Attachment 1_Approved Mooring Eyes Airfield Diagrams_hawk eagle exempt.pdf

PDF 2 MB Posted

Attached to
Mooring Eyes Repair & Installation at Dirab & KAA
Solicitation number
W519TC-23-R-2076
Issued by

About this file

This document contains diagrams and specifications for installing mooring eyes and taxiway markings at Dirab Airfield in Afghanistan. The Army Materiel Command Contracting Command Rock Island Arsenal is soliciting proposals for W519TC-23-R-2076 to install six mooring eyes on each of 24 parking stands in the Kilo Ramp area, add one grounding point per stand, install a new parking spot in front of Medics, add a new taxi line, and remove taxi lines in front of the Fire Department. Diagrams show details for the parking stand and wash rack mooring eye placements including spacing, markings, and dimensions. The solicitation requests proposals to complete the mooring eye repair and installation work at Dirab Airfield and KAA as specified in the diagrams and specifications provided.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

CUI

Approved Dirab Mooring Eyes

F Taxiway

D Taxiway

E Taxiway

J T ax iw ay

H Ta xi w ay

G T ax iw ay

IERW Hangar Wash

Racks (3) Fire Dept ATCTAITD Hangar

Compass Rose

Arm / Dearm

Kilo Ramp

F Taxiway

D Taxiway

E Taxiway

J T ax iw ay

H Ta xi w ay

G T ax iw ay

IERW Hangar Wash Racks (3)

Fire Dept

ATCTAITD Hangar

Compass Rose

Arm / Dearm

• Install six (6) mooring eyes on each of the 24 Parking Stands indicated in Black/Blue within the KILO RAMP Red Box

• Install one (1) grounding point for each parking stands to create a grounding system.

• Install a new spot (in Black/Yellow) in front of Medics

• Install New taxi line (in Black) in front of Medics

• Remove taxi lines (Red dash lines) in front of Fire Department

• No Parking in front of Fire Department

Kilo Ramp

Attachment 1 – Tab B

Medics

No parking

@ CFR

CUI

Descope Hawk/Eagle Pads

Each sunshade is composed of 6-individual bays

CUI

Sunshade Additional Mooring Eyes .

Center Line Total Length=60’

6” wide 2” Black Border 25’ from edge of apron

Wheel Placement Lines 2 dashes 24” long x 3” wide

1.5” Black border 24” off set from centerline 15’ from apron threshold

Parking Spot Identification Square Square @ 18” x 18” Border @ 3” Wide

Centered on centerline

Parking Spot Designation Numerals Numeral centered in square 12” tall

Numeral 1 in the Western Oriented Parking Spot Numeral 2 in the Eastern Oriented Parking Spot

Legend Existing Mooring Eye

Proposed Mooring Eye

Wheel Stop

Tow Line (center line)

Support Beam

20’ Between Mooring Eyes

15’ Between Mooring Eyes and Edge of Apron

25’ Between Tow Line and Edge of Apron

13’ Between Mooring Eyes and Apron Threshold

15’ Wheel Placement Lines and Apron Threshold

Not to Scale

All markings will be highlighted with black paint

106’ / 32.3m

90’ / 28mAttachment 1 – Tab C

CUI

Wash Rack Mooring Eyes

Center Line 6” wide 2” Black Border Centered on Wash Rack

Wheel Placement Lines 2 dashes 24” Long x 3” Wide

1.5” Black Border 24” Offset From Centerline

2’ Behind Front Mooring Eye

Rack Interior Slab 49’ x 49’ 4 Equal Pads

Legend Wash Rack Drain

Proposed Mooring Eye

Wheel Stop

Tow Line (center line)

Support Beam

20’ Between Mooring Eyes

At least 2’ Between Mooring Eyes and Edge of Any Slab

Not to Scale

All markings will be highlighted with black paint

106’ / 32.3m

90’ / 28m

23’

23’

Drain Approximately 2’4” in Width

Attachment 1 – Tab D

Approved Dirab Mooring Eyes
Slide Number 2
Sunshade Additional Mooring Eyes .
Wash Rack Mooring Eyes

File details come from the government source that posted it. Updated .