This document contains details of a federal contract opportunity for construction projects at the Vermont Army National Guard. The solicitation requests proposals for project work including concrete demolition and replacement, installation of roll up doors, communication conduit and boxes, roadway and parking lot striping, HVAC equipment installation and maintenance, asphalt and concrete repairs, replacement of hangar trim and installation of gutters and downspouts, new electrical outlets and lighting, removal and replacement of an overhead door, and installation of VAV control valves and piping for HVAC equipment. The solicitation number is W50S9C-21-B-0004 for the VTANG 2021 Consolidated Construction Projects opportunity issued by the Department of the Army Vermont Army National Guard. Proposals are due based on the standard solicitation timeline.

View the file

Other files for this federal contract opportunity

Other files attached to VTANG 2021 Consolidated Construction Projects, newest first.
File Type Posted
Bid - Abstract of Offers W50S9C-21-B-0004.pdf PDF
Bid Attendance Sheet W50S9C-21-B-0004.pdf PDF
Typical spall repair 2.pdf PDF
Typical spall repair 1.pdf PDF
Typical edge crack.pdf PDF
Q and A as of 25Aug21 W50S9C21B0004 2021 Consolidated Construction Projects.pdf PDF
Amendment 0001 W50S9C-21-B-0004.pdf PDF
Typical spall repair 3.pdf PDF
B150 MOC ceiling and lighting.pdf PDF
B150 2nd Floor Tool Room.pdf PDF
Q and A as of 24Aug21 W50S9C21B0004 2021 Consolidated Construction Projects.pdf PDF
B310 Openings.pdf PDF
B140 Basement Wall.pdf PDF
Q and A as of 20Aug21 W50S9C21B0004 2021 Consolidated Construction Projects.pdf PDF
Q and A as of 18Aug21 W50S9C21B0004 2021 Consolidated Construction Projects.pdf PDF
Hydrant Photos.pdf PDF
Attendance Roster Pre-Bid and Site Visit - 2021 Consolidated Const 13Aug21.pdf PDF
Pre-Bid Meeting Minutes W50S9C21B0004 2021 Consolidated Construction.pdf PDF
W50S9C-21-B-0004 2021 Consolidated Construction Projects.pdf PDF
2021 Consolidated Projects Plans Photos and Attachments R1 6-24-2021.pdf PDF
2021 Consolidated Projects Combined Specifications R1 6-17-2021.pdf PDF
SOW 2021 Consolidated Projects R2 7-11-2021.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1283642166N Text Box Approximate location of proposed conduit run to radio room below

1283642166N Pencil

1283642166N Pencil

1283642166N Pencil

1283642166N Text Box Proposed Roof Conduit Run

1283642166N Pencil

1283642166N

Attach to existing unistrut along cable trough

Pencil

1283642166N Pencil

1283642166N Text Box Approximate location fo conduit run to enter to electrical room below (2 floors)

1283642166N

Proposed roof conduit run to use existing unistrut

Wall cavity located here to run conduit from roof to electrical room

1283642166N Text Box Proposed conduit run from radio room to roof (internal in wall)

1283642166N

Cut and patch as necessar to gain access into wall for conduit run

1283642166N Pencil

1283642166N

Proposed Conduit run from above