Design-Build Quarter Mile Running Track, 103rd AW, Bradley ANGB, East Granby, CT
Solicitation number
W50SC2-20-R-0005
Issued by

About this file

This pre-proposal presentation outlines requirements for a construction contract to build a quarter mile running track at Bradley Air National Guard Base in East Granby, Connecticut. The project involves civil design, site preparation including tree clearing and grading, stormwater drainage and erosion control, track surface paving, and is a small business set-aside solicited by the Department of the Army National Guard with a project magnitude between $500,000 and $1 million. Work must be completed between 7:00 a.m. and 4:30 p.m. Monday through Friday, with early morning hours and utility interruptions requiring prior approval. COVID-19 medical screening is mandatory, and contractor employee screening, vetting procedures and badging are required prior to unaccompanied base access.

View the file

Other files

File Type Posted
W50SC2-20-R-0005 Amendment 0001 20200821.pdf PDF
20200821 RFI Log CTANG Track.pdf PDF
20200820 RFI Log CTANG Track CEKT182732.pdf PDF
20200813 RFI Log CTANG Track CEKT182732.pdf PDF
Pre-Proposal Attendance.pdf PDF
W50SC2-20-R-0005 Pre-Proposal 06 AUG 20.pdf PDF
EXHIBIT A.docx DOCX document
EXHIBIT B.docx DOCX document
W50SC2-20-R-0005.pdf PDF
EXHIBIT C.docx DOCX document
EXHIBIT D.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CEKT182732

Construct Quarter Mile Track Pre-Proposal Presentation

6 August 2020

FY20 SRM

CEKT182732

Construct Quarter Mile Track Pre-Proposal Presentation

6 August 2020

FY20 SRM

103d AW - BRADLEY ANG, CT

Ready – Reliable - RelevantJune 2014

Purpose NOTE: This briefing is not meant to be all inclusive nor does it relieve the general contractor of all requirements IAW Contract Drawings and Specifications

Purpose:

• Highlight certain key components/details to aid prospective general contractors and ensure Owner/Government concerns and mission requirements are addressed

PROJECT INFORMATION:

Project Identification: Construct Quarter Mile Track

Project Location: Bradley Air National Guard Base, East Granby, Connecticut

Owner: Connecticut Air National Guard

Contracting Officer: MSgt Eric Hoss, United States Property & Fiscal Office for Connecticut, 360 Broad Street, Hartford, CT 06105

Overview

WORK COVERED BY CONTRACT DOCUMENTS:

• Design and construct Quarter Mile Running Track located at Bradley Air National Guard Base East Granby, CT 06026.

• The Work includes civil design, tree clearing, grading, site work, storm water drainage, paving, erosion control plan, and storm water plan.

Work Restrictions

On-Site Work Hours:

7:00 a.m. to 4:30 p.m., Monday through Friday.

Note: Early Morning Hours: Requires prior approval of Owner/Government.

Existing Utility Interruptions:

• Do not interrupt utilities serving surrounding facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

• Notify Owner not less than two days in advance of proposed utility interruptions.

• Obtain Owner's written permission before proceeding with utility interruptions.

Contract CBYD Requirements: CBYD coordination will be with 103d Civil Engineering POC Kenneth Bergeron at Bldg 17 (860) 292-2744

NOTE: ALL CBYD MUST BE SCHEDULED AT LEAST 5 BUSINESS DAYS BEFORE

DIGGING IS AUTHORIZED

Work Restrictions Cont.

Nonsmoking Building:

• Smoking is not permitted within any buildings or within 25 feet (8 m) of bldg. entrances, operable windows, or outdoor-air intakes

Employee Screening, Vetting Procedures & Badging:

• Complete Contract-Contractor Identification Letter (CCIL)

• CCIL requires fifteen (15) Days for processing

• Once cleared for base access you must be badged to work unaccompanied

• Badging Hours: 0730-0930 Tues &Thurs, 0730-0830 Wed, Fri & every other Mon; or if an appointment is scheduled during off times in advance with SFS

SCHEDULE OF OPTIONAL BID ITEMS

(OBIs)

Optional Bid Item #1:

1. Additional lane stripping (3 lanes)

Optional Bid Item #2:

1. Cleared and seeded infield

COVID 19

Medical Screening:

• A 100% COVID-19 screening will be mandatory to ALL personnel entering the installation Guidance:

• U.S. Center for Disease Control and Prevention (“CDC”) http://www.cdc.gov/coronavirus/2019-nco

• Occupational Safety and Health Administration (“OSHA”) guidance on the virus Identification http://www.osha.gov/covid-19

• The CT Department of Health webpage https://portal.ct.gov/coronavirus

• KO/COR will provide updates from the 103d AW

Ready – Reliable - Relevant

Additional Comments

Utilities: The contractor will be responsible for:

All temp utility services Any special fees/extra fees any utility company might issue;

Back flow meters are mandatory