Attachment 0013 - Solicitation Questions and Answers dated 2 July 2024.pdf

PDF 189 KB Posted

Attached to
Canister Grenades - Metal Components IDIQ - Solicitation
Solicitation number
W519TC-23-R-0108
Issued by

About this file

This document contains Solicitation Questions and Answers dated 2 July 2024 related to a federal contract opportunity for Canister Grenades - Metal Components. The questions and answers provide details on the first article inspection requirements, conformance inspection sampling, acceptance criteria, and classification of characteristics for the cup component under Drawing 13-19-1067. Key details include the verification methods, major and minor characteristics to be inspected, material properties certification, and lot numbering requirements. This information supplements the details provided in the related federal contract opportunity for a 5-year IDIQ contract for metal parts and components for canister grenades, issued as a 100% small business set-aside under NAICS 332999.

View the file

Other files

File Type Posted
Amendment 0007 - Solicitation W519TC-23-R-0108.pdf PDF
Attachment 0016 - EPA Adjustment dated 22Aug2024.xlsx XLSX spreadsheet
Amendment 0006 - Solicitation W519TC-23-R-0108.pdf PDF
Attachment 0015 - Price Matrix dated 22Aug2024.xlsx XLSX spreadsheet
Amendment 0005 - Solicitation W519TC-23-R-0108.pdf PDF
Amendment 0004 - Solicitation W519TC-23-R-0108.pdf PDF
Attachment 0014 - Solicitation Questions and Answers dated 11 July 2024.docx DOCX document
Amendment 0003 - Solicitation W519TC-23-R-0108.pdf PDF
Amendment 0002 - Solicitation W519TC-23-R-0108.pdf PDF
Attachment 0012 - Solicitation Question and Answer dated 25 June 2024.pdf PDF
Amendment 0001 - Solicitation W519TC-23-R-0108.pdf PDF
Attachment 0003 - Statement of Work dated 29 February 2024.pdf PDF
Attachment 0001 - Price Matrix dated 9 May 2024.xlsx XLSX spreadsheet
Attachment 0002 - EPA Worksheet dated 9 May 2024.xlsx XLSX spreadsheet
Attachment 0009 - Section M - Evaluation Factors For Award.pdf PDF
Attachment 0005 - Drawing 13-19-1067 IR - Cup.pdf PDF
Attachment 0010 - Past Performance Questionnaire (PPQ) dated 21 February 2024.docx DOCX document
Solicitation W519TC-23-R-0108 - Canister Grenades.pdf PDF
Attachment 0011 - ASSIST Instructions.pdf PDF
Exhibit A - Contract Data Requirements List.pdf PDF
Attachment 0008 - Section L - Instructions to Offerors.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Questions and Answers dated 2 July 2024

Q1: I noticed that paragraph 4.3.5.3 references paragraph 3.2 and 3.6, but they aren’t included.

A1: See below for updated excerpt:

3.2 (CUI) Materials, components, and assemblies. All materials, components, and assemblies shall comply with the requirements and referenced specifications on Drawing 13-19- 1064, subsidiary drawings, and herein as applicable.

3.6 (CUI) Workmanship. The grenade, components, and assemblies shall be free from smoke mix contamination, foreign matter, and damage such as dents, cracks, wrinkles, or deformation. Exterior surface coating shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined, required packaging material shall be thoroughly dry.

4.2 (CUI) First article inspection.

4.2.2 (CUI) First article sampling. A first article sample shall be submitted for inspection in accordance with Table II. The sample shall be randomly selected from the first article lot, and of individual components and assemblies as specified.

4.2.3 (CUI) Inspection requirements. The first article sample items shall be examined and tested for compliance with all of the requirements of the applicable drawings and this specification.

4.2.4 (CUI) Acceptance criteria. If any first article sample item fails to comply with any of the applicable requirements, the first article sample shall be rejected. The Government reserves the right to terminate inspection upon any failure to comply with any of the requirements.

(CUI) TABLE I. First article sampling.

4.3 (CUI) Conformance inspection.

4.3.2 (CUI) Sampling. Sampling shall be conducted in accordance with the conformance criteria of the classification of characteristics in 4.3.5. Samples shall be selected at random.

Item Drawing Verification Inspection

Method

Cup 13-19-1067 32 for examination 4.2.3, 4.3.5.3

4.3.3 (CUI) Acceptance criteria. Failure of any sample item to conform to any characteristic in the classification of characteristics based on the sampling and acceptance criteria specified therein shall be cause for rejection of the lot represented.

4.3.4 (CUI) Critical characteristics. Unless otherwise specified in the classification of characteristics, the sampling and acceptance criteria for critical characteristics shall be in accordance with the critical characteristics paragraph of MIL-STD-1916. If any critical defects are encountered the special reservations for critical nonconformance paragraph of

MIL-STD-1916 shall apply.

4.3.5 (CUI) Classification of characteristics. Conformance inspections shall be as specified in the following classification of characteristics paragraphs. When verification levels (VLs) are specified for selection of sample sizes and acceptance criteria, the sampling plans of MIL-STD-1916 shall apply unless otherwise specified.

Paragraph

4.3.5.3

(CUI)

Title

Cup Sheet 1 of 1

Drawing Number

13-19-1067 Next Higher Assembly

13-19-1066

Category Examination or Test Conformance

Criteria

Requirement

Paragraph Inspection Method

Critical None Defined

Major

101 Shoulder outer diameter Note 1 3.2 AIE

102 Shoulder depth Note 1 3.2 AIE

103 Conical major inner diameter Note 1 3.2 AIE

104 Conical minor inner diameter Note 1 3.2 AIE

105 Flange width Note 1 3.2 AIE

106 Cup cavity depth Note 1 3.2 AIE

107 Material thickness 4.4.5 3.2 4.4.5

Minor

201 Workmanship VL-II 3.6 Visual

Notes:

1. Tool control. 2 cups from each die set shall be inspected at the beginning and end of each shift. If any nonconformance is found all cups produced since the last inspection shall be rejected. To qualify the die set(s), before first article, and after any rework, reconditioning, replacement or after 1000 cups produced from the die set, 5 cups shall be examined for all

4.4.4 (CUI) Lot numbering and ammunition data cards. Verify that an ammunition lot number has been assigned to each lot of grenades and that the ammunition data card information is complete and correct.

4.4.5 (CUI) Material properties and certification. Verify by examination of objective evidence that the material, components, and assemblies have been tested and accepted in accordance with specification requirements.

dimensions.