Attachment 2 Proposed Pricing Sheet (Updated per Amendment 0002).xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Natural Gas Pipeline Service Contract Federal contract opportunity
Solicitation number
W51AA124R0030
Issued by
Department of the Army

About this file

This document is an Attachment 2 - Proposed Pricing Sheet for Solicitation W51AA1-24-R-0030 for a Natural Gas Pipeline Preventative Maintenance/Repair Service Contract. The solicitation is for a non-personal services contract to provide natural gas pipe operation and maintenance to Tobyhanna Army Depot.

The pricing sheet outlines Contract Line Items (CLINs) for the base year and four option years. The CLINs include: Firm Fixed Price (FFP) for preventative maintenance, Time and Materials (T&M) labor rates for scheduled and emergency repairs, FFP for valve/meter/diaphragm removal and replacement, and FFP for utility locating services. Offerors are instructed to enter pricing for each CLIN, with the total evaluated price to be used for evaluation purposes only. The solicitation states the Service Contract Labor Standards apply to this acquisition.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment 2 - Pricing Table for Solicitation W51AA1-24-R-0030
Natural Gas Pipeline Preventative Maintenance/Repair Service Contract
**This attachment shall be submitted as part of the offeror's proposal.
Contract Line
Number (CLIN)DescriptionQuantityUnitUnit PriceTotal Price
CLIN 0001Base YearFFPPreventative Maintenance12Lot$0.00Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month.
CLIN 0002Base YearT&MRepair - Technician Rate96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 0002Base YearT&MRepair - Laborer Rate (when needed)96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 0002Base YearT&MRepair - Machine Operator (when needed)96Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 0002Base YearT&MRepair - Foreman (when needed)96Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 0002Base YearT&MEmergency Repairs - Technician Rate40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 0002Base YearT&MEmergency Repairs - Laborer Rate (when needed)40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 002Base YearT&MEmergency Repairs - Machine Operator (when needed)40Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 002Base YearT&MEmergency Repirs - Foreman (when needed)40Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 0003Base YearFFPValve removal and replacement5Lot$0.00Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 0003Base YearFFPMeter removal and replacement16Lot$0.00Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 16 per year. Inculde labor and material.
CLIN 0003Base YearFFPDiaphragm removal and replacement5Lot$0.00Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 0004Base YearFFPPaOneCalls - Utility Locating100Lot$0.00Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year.
CLIN 0004Base YearFFPEmergency PaOneCalls - Utility Locating5Lot$0.00Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year.
Total Evaluated Price for the Base Year$0.00
CLIN 1001Option Year 1FFPPreventative Maintenance12Lot$0.00Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month.
CLIN 1002Option Year 1T&MRepair - Technician Rate96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 1002Option Year 1T&MRepair - Laborer Rate (when needed)96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 1002Option Year 1T&MRepair - Machine Operator (when needed)96Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 1002Option Year 1T&MRepair - Foreman (when needed)96Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 1002Option Year 1T&MEmergency Repairs - Technician Rate40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 1002Option Year 1T&MEmergency Repairs - Laborer Rate (when needed)40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 1002Option Year 1T&MEmergency Repairs - Machine Operator (when needed)40Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 1002Option Year 1T&MEmergency Repirs - Foreman (when needed)40Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 1003Option Year 1FFPValve removal and replacement5Lot$0.00Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 1003Option Year 1FFPMeter removal and replacement16Lot$0.00Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 16 per year. Inculde labor and material.
CLIN 1003Option Year 1FFPDiaphragm removal and replacement5Lot$0.00Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 1004Option Year 1FFPPaOneCalls - Utility Locating100Lot$0.00Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year.
CLIN 1004Option Year 1FFPEmergency PaOneCalls - Utility Locating5Lot$0.00Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year.
Total Evaluated Price for Option Year 1$0.00
CLIN 2001Option Year 2FFPPreventative Maintenance12Lot$0.00Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month.
CLIN 2002Option Year 2T&MRepair - Technician Rate96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 2002Option Year 2T&MRepair - Laborer Rate (when needed)96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 2002Option Year 2T&MRepair - Machine Operator (when needed)96Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 2002Option Year 2T&MRepair - Foreman (when needed)96Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 2002Option Year 2T&MEmergency Repairs - Technician Rate40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 2002Option Year 2T&MEmergency Repairs - Laborer Rate (when needed)40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 2002Option Year 2T&MEmergency Repairs - Machine Operator (when needed)40Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 2002Option Year 2T&MEmergency Repirs - Foreman (when needed)40Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 2003Option Year 2FFPValve removal and replacement5Lot$0.00Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 2003Option Year 2FFPMeter removal and replacement16Lot$0.00Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 16 per year. Inculde labor and material.
