This pre-proposal conference presentation outlines requirements for a design-build construction contract to build a quarter mile running track at Bradley Air National Guard Base in East Granby, Connecticut. The project magnitude is between $500,000 to $1 million, with a single award contemplated. The solicitation is set aside for small businesses with a NAICS code of 237990 and size standard of $39.5 million average annual revenue. Proposals are due by August 27, 2020 with award announcement anticipated within 30-60 days thereafter. The presentation provides guidance on the technical evaluation criteria and required proposal exhibits, including references to be submitted by the deadline. Questions must be submitted by August 17th to the identified contracting officers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W50SC2-20-R-0005 Amendment 0001 20200821.pdf | ||
| 20200821 RFI Log CTANG Track.pdf | ||
| 20200820 RFI Log CTANG Track CEKT182732.pdf | ||
| 20200813 RFI Log CTANG Track CEKT182732.pdf | ||
| CES CEKT182732 Pre-Proposal Presentation.pdf | ||
| Pre-Proposal Attendance.pdf | ||
| EXHIBIT A.docx | DOCX document | |
| EXHIBIT B.docx | DOCX document | |
| W50SC2-20-R-0005.pdf | ||
| EXHIBIT C.docx | DOCX document | |
| EXHIBIT D.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL CONFERENCE/SITE VISIT
W50SC2-20-R-0005
PROJECT NO. CEKT182732
CONSTRUCT QUARTER MILE RUNNING
TRACK
BRADLEY ANGB,CT
06 AUGUST 2020
INTRODUCTION
Base Civil Engineer (BCE): Lt Col Henry Chmielinski
Deputy Base Civil Engineer (DBCE): Mr. Cory Knick
Contracting Officer: MSgt Eric Hoss
Contracting Officer’s Representative (COR): SSgt Luis Juro
Base + Option Line Items 180 Days after NTP
This is a design-build project
Magnitude:$500,000- $1,000,000
One Firm-fixed Price Contract Will Be Awarded
Project is being solicited 100% Small Business Set Aside
The contract will be awarded based on the Best Value to the Government
Evaluation Factors - Technical,Price and Past Performance
The Statement of Work (SOW), Plans and Specifications are available at beta.sam.gov by requesting access
Access to these documents will be granted to General Contractors (GCs) with the intent of providing a proposal for the project
• Offeror portion of SF 1442
• Section 00010 - Pricing Info - All Line
Items & PRICING SCHEDULE
• Introductory Page - Section 00110 lists required information
• Section 00600 - Reps & Certs
• Complete Reps & Certs on the web at beta.sam.gov
• Complete & return Reps & Certs in Section 00600
Part I - Technical Capability
Experience & Capability Construction Schedule Quality Control
Subfactor 1 - Experience & Capability Discuss any previous projects similar to this project in terms of scope, size and complexity If no experience, offeror must explain how they will overcome the lack of experience
Subfactor 2 - Schedule
Schedule in a Gantt Chart using October 30, 2020 Notice to Proceed (NTP)
Subfactor 3 - Quality Control
Quality Control Staff with Lines of Authority to meet contract requirements
Exhibit A - Part 1 - Performance Relevancy Questionnaires – Use Exhibit Format!
Complete not more than three (3) forms for
Relevant Contracts Completed Or Substantially Completed (70%+) In The Last Five (5)Years
Exhibit A - Part 2 - Describe compliance with FAR 52.219-8, Utilization of Small Businesses
Send Questionnaires for the Exhibit A Projects to your references
“Do This Early” - must be rec’d by the Contracting Office by the closing date
• Proposal Due 1400 Hours (2:00 P.M.) on August 27, 2020
• Proposal Must Be Signed By Officer Of Your Company
• No Facsimile Or Electronic Offers
• Send or deliver to: (follow instructions in Section
00100). Hand carried proposals:
Camp Hartell Building P-123 580 North Street Windsor Locks, CT 06096
Reference Questionnaires Are Also Due By This Time AndDate
Send Reference Questionnaires Out
EARLY!
Return to Contracting Officer Via E-mail:
eric.m.hoss.mil@mail.mil
Exhibit A - Performance Relevancy Questionnaire
PART 1 (NTE 3) PART 2 (1)
Exhibit B - Subcontractor/Teaming Partner/Key Personnel Info & Consent Form (if applicable)
Exhibit C - Reference Questionnaire Package
Exhibit D – Letter of Commitment of Key Subcontractor and/or Key Personnel
• Process Is Detailed In RFP Section 00120
• Carefully Review Section 00120 When Preparing Proposal
• Comply With Section 00100 And 00110 Requirements
• Failure To Furnish A Complete Proposal May Result In Elimination From Consideration
• Award is contemplated to be made without discussions - Do Not anticipate a chance to make corrections or changes
• Your first proposal will probably be your only proposal!
• Read the solicitation requirements carefully!
• Consider using Section 00120 to “rate” yourself before submitting the proposal
• Is it complete?
When Using A Subcontractor To Obtain/Enhance Relevancy Provide Subcontractor Consent Form, Exhibit B, Or it Will Not Be Considered
Award In This Process Does Not Necessarily Mean The Lowest Price Wins
All amendments will be posted on the beta.sam.gov web site
Check site regularly for changes & refresh the page
After closing no information will be available until award Awards will be posted to the web Results should be announced in approximately 30-60 days after the solicitation closing date FAR 52.219-14, Limitations on Subcontracting Apply-
Small Business must perform 15% of cost of contract, not including the cost of materials with its own employees
• Questions Must Be Submitted Via E-mail To:
bradford.c.erdmann.mil@mail.mil and eric.m.hoss.mil@mail.mil. Submit Questions NLT COB August 17, 2020
• Questions Received After August 17, 2020 May Be Held And Addressed After RFP Closing With Those Offerors Determined To Be In The Competitive Range If Discussions Are Deemed Necessary
• Do Not Call Technical Personnel Or A&E -This Will Delay Getting An Answer!
2:00 p.m EST August 27, 2020
DON’T FORGET TO HAVE REFERENCES SENT IN
BY THIS TIME & DATE