) | Description | Quantity | Unit | Unit Price | Total Price | ||||
| CLIN 0001 | Base Year | FFP | Preventative Maintenance | 12 | Lot | $0.00 | Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month. | ||
| CLIN 0002 | Base Year | T&M | Repair - Technician Rate | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||
| CLIN 0002 | Base Year | T&M | Repair - Laborer Rate (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||
| CLIN 0002 | Base Year | T&M | Repair - Machine Operator (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||
| CLIN 0002 | Base Year | T&M | Repair - Foreman (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||
| CLIN 0002 | Base Year | T&M | Emergency Repairs - Technician Rate | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||
| CLIN 0002 | Base Year | T&M | Emergency Repairs - Laborer Rate (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||
| CLIN 002 | Base Year | T&M | Emergency Repairs - Machine Operator (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||
| CLIN 002 | Base Year | T&M | Emergency Repirs - Foreman (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. | ||
| CLIN 0003 | Base Year | FFP | Valve removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. | ||
| CLIN 0003 | Base Year | FFP | Meter removal and replacement | 16 | Lot | $0.00 | Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 16 per year. Inculde labor and material. | ||
| CLIN 0003 | Base Year | FFP | Diaphragm removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. | ||
| CLIN 0004 | Base Year | FFP | PaOneCalls - Utility Locating | 100 | Lot | $0.00 | Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year. | ||
| CLIN 0004 | Base Year | FFP | Emergency PaOneCalls - Utility Locating | 5 | Lot | $0.00 | Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. | ||
| Total Evaluated Price for the Base Year | $0.00 |
| CLIN 1001 | Option Year 1 | FFP | Preventative Maintenance | 12 | Lot | $0.00 | Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month. |
| CLIN 1002 | Option Year 1 | T&M | Repair - Technician Rate | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 1002 | Option Year 1 | T&M | Repair - Laborer Rate (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 1002 | Option Year 1 | T&M | Repair - Machine Operator (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 1002 | Option Year 1 | T&M | Repair - Foreman (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 1002 | Option Year 1 | T&M | Emergency Repairs - Technician Rate | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 1002 | Option Year 1 | T&M | Emergency Repairs - Laborer Rate (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 1002 | Option Year 1 | T&M | Emergency Repairs - Machine Operator (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 1002 | Option Year 1 | T&M | Emergency Repirs - Foreman (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 1003 | Option Year 1 | FFP | Valve removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. |
| CLIN 1003 | Option Year 1 | FFP | Meter removal and replacement | 16 | Lot | $0.00 | Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 16 per year. Inculde labor and material. |
| CLIN 1003 | Option Year 1 | FFP | Diaphragm removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. |
| CLIN 1004 | Option Year 1 | FFP | PaOneCalls - Utility Locating | 100 | Lot | $0.00 | Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year. |
| CLIN 1004 | Option Year 1 | FFP | Emergency PaOneCalls - Utility Locating | 5 | Lot | $0.00 | Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. |
| Total Evaluated Price for Option Year 1 | $0.00 |
| CLIN 2001 | Option Year 2 | FFP | Preventative Maintenance | 12 | Lot | $0.00 | Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month. |
| CLIN 2002 | Option Year 2 | T&M | Repair - Technician Rate | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 2002 | Option Year 2 | T&M | Repair - Laborer Rate (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 2002 | Option Year 2 | T&M | Repair - Machine Operator (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 2002 | Option Year 2 | T&M | Repair - Foreman (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 2002 | Option Year 2 | T&M | Emergency Repairs - Technician Rate | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 2002 | Option Year 2 | T&M | Emergency Repairs - Laborer Rate (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 2002 | Option Year 2 | T&M | Emergency Repairs - Machine Operator (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 2002 | Option Year 2 | T&M | Emergency Repirs - Foreman (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 2003 | Option Year 2 | FFP | Valve removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. |
| CLIN 2003 | Option Year 2 | FFP | Meter removal and replacement | 16 | Lot | $0.00 | Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 16 per year. Inculde labor and material. |
| CLIN 2003 | Option Year 2 | FFP | Diaphragm removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. |
| CLIN 2004 | Option Year 2 | FFP | PaOneCalls - Utility Locating | 100 | Lot | $0.00 | Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year. |