CLIN 2003Option Year 2FFPDiaphragm removal and replacement5Lot$0.00Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 2004Option Year 2FFPPaOneCalls - Utility Locating100Lot$0.00Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year.
CLIN 2004Option Year 2FFPEmergency PaOneCalls - Utility Locating5Lot$0.00Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year.
Total Evaluated Price for the Option Year 2$0.00
CLIN 3001Option Year 3FFPPreventative Maintenance12Lot$0.00Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month.
CLIN 3002Option Year 3T&MRepair - Technician Rate96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 3002Option Year 3T&MRepair - Laborer Rate (when needed)96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 3002Option Year 3T&MRepair - Machine Operator (when needed)96Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 3002Option Year 3T&MRepair - Foreman (when needed)96Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 3002Option Year 3T&MEmergency Repairs - Technician Rate40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 3002Option Year 3T&MEmergency Repairs - Laborer Rate (when needed)40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 3002Option Year 3T&MEmergency Repairs - Machine Operator (when needed)40Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 3002Option Year 3T&MEmergency Repirs - Foreman (when needed)40Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 3003Option Year 3FFPValve removal and replacement5Lot$0.00Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 3003Option Year 3FFPMeter removal and replacement16Lot$0.00Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 16 per year. Inculde labor and material.
CLIN 3003Option Year 3FFPDiaphragm removal and replacement5Lot$0.00Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 3004Option Year 3FFPPaOneCalls - Utility Locating100Lot$0.00Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year.
CLIN 3004Option Year 3FFPEmergency PaOneCalls - Utility Locating5Lot$0.00Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year.
Total Evaluated Price for the Option Year 3$0.00
CLIN 4001Option Year 4FFPPreventative Maintenance12Lot$0.00Enter a Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will follow the submitted PM plan and will be invoiced once per month.
CLIN 4002Option Year 4T&MRepair - Technician Rate96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 4002Option Year 4T&MRepair - Laborer Rate (when needed)96Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 4002Option Year 4T&MRepair - Machine Operator (when needed)96Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 4002Option Year 4T&MRepair - Foreman (when needed)96Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing scheduled repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 4002Option Year 4T&MEmergency Repairs - Technician Rate40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 4002Option Year 4T&MEmergency Repairs - Laborer Rate (when needed)40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 4002Option Year 4T&MEmergency Repairs - Machine Operator (when needed)40Hours$0.00Enter the fully burdened rate for each hour of machine operator utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 4002Option Year 4T&MEmergency Repirs - Foreman (when needed)40Hours$0.00Enter the fully burdened rate for each hour of foreman utilized performing unscheduled emergency repairs. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 4003Option Year 4FFPValve removal and replacement5Lot$0.00Enter a firm Fixed Price for Valve removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 4003Option Year 4FFPMeter removal and replacement13Lot$0.00Enter a firm Fixed Price for Meter removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Shall replace 13 per year. Inculde labor and material.
CLIN 4003Option Year 4FFPDiaphragm removal and replacement5Lot$0.00Enter a firm Fixed Price for Diaphragm removal and replacement to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year. Inculde labor and material.
CLIN 4004Option Year 4FFPPaOneCalls - Utility Locating100Lot$0.00Enter a firm Fixed Price for utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 100 per year.
CLIN 4004Option Year 4FFPEmergency PaOneCalls - Utility Locating5Lot$0.00Enter a firm Fixed Price for emergency utility locating to be performed In Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. Assume 5 per year.
Total Evaluated Price for the Option Year 4$0.00
CLIN 0021Option to Extend Services (FAR 52.217-8)FFP6-Month Option to Extend Services1Lot$0.00$0.00DO NOT FILL IN (BLOCK IS FOR CONTRACTING TO FILL IN FOR EVALUATION)
TOTAL EVALAUATED PRICE >>>>>>>>>>>>>>>>$0.00
Entries are required in the Green Shaded cells.

Enter an HOURLY LABOR RATE for performing ALL approved minor repairs IAW PWS Section 5.2.2 (On-Call / Emergency Repairs). The hours estimated for the emergency/unscheduled services is strictly for use in evaluating offers and will not restrict or obligate the Government to a specified number of hours in any way.

REMINDER: Service Contract Labor Standards. FAR 37.107 and 41 USC Chapter 67, Service Contract Labor Standards, provides for minimum wages and fringe benefits as well as other conditions of work under certain types of service contracts. Service Contract Labor Standards are applicable to this acquisition (Reference Attachment III Wage Determinations).

TOTAL EVALUATED PRICE - This price will be used for "EVALUATION PURPOSES ONLY" as it includes an estimate for time and materials for On-Call/Emergency Repairs. All funding for minor repairs will be approved by the Contracting Officer Representative (COR) prior to commencement of any work.

Instructions: Offerors are instructed to fill in the green shaded cells. This pricing shall also be populated on the signed SF 1449.