Layout Measurements Additional eyes with existing.pdf

PDF 694 KB Posted

Attached to
Mooring Eyes Repair & Installation at Dirab & KAA
Solicitation number
W519TC-23-R-2076
Issued by

About this file

This document provides layout measurements and proposed mooring eye installations for two sites. It details plans to install additional mooring eyes and markings at an existing sunshade and wash rack. At the sunshade, it specifies locations for two new mooring eyes 15 feet from the edge of the apron and wheel placement lines 15 feet from the threshold. It also outlines dimensions for parking spot identification squares and numerals. For the wash rack, it proposes six mooring eyes spaced 20 feet apart along the centerline and wheel placement lines 2 feet behind the front eye. Both sites would be marked with black paint.

The related federal contract opportunity is solicitation number W519TC-23-R-2076 for mooring eye repair and installation at the specified sites at Dirab and KAA. The soliciting agency is the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

CUI

Sunshade Additional Mooring Eyes .

Center Line Total Length=60’

6” wide 2” Black Border 25’ from edge of apron

Wheel Placement Lines 2 dashes 24” long x 3” wide

1.5” Black border 24” off set from centerline 15’ from apron threshold

Parking Spot Identification Square Square @ 18” x 18” Border @ 3” Wide

Centered on centerline

Parking Spot Designation Numerals Numeral centered in square 12” tall

Numeral 1 in the Western Oriented Parking Spot Numeral 2 in the Eastern Oriented Parking Spot

Legend Existing Mooring Eye

Proposed Mooring Eye

Wheel Stop

Tow Line (center line)

Support Beam

20’ Between Mooring Eyes

15’ Between Mooring Eyes and Edge of Apron

25’ Between Tow Line and Edge of Apron

13’ Between Mooring Eyes and Apron Threshold

15’ Wheel Placement Lines and Apron ThresholdNot to Scale

All markings will be highlighted with black paint

106’ / 32.3m

90’ / 28m

CUI

CUI

Wash Rack Mooring Eyes

Center Line 6” wide 2” Black Border Centered on Wash Rack

Wheel Placement Lines 2 dashes 24” Long x 3” Wide

1.5” Black Border 24” Offset From Centerline

2’ Behind Front Mooring Eye

Rack Interior Slab 49’ x 49’ 4 Equal Pads

Legend Wash Rack Drain

Proposed Mooring Eye

Wheel Stop

Tow Line (center line)

Support Beam

20’ Between Mooring Eyes

At least 2’ Between Mooring Eyes and Edge of Any Slab

Not to Scale

All markings will be highlighted with black paint

106’ / 32.3m

90’ / 28m

23’

23’

Drain Approximately 2’4” in Width

File details come from the government source that posted it. Updated .