Attachment 0013 - Solicitation Questions and Answers dated 2 July 2024.pdf
PDF 189 KB Posted
- Solicitation number
- W519TC-23-R-0108
About this file
This document contains Solicitation Questions and Answers dated 2 July 2024 related to a federal contract opportunity for Canister Grenades - Metal Components. The questions and answers provide details on the first article inspection requirements, conformance inspection sampling, acceptance criteria, and classification of characteristics for the cup component under Drawing 13-19-1067. Key details include the verification methods, major and minor characteristics to be inspected, material properties certification, and lot numbering requirements. This information supplements the details provided in the related federal contract opportunity for a 5-year IDIQ contract for metal parts and components for canister grenades, issued as a 100% small business set-aside under NAICS 332999.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Questions and Answers dated 2 July 2024
Q1: I noticed that paragraph 4.3.5.3 references paragraph 3.2 and 3.6, but they aren’t included.
A1: See below for updated excerpt:
3.2 (CUI) Materials, components, and assemblies. All materials, components, and assemblies shall comply with the requirements and referenced specifications on Drawing 13-19- 1064, subsidiary drawings, and herein as applicable.
3.6 (CUI) Workmanship. The grenade, components, and assemblies shall be free from smoke mix contamination, foreign matter, and damage such as dents, cracks, wrinkles, or deformation. Exterior surface coating shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined, required packaging material shall be thoroughly dry.
4.2 (CUI) First article inspection.
4.2.2 (CUI) First article sampling. A first article sample shall be submitted for inspection in accordance with Table II. The sample shall be randomly selected from the first article lot, and of individual components and assemblies as specified.
4.2.3 (CUI) Inspection requirements. The first article sample items shall be examined and tested for compliance with all of the requirements of the applicable drawings and this specification.
4.2.4 (CUI) Acceptance criteria. If any first article sample item fails to comply with any of the applicable requirements, the first article sample shall be rejected. The Government reserves the right to terminate inspection upon any failure to comply with any of the requirements.
(CUI) TABLE I. First article sampling.
4.3 (CUI) Conformance inspection.
4.3.2 (CUI) Sampling. Sampling shall be conducted in accordance with the conformance criteria of the classification of characteristics in 4.3.5. Samples shall be selected at random.
Item Drawing Verification Inspection
Method
Cup 13-19-1067 32 for examination 4.2.3, 4.3.5.3
4.3.3 (CUI) Acceptance criteria. Failure of any sample item to conform to any characteristic in the classification of characteristics based on the sampling and acceptance criteria specified therein shall be cause for rejection of the lot represented.
4.3.4 (CUI) Critical characteristics. Unless otherwise specified in the classification of characteristics, the sampling and acceptance criteria for critical characteristics shall be in accordance with the critical characteristics paragraph of MIL-STD-1916. If any critical defects are encountered the special reservations for critical nonconformance paragraph of
MIL-STD-1916 shall apply.
4.3.5 (CUI) Classification of characteristics. Conformance inspections shall be as specified in the following classification of characteristics paragraphs. When verification levels (VLs) are specified for selection of sample sizes and acceptance criteria, the sampling plans of MIL-STD-1916 shall apply unless otherwise specified.
Paragraph
4.3.5.3
(CUI)
Title
Cup Sheet 1 of 1
Drawing Number
13-19-1067 Next Higher Assembly
13-19-1066
Category Examination or Test Conformance
Criteria
Requirement
Paragraph Inspection Method
Critical None Defined
Major
101 Shoulder outer diameter Note 1 3.2 AIE
102 Shoulder depth Note 1 3.2 AIE
103 Conical major inner diameter Note 1 3.2 AIE
104 Conical minor inner diameter Note 1 3.2 AIE
105 Flange width Note 1 3.2 AIE
106 Cup cavity depth Note 1 3.2 AIE
107 Material thickness 4.4.5 3.2 4.4.5
Minor
201 Workmanship VL-II 3.6 Visual
Notes:
1. Tool control. 2 cups from each die set shall be inspected at the beginning and end of each shift. If any nonconformance is found all cups produced since the last inspection shall be rejected. To qualify the die set(s), before first article, and after any rework, reconditioning, replacement or after 1000 cups produced from the die set, 5 cups shall be examined for all
4.4.4 (CUI) Lot numbering and ammunition data cards. Verify that an ammunition lot number has been assigned to each lot of grenades and that the ammunition data card information is complete and correct.
4.4.5 (CUI) Material properties and certification. Verify by examination of objective evidence that the material, components, and assemblies have been tested and accepted in accordance with specification requirements.
dimensions.
File details come from the government source that posted it. Updated .