This document contains questions and answers regarding a federal solicitation for 2021 consolidated construction projects for the Vermont Army National Guard. The projects include concrete demolition and replacement, installation of three new roll up doors, installation of above and below ground communication conduits and boxes, roadway and parking lot line striping, HVAC equipment replacement and installation, fire hydrant maintenance and repair, asphalt and PCC repairs, hangar trim removal and new gutter installation, new electrical outlets and lighting installation, and VAV control valve, balance valve and piping installation for HVAC equipment. Bidders were required to submit all questions by August 23, 2021, which is five working days prior to the bid opening date. The solicitation number is W50S9C-21-B-0004 and was issued by the Department of the Army Vermont Army National Guard.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S9C‐21‐B‐0004
2021 CONSOLIDATED CONSTRUCTION PROJECTS
QUESTIONS and ANSWERS
As of 8/18/21
1. For the hydrant repair project, the project description calls for a flow test on any “functional repair” work. What constitutes functional repair work and how many flow tests should we allow for if we don’t actually know which hydrants might need work until after we’ve started the repairs?
Answer: At this time, functional repair would only apply to hydrants #18 and #32 which require internal replacement parts as noted under Section 2, Hydrant Repair. Plan on performing two complete flow tests with reports.
2. For flow testing these hydrants, which test do we use, a PITOT test or does it just need to be witnessed by the fire department and base operations?
Answer: Please complete a PITOT flow test and submit reports to include a static hydrant and nearest residual hydrant.
3. Will we have access to all hydrants during the walk through? If not, can someone take pictures of each hydrant so we can verify their condition and manufacture/model?
Answer: The government cannot provide access to all hydrants during walkthrough. Please see file “Hydrant Photos.pdf” for a representative photo taken as well as photos of damaged hydrants #18 and #32.
4. There doesn’t seem to be a specification or model number for the roll up doors or the overhead fire door. Please provide.
Answer: The existing overhead door is manufactured by Overhead Door. The government did not provide a brand or model number for the proposed door, as that would have excluded competition from other manufacturers. Doors need to meet performance characteristics provided.
5. The gutter installation notes call for us to install a gutter compatible with the existing roof panel and per the manufactures installation details. What is the manufacture of the existing roof panel?
Answer: The original drawings for B131 list Butler Construction on the roof details.
6. What is the color of the existing metal eave trim we are supposed to match for the new gutter?
Answer: We do not have documentation on the exact color of the panels. The Contractor shall provide samples to color match the existing building as closely as possible.
7. (From site visit) B300 – What are the distances from the VAV’s to the floor?
Answer: Measurements were taken from the floor to drop ceiling locations in the VAV vicinities. The follow heights were recorded:
Room 1 – 9ft Room 4 – 9ft Room 5 – 14ft Room 7 – 8ft Room 10a – 14ft (slopes downward halfway) Room 10b – 14ft (slopes downward halfway) Room 13 – 9ft Room 14 – 9ft Room 18 – 14ft Room 25 – 14ft Room 28 – 11ft Room 29 – 9ft
8. (From site visit) B150 Tool Room & Lights – Is the wall construction CMU or stud on the NE wall of rm 166? Wall between rm 165 and rm 166.
Answer:
9. (From site visit) B150 Tool Room & Lights – Does the proposed conduit going to LP-4 need to be painted?
10. (From site visit) B150 Tool Room & Lights – Please get more information on Room 162 and its ceiling/wall construction.
11. (From site visit) B150 Tool Room & Lights – Please supply more information about where the nearest interior circuit would be located for the exterior lights.
12. (From site visit) B140 Radio Room HVAC – Please get photos of the elect/mech rooms and of the roof.
13. (From site visit) B140 Radio Room HVAC – Please supply as-builts of the concrete wall construction in B140’s basement.
14. (From site visit) B140 Radio Room HVAC – Please supply condenser pad details for the outside units.
15. (From site visit) B131 Gutter – What is the height of B131?
16. (From site visit) Munitions IDS Infrastructure – Can the conduit be run below the sheetrock in the mechanical room?
Answer: Yes.
17. (From site visit) Munitions IDS Infrastructure – In the drawings, it shows a conduit path through one of the wing walls before it gets to the exterior panel. Is this coring through, or wrapping around, like the other conduits seen on the site visit?
Answer: The conduit can wrap around the concrete prior to the panel.
18. (From site visit) Munitions IDS Infrastructure – Can the size of the conduit be decreased in order to decrease the size of the core into the bunkers?
19. (From site visit) Munitions IDS Infrastructure – There was an empty conduit observed on the exterior of Bunker K. What is that?
20. (From site visit) B312 Vehicle Lift – What is the contractor’s responsibility regarding the vehicle lift itself?
21. (From site visit) B312 Vehicle Lift – There was radiant flooring discussed within the concrete slab during the site visit. What is the status of that?
22. (From site visit) B310 Secure DFAC Openings – Can the ceilings be modified to accommodate the roll up doors?
23. (From site visit) B310 Secure DFAC Openings – Are the proposed doors automatic or manual?
24. (From site visit) B310 Secure DFAC Openings – Can you get more information for what is above the ceilings where the roll up doors are proposed?
REMINDER – ALL QUESTIONS MUST BE SUBMITTED BY MONDAY 23 AUGUST –