Attachment 1 Proposed Pricing Sheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- CLEAN ROOM Federal contract opportunity
- Solicitation number
- W51AA124Q0020
About this file
This document contains a pricing sheet attachment for a solicitation seeking maintenance services for clean rooms. The contractor shall perform routine preventative maintenance and yearly certification for clean room locations as identified in the performance work statement and preventative maintenance schedules attached. Pricing is requested for firm fixed price CLINs covering the base year and two option years for routine preventative maintenance and yearly certification. Pricing is also requested for time and materials CLINs covering the base year and two option years for unscheduled and emergency maintenance, with fully burdened hourly rates for various labor categories and a fully burdened total cost per round trip for travel. Service Contract Labor Standards are applicable to this acquisition.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W51AA124Q0020 SOLICITATION - Copy.pdf | ||
| Attachement C-Altimeters Gyro PM Schedule.docx | DOCX document | |
| Attachment 2 Wage Determination.pdf | ||
| Attachement D-Maverick EASL PM Schedule.docx | DOCX document | |
| Attachement B-Sidewinder EONV PM Schedule.docx | DOCX document | |
| Attachment A-Clean Room Locations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offerors Pricing Wkst
| Attachment 1- Proposed Pricing Sheet for Solicitation W51AA1-24-Q-0020 |
| **This attachment shall be submitted as part of the offerors proposal. |
| Contract Line | |||||||||
| Number (CLIN) | Description | Quantity | Unit | Hourly | |||||
| Rate | Unit Price | ||||||||
| CLIN 001 | FFP | Base Year - Routine Preventative Maintenance | 1 | Lot | N/A | Enter a Firm Fixed Price for the Base Year for the Routine Preventative Maintenace as described in the PWS. Do not include pricing for Unscheduled/Emergency Maintenance. | |||
| CLIN 002 | FFP | Base Year - Yearly Certification | 1 | Lot | N/A | Enter a Firm Fixed Price for the Base Year for the Yearly Certification as described in the PWS. Do not include pricing for Unscheduled/Emergency Maintenance. | |||
| CLIN 003 | T&M | Base Year - Unscheduled/Emergency Maintenance | $ - 0 | ||||||
| Cleanroom Performance Testing Certifcation Professional (M-F normal duty hours) | 24 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for the Base Year. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||||
| Electrician/Technician (M-F normal duty hours) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for the Base Year. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||||
| Mechanical/HVAC Technician (M-F normal duty hours) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled/Emergency Maintenance for the Base Year. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||||
| General Tradesman Carpenter/Technician (M-F normal duty hours) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for the Base Year. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||||
| Any Technician Listed Above (premium hours- emergency repair) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Emergency Maintenance for the Base Year. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||||
| Total travel cost per trip | 1 | round trip | N/A | Enter the fully burdened total cost to include technician mileage and incidentals to cover one round trip from vendors location to TYAD work site. This shall be the agreed upon value per round trip if needed in performing Unscheduled/Emergency Maintenance for the Base Year. In the event lodging is required, it will be reimbursed on a cost basis. NO OTHER charges shall be considered for meals, tolls, TRAVEL LABOR and similar beyond this fully burdened round trip price. | |||||
| Total Price for Base Year | $ - 0 | Enter Total Price for Base Year |
| CLIN 1001 | FFP | OPTION YEAR 1 - Routine Preventative Maintenance | 1 | Lot | N/A | Enter a Firm Fixed Price for Option Year One for the Routine Preventative Maintenace as described in the PWS. Do not include pricing for Unscheduled/Emergency Maintenance. | |
| CLIN 1002 | FFP | OPTION YEAR 1 - Yearly Certification | 1 | Lot | N/A | Enter a Firm Fixed Price for Option Year One for the Yearly Certification as described in the PWS. Do not include pricing for Unscheduled/Emergency Maintenance. | |
| CLIN 1003 | T&M | OPTION YEAR 1 - Unscheduled/Emergency Maintenance | $ - 0 | ||||
| Cleanroom Performance Testing Certifcation Professional (M-F normal duty hours) | 24 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for Option Year One. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Electrician/Technician (M-F normal duty hours) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for Option Year One. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Mechanical/HVAC Technician (M-F normal duty hours) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for Option Year One. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| General Tradesman Carpenter/Technician (M-F normal duty hours) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for the Option Year One. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Any Technician Listed Above (premium hours- emergency repair) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Emergency Maintenance for Option Year One. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Total travel cost per trip | 1 | round trip | N/A | Enter the fully burdened total cost to include technician mileage and incidentals to cover one round trip from vendors location to TYAD work site. This shall be the agreed upon value per round trip if needed in performing Unscheduled/Emergency Maintenance for Option Year One. In the event lodging is required, it will be reimbursed on a cost basis. NO OTHER charges shall be considered for meals, tolls, TRAVEL LABOR and similar beyond this fully burdened round trip price. | |||
| Total Price for OPTION YEAR 1 | $ - 0 | Enter Total Price for OPTION YEAR 1 |
| CLIN 2001 | FFP | OPTION YEAR 2 - Routine Preventative Maintenance | 1 | Lot | N/A | Enter a Firm Fixed Price for Option Year Two for the Routine Preventative Maintenace as described in the PWS. Do not include pricing for Unscheduled/Emergency Maintenance. | |
| CLIN 2002 | FFP | OPTION YEAR 2 - Yearly Certification | 1 | Lot | N/A | Enter a Firm Fixed Price for Option Year Two for the Yearly Certification as described in the PWS. Do not include pricing for Unscheduled/Emergency Maintenance. | |
| CLIN 2003 | T&M | OPTION YEAR 2 - Unscheduled/Emergency Maintenance | $ - 0 | ||||
| Cleanroom Performance Testing Certifcation Professional (M-F normal duty hours) | 24 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for Option Year Two. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Electrician/Technician (M-F normal duty hours) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for Option Year Two. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Mechanical/HVAC Technician (M-F normal duty hours) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for Option Year Two. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| General Tradesman Carpenter/Technician (M-F normal duty hours) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Unscheduled Maintenance for Option Year Two. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Any Technician Listed Above (premium hours- emergency repair) | 10 | Hours | $ - 0 | Enter the fully burdened rate for each hour of labor utilized in performing Emergency Maintenance for Option Year Two. Do not include pricing for materials. Materials are reimbursed on a cost basis. | |||
| Total travel cost per trip | 1 | round trip | N/A | Enter the fully burdened total cost to include technician mileage and incidentals to cover one round trip from vendors location to TYAD work site. This shall be the agreed upon value per round trip if needed in performing Unscheduled/Emergency Maintenance for Option Year Two. In the event lodging is required, it will be reimbursed on a cost basis. NO OTHER charges shall be considered for meals, tolls, TRAVEL LABOR and similar beyond this fully burdened round trip price. | |||
| Total Price for OPTION YEAR 2 | $ - 0 | Enter Total Price for OPTION YEAR 2 |
REMINDER: Service Contract Labor Standards. FAR 37.107 and 41 USC Chapter 67, Service Contract Labor Standards, provides for minimum wages and fringe benefits as well as other conditions of work under certain types of service contracts. Service Contract Labor Standards are applicable to this acquisition (Reference Attachment 2).