(10_10_24) Natural Gas Pipeline Service Contract Questions and Answers 4.docx

DOCX document 15 KB Posted

Attached to
Natural Gas Pipeline Service Contract
Solicitation number
W51AA124R0030
Issued by

About this file

This document contains Natural Gas Line Services Contract Questions and Answers 4 related to a federal contract opportunity for a non-personal services contract to provide natural gas pipe operation and maintenance to Tobyhanna Army Depot (TYAD).

The key details are:

  • The contract will require verifying pipe sizes and materials per the Performance Work Statement. As-built drawings will be provided at the time of award.
  • A laydown area can be provided at TYAD, with the size requested to be accommodated.
  • If the pipeline is found to be out of compliance with DOT regulations, the contractor must notify the Contracting Officer's Representative and provide a quote for the repair work.
  • TYAD does not have any preferred vendors for materials and equipment.
  • The leak survey will be handled under the Preventative Maintenance bid item.
  • Permission is required to take pictures when performing locates for third-party contractors.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Natural Gas Line Services Contract Questions and Answers 4 Question 1- For the map, are we to assume anything no labeled PE is steel?

Answer 1-- A gas map will be provided. The pipe sizes and materials need to be verified under the contract, per 5.2.1.10 of the PWS. All As-Built drawings will be turned over at the time of award.

Question 2- Can equipment (excavator) and materials (sand padding, pipe fittings, pipe) be stored at the facility? Or must everything be brought onto site and arranged daily?

Answer 2- A lay down area can be provided at TYAD. The size of the area needed must be provided and TYAD will try to accommodate.

Question 3- If the pipeline is out of compliance with DOT CFR 192, is the contractor required to bring into compliance?

Answer 3-If the contractor comes across an area that is out of compliance, he is to notify the COR and provide a Quote. This will be handled under the Repair CLIN Question 4- Does Tobyhanna Army Depot have preferred vendors for pipe, fittings, stone, sand padding, pavement, etc.?

Answer 4- No. TYAD does not have preferred vendors.

Question 5- 1.2 Background states that the natural gas system sizes range from 1-1/4” pe up to an including 6” steel, yet 5.2.1.2.1 states that the system to the best of TYAD’s knowledge is plastic except for some steel service risers. Can you please clarify?

Answer 5- A gas map will be provided. The pipe sizes and materials need to be verified under the contract, per 5.2.1.10 of the PWS. All As-Built drawings will be turned over at the time of award.

Question 6- Is the required leak survey paid under one of the bid items or will this be handled outside of these?

Answer 6- The leak survey will be handled under the Preventative Maintenance bid.

Question 7-When we perform locates for third party contractors, will we be permitted to take pictures of the marks as a record of what was done?

Answer 7- You will need to receive permission to take pictures. There is 1 form that will need to be completed and submitted to the Contract Specialist. We will route to the appropriate parties for approval.

File details come from the government source that posted it. Updated .