| CLIN 2004 | Option Year 2 | FFP | Emergency PaOneCalls - Utility Locating | 5 | Lot | $0.00 | Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. |
| Total Evaluated Price for the Option Year 2 | $0.00 |
| CLIN 3001 | Option Year 3 | FFP | Preventative Maintenance | 12 | Lot | $0.00 | Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month. |
| CLIN 3002 | Option Year 3 | T&M | Repair - Technician Rate | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 3002 | Option Year 3 | T&M | Repair - Laborer Rate (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 3002 | Option Year 3 | T&M | Repair - Machine Operator (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 3002 | Option Year 3 | T&M | Repair - Foreman (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 3002 | Option Year 3 | T&M | Emergency Repairs - Technician Rate | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 3002 | Option Year 3 | T&M | Emergency Repairs - Laborer Rate (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 3002 | Option Year 3 | T&M | Emergency Repairs - Machine Operator (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 3002 | Option Year 3 | T&M | Emergency Repirs - Foreman (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 3003 | Option Year 3 | FFP | Valve removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. |
| CLIN 3003 | Option Year 3 | FFP | Meter removal and replacement | 16 | Lot | $0.00 | Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 16 per year. Inculde labor and material. |
| CLIN 3003 | Option Year 3 | FFP | Diaphragm removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. |
| CLIN 3004 | Option Year 3 | FFP | PaOneCalls - Utility Locating | 100 | Lot | $0.00 | Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year. |
| CLIN 3004 | Option Year 3 | FFP | Emergency PaOneCalls - Utility Locating | 5 | Lot | $0.00 | Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. |
| Total Evaluated Price for the Option Year 3 | $0.00 |
| CLIN 4001 | Option Year 4 | FFP | Preventative Maintenance | 12 | Lot | $0.00 | Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month. |
| CLIN 4002 | Option Year 4 | T&M | Repair - Technician Rate | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 4002 | Option Year 4 | T&M | Repair - Laborer Rate (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 4002 | Option Year 4 | T&M | Repair - Machine Operator (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 4002 | Option Year 4 | T&M | Repair - Foreman (when needed) | 96 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 4002 | Option Year 4 | T&M | Emergency Repairs - Technician Rate | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 4002 | Option Year 4 | T&M | Emergency Repairs - Laborer Rate (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 4002 | Option Year 4 | T&M | Emergency Repairs - Machine Operator (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 4002 | Option Year 4 | T&M | Emergency Repirs - Foreman (when needed) | 40 | Hours | $0.00 | Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis. |
| CLIN 4003 | Option Year 4 | FFP | Valve removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. |
| CLIN 4003 | Option Year 4 | FFP | Meter removal and replacement | 13 | Lot | $0.00 | Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 13 per year. Inculde labor and material. |
| CLIN 4003 | Option Year 4 | FFP | Diaphragm removal and replacement | 5 | Lot | $0.00 | Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material. |
| CLIN 4004 | Option Year 4 | FFP | PaOneCalls - Utility Locating | 100 | Lot | $0.00 | Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year. |
| CLIN 4004 | Option Year 4 | FFP | Emergency PaOneCalls - Utility Locating | 5 | Lot | $0.00 | Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. |
| Total Evaluated Price for the Option Year 4 | $0.00 |
| CLIN 0021 | Option to Extend Services (FAR 52.217-8) | FFP | 6-Month Option to Extend Services | 1 | Lot | $0.00 | $0.00 | DO NOT FILL IN (BLOCK IS FOR CONTRACTING TO FILL IN FOR EVALUATION) |
| TOTAL EVALAUATED PRICE >>>>>>>>>>>>>>>> | $0.00 | |||||||
| Entries are required in the Green Shaded cells. |
Enter an HOURLY LABOR RATE for performing ALL approved minor repairs IAW PWS Section 5.2.2 (On-Call / Emergency Repairs). The hours estimated for the emergency/unscheduled services is strictly for use in evaluating offers and will not restrict or obligate the Government to a specified number of hours in any way.
REMINDER: Service Contract Labor Standards. FAR 37.107 and 41 USC Chapter 67, Service Contract Labor Standards, provides for minimum wages and fringe benefits as well as other conditions of work under certain types of service contracts. Service Contract Labor Standards are applicable to this acquisition (Reference Attachment III Wage Determinations).
TOTAL EVALUATED PRICE - This price will be used for "EVALUATION PURPOSES ONLY" as it includes an estimate for time and materials for On-Call/Emergency Repairs. All funding for minor repairs will be approved by the Contracting Officer Representative (COR) prior to commencement of any work.
Instructions: Offerors are instructed to fill in the green shaded cells. This pricing shall also be populated on the signed SF 1449.