(10_3_24) Natural Gas Pipeline Service Contract Questions and Answers 3.docx
DOCX document 15 KB Posted
- Attached to
- Natural Gas Pipeline Service Contract
- Solicitation number
- W51AA124R0030
- Issued by
-
Department of the Army
About this file
This document contains a set of questions and answers related to a federal contract opportunity for a Natural Gas Pipeline Service Contract.
The key details are:
- The contract is for natural gas pipe operation and maintenance services at Tobyhanna Army Depot.
- Question 1 inquires about a laydown yard, to which the answer states that no laydown area was planned to be provided.
- Question 2 asks about the size of a PaOneCall, and the answer indicates that PaOneCall sizes vary by ticket.
- Question 3 asks about the largest valve and type/material to be replaced, and the answer states the largest main is 6".
- Question 4 asks about the main and lateral pipe sizes and materials, and the answer notes that a gas map will be provided and the contractor must verify the information per the Performance Work Statement.
The related federal contract opportunity is solicitation W51AA124R0030 issued by the Department of the Army for the Natural Gas Pipeline Service Contract.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Natural Gas Line Services Contract Questions and Answers 3
Question 1- Will a laydown yard be provided on site for the contractor?
Answer 1- Why is a laydown area required? We were not planning on providing a laydown area.
Question 2- How much will be marked out for a PaOneCall?
Answer 2- PaOneCall sizes vary by ticket.
Question 3- What is the largest valve and type/material to be replaced?
Answer 3- The largest main is 6".
Question 4- What are the main and lateral sizes and material?
Answer 4- A gas map will be provided. The pipe sizes and materials need to be verified under this contract, per 5.2.1.10 of the PWS. All As-Built drawings will be turned over at time of award. Contractor will have to build an accurate set of drawings as per the PWS.